NAUGATUCK, CT —
OSHA Inspection: QUEEN ANNE WOODWORKING, LLC
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of QUEEN ANNE WOODWORKING, LLC in 74 GREAT HILL ROAD, NAUGATUCK, CT 06770 (NAICS 337110). OSHA activity number 312882277.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- QUEEN ANNE WOODWORKING, LLC
- Site address
- 74 GREAT HILL ROAD
- City
- NAUGATUCK
- State
- CT
- ZIP
- 06770
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 337110
- SIC code (legacy)
- 2434
- Employees
- 14
- Ownership type
- A
Citations
34 citations on file for this inspection.
5(a)(1)
- Issued
- Aug 12, 2009
- Abate by
- Aug 30, 2011
- Penalty
- Initial $1,500 · Current $1,500
W103
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that: WORKSITE: The following deficiencies were found with dust collection systems. 1. The employer did not inspect on a routine basis the dust collection system and it was not maintained in a safe working condition. 2. The ductwork was not grounded and bonded to the dust collector or the production equipment. 3. The seal on the blower housing was leaking causing fine wood dust to become suspended in the air. 4. There was no deflagration venting on the dust collection room. 5. Flexible ducting was used in lengths that routinely exceeded the minimum required for machine operations. 6. The dust collection units were not equipped with an isolation device that would separate the unit from the work area. 7. The collection manifold was made of combustible material. Abatement note: Among other methods one feasible and acceptable method to correct these hazards is to comply with the National Fire Protection Agency (NFPA) 664 Preventing of Fires and Explosion in Wood Processing and Woodworking Facilities (2007) including but not limited to: 1. Develop and inspection program to ensure the system is functioning properly and is not leaking. 2. Make sure the ductwork is grounded and bonded to the dust collectors and to the equipment. 3. Repair the seals on the blower, so it does not blow dust particles out of the system. 4. Install deflagration venting in the dust collection room. 5. Shorten the flexible ducting and balance the system. 6. Install a spark detection device or deflagration isolation device 7. Install a manifold that is made from non-combustible materials.
Recent events (4)
- — F $15000.00
- — P (S) $1500.00
- — Z $15000.00
1910.22 A01
- Issued
- Aug 12, 2009
- Abate by
- Aug 30, 2011
- Penalty
- Initial $1,500 · Current $1,500
W103
Recent events (2)
- — P (S) $1500.00
- — Z (S) $1500.00
1910.23 D01 II
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
- Penalty
- Initial $600 · Current $600
1910.23 D01 III
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
Recent events (2)
- — F $5000.00
- — Z $5000.00
1910.23 E01
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
1910.24 D
- Issued
- Aug 12, 2009
- Abate by
- Aug 30, 2011
- Penalty
- Initial $600 · Current $600
Recent events (2)
- — P (S) $600.00
- — Z (S) $600.00
1910.24 E
- Issued
- Aug 12, 2009
- Abate by
- Aug 30, 2011
- Penalty
- Initial $600 · Current $600
Recent events (2)
- — P (S) $600.00
- — Z (S) $600.00
1910.107 B05 I
- Issued
- Aug 12, 2009
- Abate by
- Aug 30, 2011
- Penalty
- Initial $600 · Current $600
Recent events (2)
- — P (S) $600.00
- — Z (S) $600.00
1910.107 B05 IV
- Issued
- Aug 12, 2009
- Abate by
- Aug 30, 2011
- Penalty
- Initial $600 · Current $600
Recent events (4)
- — F $5000.00
- — P (S) $600.00
- — Z $5000.00
1910.107 G02
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
1910.133 A02
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
- Penalty
- Initial $600 · Current $600
1910.133 B01
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
1910.134 C01
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
- Penalty
- Initial $600 · Current $600
Recent events (2)
- — F $5000.00
- — Z $5000.00
1910.134 K03
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
Recent events (2)
- — F
- — Z
1910.134 C02 I
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
- Penalty
- Initial $600 · Current $600
1910.134 H01
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
1910.134 E01
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
- Penalty
- Initial $600 · Current $600
Recent events (2)
- — F $5000.00
- — Z $5000.00
1910.134 F01
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
- Penalty
- Initial $600 · Current $600
Recent events (2)
- — F $5000.00
- — Z $5000.00
1910.134 G01 IA
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
1910.213 C01
- Issued
- Aug 12, 2009
- Abate by
- Aug 17, 2009
- Penalty
- Initial $750 · Current $750
1910.213 C02
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
1910.213 C03
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
1910.242 B
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
- Penalty
- Initial $600 · Current $600
1910.304 F04
- Issued
- Aug 12, 2009
- Abate by
- Sep 8, 2009
- Penalty
- Initial $600 · Current $600
1910.305 B02
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
- Penalty
- Initial $600 · Current $600
1910.305 G02 III
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
1910.307 C02 I
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
- Penalty
- Initial $1,500 · Current $1,500
W103
Recent events (2)
- — F $15000.00
- — Z $15000.00
1910.334 A02 II
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
- Penalty
- Initial $600 · Current $600
1910.1200 E01
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
- Penalty
- Initial $600 · Current $600
1910.1200 G01
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
1910.1200 H01
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
1904.32 B06
- Issued
- Aug 12, 2009
- Abate by
- Aug 17, 2009
- Penalty
- Initial $300 · Current $300
1910.132 D02
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
1910.132 F04
- Issued
- Aug 12, 2009
- Abate by
- Sep 29, 2009
More inspections at Queen Anne Woodworking, LLC
View Queen Anne Woodworking, LLC's full OSHA safety record →
More inspections in this industry (NAICS 337110)
More inspections in CT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 312882277.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.