OSHA Inspection: SEABOARD INTERNATIONAL INC.

Accident-driven inspection · Safety discipline

On , OSHA opened an accident-driven safety inspection of SEABOARD INTERNATIONAL INC. in 13815 SOUTH FREEWAY, HOUSTON, TX 77047 (NAICS 423830). OSHA activity number 312924400.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Seaboard International INC. for free Get an email when a new federal OSHA severe-injury report for Seaboard International INC. is published. One employer, no account, unsubscribe in one click.
Site address
13815 SOUTH FREEWAY
City
HOUSTON
State
TX
ZIP
77047
Mailing
13815 SOUTH FREEWAY, HOUSTON, TX 77047
Inspection type
Accident-driven (A)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
423830
SIC code (legacy)
5084
Employees
75
Ownership type
A

41 citations on file for this inspection.

5(a)(1)

Deleted Serious Gravity 10 4 instances 3 exposed
Issued
Mar 3, 2011
Abate by
Mar 29, 2011
Penalty
Initial $4,500
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer does not
furnish employment and a place of employment which are free from
recognized hazards that are
causing or likely to cause death or serious physical harm to employees in
that employees are
exposed to struck-by hazards:
a)The employer does not ensure that employees utilize a floor mounted jib
crane to hoist
loads that are within the rated load limits of the hoist. This occurred on
October 29,
2010, when jib crane JC11 (not marked with the manufacturer or serial #),
with a rated
load capacity of 500 lbs, was used with a Dayton hoist, model, HHXG12,
serial #
4GU71 with a rated capacity of 500 lbs, to hoist a frac adapter 909879RNT,
weighing
968 pounds. This lift overloaded the hoist, exposing employees to struck
by hazards.
b)The employer does not ensure that hoists are inspected frequently and
periodically. This
occurred on October 21, 2010, resulting in hoists being used with hook
safety latches
missing, and hoist pendant stations that were not legibly marked. These
conditions
exposed employees to struck-by hazards.
The following hoists had not been inspected frequently or periodically:
North East Bay, 2 Ton Pentex Jib Crane: SN# 767-1, JC-1. 2 Ton, Coffing
Hoist, SN#
JL709WH
East Bay, 3rd, 2 Ton Anchor Jib Crane: SN# A5885, JC-3. 2 Ton Harrington
Hoist,
SN# 00075544
East Bay 4th, 1 Ton Pentex Jib Crane: SN# N/A, JC-4. 1 Ton Yale Hoist, SN#
HM4858.
East Bay 5th, 1 Ton Abbell Howe Jib Crane: SN# 34198081, JC-5. 1 Ton
Coffing Hoist,
SN# JM3584WV
East Bay 6th, 1 Ton Anchor Jib Crane: SN# 205985, JC-6. 1 Ton Coffing
Hoist, SN#
JM0659SX.
East Bay 7th, 1 Ton Coffing Jib Crane: SN# N/A, JC-7. 1 Ton Coffing Hoist,
SN#
JM0611SX.
East Bay, Westside, 2 Ton Gorbel Jib Crane, SN# A80640, JC-2. 2 Ton
Harrington
Hoist, SN# 00134374.
West Bay 1st, 1 Ton Pentex Jib Crane: SN# 767-3, JC-10. 1 Ton Coffing
Hoist, JLA-
318WL
West bay, 2nd :, 2 Ton Anchor Jib Crane SN# n/a, JC9. 2 Ton Budgit Hoist,
SN#
325325
West Bay, 3rd Crane, 1 Ton Jib Crane, SN# N/A, JC8. 1 Ton Coffing Hoist,
SN#
JM3458YV
Outside East of Building, 500lbs Jib Crane, SN# N/A, JC11. 500lbs Dayton
Hoist, SN#
4GU71.
ABATEMENT NOTES: Among other methods, one feasible method of abatement to
reduce this hazard is to ensure loads do not exceed the rated load of
hoisting equipment
as outlined in the American Society of Mechanical Engineers, ASME
B30.16-1998
Section 16-3.2.1 which indicates that a hoist shall not be loaded in
excess of its rated
