CHANDLER, OK —
OSHA Inspection: BAKER WELL SERVICE, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of BAKER WELL SERVICE, INC. in LONG #3 WELL, SEC 20-15N-4E LINCOLN CTY, CHANDLER, OK 74834 (NAICS 213112). OSHA activity number 312383359.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BAKER WELL SERVICE, INC.
- Site address
- LONG #3 WELL, SEC 20-15N-4E LINCOLN CTY
- City
- CHANDLER
- State
- OK
- ZIP
- 74834
- Mailing
- 406 S BETHEL RD, STILLWATER, OK 74075
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 213112
- SIC code (legacy)
- 1389
- Employees
- 4
- Ownership type
- A
Citations
8 citations on file for this inspection.
5(a)(1)
- Issued
- Oct 5, 2009
- Abate by
- Oct 9, 2009
- Penalty
- Initial $1,500 · Current $750 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm: Long #2 oil/gas well; on or about April 16, 2009, employees were engaged in the operation of a well service rig to replace the well down hole pump, they had pulled the well sucker rod storing it in the rig mast rod rack; the rig stabilizing guylines were not attached to anchors leave the rig stabilized only by rear carrier supports and guylines attached to the carrier front. This exposed all the employees to the hazards of a rig over turning as being struck by rig and well components, and falling from mast elevations upwards of 80 feet. The American Petroleum Institute (API) Recommended Practice (RP) 54, Recommended Practice for Occupational Safety for Oil and Gas Well Drilling and Servicing Operations 6.3.2 requires that the rig be rigged up in a safe manner before starting well operations with the rig, and 9.2.10 requires that the rig guylines be properly tensioned prior to imposing a load on the derrick or mast. Among other methods, one feasible and acceptable abatement method to correct this hazard is to assure that the rig is safely rigged up prior to the imposition of any operational load on the rig mast and that the guylines are properly tensioned to certified anchors.d
Recent events (2)
- — F (S) $750.00
- — Z (S) $1500.00
5(a)(1)
- Issued
- Oct 5, 2009
- Abate by
- Oct 9, 2009
- Penalty
- Initial $1,500 · Current $750 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm: Long #2 well; on or about April 16, 2009, service rig employees were engaged in the well work on an oil/gas well to replace its down hole pump, this required that the derrick hand be working in the rig mast to manually place sucker rods into the mast rod rack; no secondary means of emergency egress was provided for the employee. This prevent the derrick from making timely emergency egress from the mast during rig emergencies with hazards as: Fire, explosion, flying objects and rig collapse. The American Petroleum Institute (API) Recommended Practice for Occupational Safety for Oil and Gas Well Drilling Servicing Operations, RP 54, 6.10.1 requires than an auxiliary means of escape be installed prior to the derrick hand working on the mast. Among other methods, one feasible and acceptable abatement method to correct this hazard is to assure that the escape system is installed in accordance the manufacturer's instruction prior the placement of the derrick hand in the mast.
Recent events (2)
- — F (S) $750.00
- — Z (S) $1500.00
1910.27 D02
- Issued
- Oct 5, 2009
- Abate by
- Oct 9, 2009
- Penalty
- Initial $750 · Current $375 Reduced
Recent events (2)
- — F (S) $375.00
- — Z (S) $750.00
1910.132 A
- Issued
- Oct 5, 2009
- Abate by
- Oct 30, 2009
- Penalty
- Initial $750 · Current $750
Recent events (2)
- — F (S) $750.00
- — Z (S) $750.00
1910.132 D01
- Issued
- Oct 5, 2009
- Abate by
- Oct 30, 2009
Recent events (2)
- — F (S)
- — Z (S)
1910.1030 C01 I
- Issued
- Oct 5, 2009
- Abate by
- Nov 23, 2009
- Penalty
- Initial $450
Recent events (2)
- — F (O)
- — Z (S) $450.00
1910.1200 E01
- Issued
- Oct 5, 2009
- Abate by
- Nov 23, 2009
- Penalty
- Initial $450
Recent events (2)
- — F (O)
- — Z (S) $450.00
1904.1 A02
- Issued
- Oct 5, 2009
- Abate by
- Nov 23, 2009
Recent events (2)
- — F (O)
- — Z (O)
More inspections in this industry (NAICS 213112)
More inspections in OK
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 312383359.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.