load except for test purposes as provided by paragraph 16-2.2.2 or for
planned
engineered lifts as provided in paragraph 16.3.2.2, and to inspect cranes
and hoists
frequently and periodically, as outlined in the American Society of
Mechanical
Engineers, ASME B30.16-1998 Section 16-2.1.b Inspection Procedures for
hoist in
regular service. 16-2.1.2 Frequent inspections shall be performed at
intervals defined in
16-2.1.1 (daily, weekly and monthly). Section 16-2.1.3 states that
periodic inspection
shall be performed at intervals defined in paragraph 16-2.1.1(b)(2) -
yearly for a crane
in normal service.
c)The employer does not ensure that floor mounted jib cranes used to hoist
loads are used
within the rated load capacity of the crane. This occurred on October 21,
2010,
when jib
crane JC11, with a rated load capacity of 500 lbs, was used with a Coffing
hoist, with
a rated capacity of 1,000 pounds to hoist a dual actuator, part number
903515, weighing
852 pounds. This lift overloaded the crane, exposing employees to struck
by hazards.
d)The employer does not ensure that cranes are inspected frequently and
periodically. This
occurred on October 21, 2010, resulting in cranes being used that were not
marked with
rated capacity. This condition exposed employees to struck-by hazards.
The following cranes had not been inspected frequently or periodically:
North East Bay, 2 Ton Pentex Jib Crane: SN# 767-1, JC-1. 2 Ton, Coffing
Hoist, SN#
JL709WH
East Bay, 3rd, 2 Ton Anchor Jib Crane: SN# A5885, JC-3. 2 Ton Harrington
Hoist,
SN# 00075544
East Bay 4th, 1 Ton Pentex Jib Crane: SN# N/A, JC-4. 1 Ton Yale Hoist, SN#
HM4858.
East Bay 5th, 1 Ton Abbell Howe Jib Crane: SN# 34198081, JC-5. 1 Ton
Coffing Hoist,
SN# JM3584WV
East Bay 6th, 1 Ton Anchor Jib Crane: SN# 205985, JC-6. 1 Ton Coffing
Hoist, SN#
JM0659SX.
East Bay 7th, 1 Ton Coffing Jib Crane: SN# N/A, JC-7. 1 Ton Coffing Hoist,
SN#
JM0611SX.
East Bay, Westside, 2 Ton Gorbel Jib Crane, SN# A80640, JC-2. 2 Ton
Harrington
Hoist, SN# 00134374.
West Bay 1st, 1 Ton Pentex Jib Crane: SN# 767-3, JC-10. 1 Ton Coffing
Hoist, JLA-
318WL
West bay, 2nd :, 2 Ton Anchor Jib Crane SN# n/a, JC9. 2 Ton Budgit Hoist,
SN#
325325
West Bay, 3rd Crane, 1 Ton Jib Crane, SN# N/A, JC8. 1 Ton Coffing Hoist,
SN#
JM3458YV Outside East of Building, 500lbs Jib Crane, SN# N/A, JC11. 500lbs
Dayton
Hoist, SN#
4GU71.
ABATEMENT NOTES: Among other methods, one feasible method of abatement to
reduce this hazard is to ensure loads do not exceed the rated load of
cranes as outlined
in the American Society of Mechanical Engineers, ANSI/ASME B30.11
Monorails and
Underhungs cranes, 11.1.1 which indicates that a hoist shall not be loaded
in excess of
its rated load except for test purposes, and 11.1.2 which contains
inspection requirements
for cranes in regular use.
Disclaimers: You are not limited to the abatement methods suggested above;
2. The methods
explained are general requirements and may not be effective in all cases;
3. The employer is
responsible for selecting and carrying out an appropriate and effective
method of abatement.
Pursuant to 29 CFR 1903.19, within (10) Calendar days of the abatement
date of this
citation, the employer must submit documentation describing the actions
taken to ensure
that crane and hoist capacities are not exceeded, and that crane and hoist
inspections are
conducted frequently and periodically.
Recent events (2)
  • · I (S)
  • · Z (S) $4500.00

5(a)(1)

Serious Gravity 10 1 instance 4 exposed
Issued
Mar 3, 2011
Abate by
Mar 15, 2011
Penalty
Initial $4,500 · Current $4,500
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer does not
furnish employment and a place of employment which are free from
recognized hazards that
are causing or likely to cause death or physical harm to employees in that
employees are
exposed to struck by hazards:
a)This occurred on or about September 8, 2010, at the Seaboard Wellhead,
Inc. facility
at 13815 South Freeway, Houston Texas, when the employer did not ensure
employees unloading a 20 foot long freight container were provided with
and utilized
proper instructions and equipment to pull palletized equipment from the
container.
Three employees were exposed to being struck by material handling
equipment that
was overloaded when the pallet puller was used to move double stacked and
banded
crates to the rear of the container for removal by a forklift.
ABATEMENT NOTES: Among other methods, recognized and feasible means of
abatement to correct the hazard include but are not limited to:
1) Ensure that all slings, pallet pullers, chains  and other devices used
in material
handling are inspected and used within the equipments' rated capacity, and
ensure that
the device with the least rated capacity limits the use of the equipment
collectively to
that lowest rated capacity when used as one unit. Develop and implement
inspection
procedures to ensure devices including but not limited to slings, chains
and pallet
pullers are in safe operating condition.
2) Develop and implement a written operating procedure to ensure employees
involved in material handling understand assigned roles, safe positioning,
and hazards
associated with the process of unloading containers, including the
struck-by hazards
resulting from the snapback or recoil of slings, chains and equipment
under load.
3) Develop and implement safer, alternative methods of removal of
palletized cargo
from containers when such methods are feasible, develop operating
procedures for
these alternative methods, and ensure equipment, including loading ramps
and dock
plates, are provided.
Disclaimers: You are not limited to the abatement methods suggested above;
2. The
methods explained are general requirements and may not be effective in all
cases; 3.
The employer is responsible for selecting and carrying out an appropriate
and
effective method of abatement.
Pursuant to 29 CFR 1903.19, within (10) Calendar days of the abatement
date of this
citation, the employer must submit documentation demonstrating the steps
being taken
to ensure that equipment capacities are not exceeded, inspections of
equipment are
conducted, procedures are in place that keep employees out of snapback or
recoil
areas during unloading, and alternative methods, such as loading ramps and
dock
plates are available for use and used when feasible.
Recent events (2)
  • · I (S) $4500.00
  • · Z (S) $4500.00

1910.22 A01

Serious Gravity 01 2 instances 9 exposed
Issued
Mar 3, 2011
Abate by
Mar 15, 2011
Penalty
Initial $1,350 · Current $1,350
Recent events (2)
  • · I (S) $1350.00
  • · Z (S) $1350.00

1910.37 B02

Other-than-serious Gravity 01 1 instance 24 exposed
Issued
Mar 3, 2011
Abate by
Mar 11, 2011
Penalty
Initial $1,350
Recent events (2)
  • · I (O)
  • · Z (S) $1350.00

1910.37 B05

Other-than-serious Gravity 01 1 instance 22 exposed
Issued
Mar 3, 2011
Abate by
Mar 15, 2011
Recent events (2)
  • · I (O)
  • · Z (S)

1910.106 E02 IVA

Serious Gravity 05 1 instance 6 exposed
Issued
Mar 3, 2011
Abate by
Mar 9, 2011
Penalty
Initial $2,250 · Current $2,250
Recent events (2)
  • · I (S) $2250.00
  • · Z (S) $2250.00

1910.132 D01

Serious Gravity 05 3 instances 21 exposed
Issued
Mar 3, 2011
Abate by
Jul 29, 2011
Penalty
Initial $2,250 · Current $2,250
Recent events (2)
  • · I (S) $2250.00
  • · Z (S) $2250.00

1910.135 A01

Serious Gravity 05 3 instances 9 exposed
Issued
Mar 3, 2011
Abate by
Jul 29, 2011
Recent events (2)
  • · I (S)
  • · Z (S)

1910.134 E01

Serious Gravity 05 1 instance 4 exposed
Issued
Mar 3, 2011
Abate by
Mar 22, 2011
Penalty
Initial $1,800 · Current $1,800
Recent events (2)
  • · I (S) $1800.00
  • · Z (S) $1800.00

1910.134 F02

Serious Gravity 05 1 instance 4 exposed
Issued
Mar 3, 2011
Abate by
Mar 22, 2011
Recent events (2)
  • · I (S)
  • · Z (S)

1910.147 C01

Serious Gravity 10 1 instance 3 exposed
Issued
Mar 3, 2011
Abate by
Jul 29, 2011
Penalty
Initial $4,500 · Current $4,500
Recent events (2)
  • · I (S) $4500.00
  • · Z (S) $4500.00

1910.151 B

Deleted Serious Gravity 05 1 instance 3 exposed
Issued
Mar 3, 2011
Abate by
Apr 5, 2011
Penalty
Initial $2,250
Recent events (2)
  • · I (S)
  • · Z (S) $2250.00

1910.157 G02

Other-than-serious Gravity 05 1 instance 22 exposed
Issued
Mar 3, 2011
Abate by
Mar 29, 2011
Penalty
Initial $1,800 · Current $1,800
Recent events (2)
  • · I (O) $1800.00
  • · Z (S) $1800.00

1910.176 B

Serious Gravity 10 3 instances 13 exposed
Issued
Mar 3, 2011
Abate by
Jul 29, 2011
Penalty
Initial $4,500 · Current $4,500
Recent events (2)
  • · I (S) $4500.00
  • · Z (S) $4500.00

1910.178 A04

Serious Gravity 10 1 instance 5 exposed
Issued
Mar 3, 2011
Abate by
Jun 10, 2011
Penalty
Initial $6,300 · Current $4,410 Reduced
Recent events (2)
  • · I (S) $4410.00
  • · Z (S) $6300.00

1910.178 L01 I

Serious Gravity 10 1 instance 4 exposed
Issued
Mar 3, 2011
Abate by
Mar 8, 2011
Penalty
Initial $4,500 · Current $4,500
Recent events (2)
  • · I (S) $4500.00
  • · Z (S) $4500.00

1910.178 M10

Deleted Serious Gravity 10 2 instances 4 exposed
Issued
Mar 3, 2011
Abate by
Mar 9, 2011
Penalty
Initial $4,500
Recent events (2)
  • · I (S)
  • · Z (S) $4500.00

1910.178 Q07

Deleted Serious Gravity 10 1 instance 3 exposed
Issued
Mar 3, 2011
Abate by
Mar 15, 2011
Penalty
Initial $4,500
Recent events (2)
  • · I (S)
  • · Z (S) $4500.00

1910.179 J02

Deleted Serious Gravity 05 1 instance 3 exposed
Issued
Mar 3, 2011
Abate by
Mar 8, 2011
Penalty
Initial $2,250
Recent events (2)
  • · I (S)
  • · Z (S) $2250.00

1910.179 J03

Deleted Serious Gravity 05 2 instances 3 exposed
Issued
Mar 3, 2011
Abate by
Mar 8, 2011
Recent events (2)
  • · I (S)
  • · Z (S)

1910.184 E01

Deleted Serious Gravity 05 1 instance 7 exposed
Issued
Mar 3, 2011
Abate by
Mar 22, 2011
Penalty
Initial $2,250
Recent events (2)
  • · I (S)
  • · Z (S) $2250.00

1910.184 E03 I

Deleted Serious Gravity 05 1 instance 7 exposed
Issued
Mar 3, 2011
Abate by
Mar 29, 2011
Penalty
Initial $2,250
Recent events (2)
  • · I (S)
  • · Z (S) $2250.00

1910.212 A01

Serious Gravity 10 7 instances 5 exposed
Issued
Mar 3, 2011
Abate by
Apr 29, 2011
Penalty
Initial $4,500 · Current $4,500
Recent events (2)
  • · I (S) $4500.00
  • · Z (S) $4500.00

1910.212 B

Serious Gravity 01 3 instances 5 exposed
Issued
Mar 3, 2011
Abate by
Mar 29, 2011
Penalty
Initial $1,350 · Current $1,350
Recent events (2)
  • · I (S) $1350.00
  • · Z (S) $1350.00

1910.215 A04

Serious Gravity 10 1 instance 5 exposed
Issued
Mar 3, 2011
Abate by
Apr 29, 2011
Penalty
Initial $4,500 · Current $3,150 Reduced
Recent events (2)
  • · I (S) $3150.00
  • · Z (S) $4500.00

1910.215 B09

Serious Gravity 10 2 instances 5 exposed
Issued
Mar 3, 2011
Abate by
Apr 29, 2011
Recent events (2)
  • · I (S)
  • · Z (S)

1910.219 C03

Serious Gravity 10 2 instances 4 exposed
Issued
Mar 3, 2011
Abate by
Mar 22, 2011
Penalty
Initial $4,500 · Current $4,500
Recent events (2)
  • · I (S) $4500.00
  • · Z (S) $4500.00

1910.253 B02 II

Serious Gravity 05 1 instance 1 exposed
Issued
Mar 3, 2011
Abate by
Mar 29, 2011
Penalty
Initial $1,800 · Current $1,800
Recent events (2)
  • · I (S) $1800.00
  • · Z (S) $1800.00

1910.253 B04 III

Serious Gravity 05 1 instance 2 exposed
Issued
Mar 3, 2011
Abate by
Mar 29, 2011
Recent events (2)
  • · I (S)
  • · Z (S)

1910.1200 E01

Serious Gravity 05 1 instance 23 exposed
Issued
Mar 3, 2011
Abate by
Apr 29, 2011
Penalty
Initial $3,150 · Current $3,150
Recent events (2)
  • · I (S) $3150.00
  • · Z (S) $3150.00

5(a)(1)

Serious Gravity 10 4 instances 3 exposed
Issued
Mar 3, 2011
Abate by
Apr 29, 2011
Penalty
Initial $4,500 · Current $4,500
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer does not
furnish employment and a place of employment which are free from
recognized hazards that are
causing or likely to cause death or serious physical harm to employees in
that employees are
exposed to struck-by hazards:
a)The employer does not ensure that employees utilize a floor mounted jib
crane to hoist
loads that are within the rated load limits of the hoist. This occurred on
October 29,
2010, when jib crane JC11 (not marked with the manufacturer or serial #),
with a rated
load capacity of 500 lbs, was used with a Dayton hoist, model, HHXG12,
serial #
4GU71 with a rated capacity of 500 lbs, to hoist a frac adapter 909879RNT,
weighing
968 pounds. This lift overloaded the hoist, exposing employees to struck
by hazards.
b)The employer does not ensure that hoists are inspected frequently and
periodically. This
occurred on October 21, 2010, resulting in hoists being used with hook
safety latches
missing, and hoist pendant stations that were not legibly marked. These
conditions
exposed employees to struck-by hazards.
The following hoists had not been inspected frequently or periodically:
North East Bay, 2 Ton Pentex Jib Crane: SN# 767-1, JC-1. 2 Ton, Coffing
Hoist, SN#
JL709WH
East Bay, 3rd, 2 Ton Anchor Jib Crane: SN# A5885, JC-3. 2 Ton Harrington
Hoist,
SN# 00075544
East Bay 4th, 1 Ton Pentex Jib Crane: SN# N/A, JC-4. 1 Ton Yale Hoist, SN#
HM4858.
East Bay 5th, 1 Ton Abbell Howe Jib Crane: SN# 34198081, JC-5. 1 Ton
Coffing Hoist,
SN# JM3584WV
East Bay 6th, 1 Ton Anchor Jib Crane: SN# 205985, JC-6. 1 Ton Coffing
Hoist, SN#
JM0659SX.
East Bay 7th, 1 Ton Coffing Jib Crane: SN# N/A, JC-7. 1 Ton Coffing Hoist,
SN#
JM0611SX.
East Bay, Westside, 2 Ton Gorbel Jib Crane, SN# A80640, JC-2. 2 Ton
Harrington
Hoist, SN# 00134374.
West Bay 1st, 1 Ton Pentex Jib Crane: SN# 767-3, JC-10. 1 Ton Coffing
Hoist, JLA-
318WL
West bay, 2nd :, 2 Ton Anchor Jib Crane SN# n/a, JC9. 2 Ton Budgit Hoist,
SN#
325325
West Bay, 3rd Crane, 1 Ton Jib Crane, SN# N/A, JC8. 1 Ton Coffing Hoist,
SN#
JM3458YV
Outside East of Building, 500lbs Jib Crane, SN# N/A, JC11. 500lbs Dayton
Hoist, SN#
4GU71.
ABATEMENT NOTES: Among other methods, one feasible method of abatement to
reduce this hazard is to ensure loads do not exceed the rated load of
hoisting equipment
as outlined in the American Society of Mechanical Engineers, ASME
B30.16-1998
Section 16-3.2.1 which indicates that a hoist shall not be loaded in
excess of its rated
load except for test purposes as provided by paragraph 16-2.2.2 or for
planned
engineered lifts as provided in paragraph 16.3.2.2, and to inspect cranes
and hoists
frequently and periodically, as outlined in the American Society of
Mechanical
Engineers, ASME B30.16-1998 Section 16-2.1.b Inspection Procedures for
hoist in
regular service. 16-2.1.2 Frequent inspections shall be performed at
intervals defined in
16-2.1.1 (daily, weekly and monthly). Section 16-2.1.3 states that
periodic inspection
shall be performed at intervals defined in paragraph 16-2.1.1(b)(2) -
yearly for a crane
in normal service.
c)The employer does not ensure that floor mounted jib cranes used to hoist
loads are used
within the rated load capacity of the crane. This occurred on October 21,
2010, when jib
crane JC11, with a rated load capacity of 500 lbs, was used with a Coffing
hoist, with
a rated capacity of 1,000 pounds to hoist a dual actuator, part number
903515, weighing
852 pounds. This lift overloaded the crane, exposing employees to struck
by hazards.
d)The employer does not ensure that cranes are inspected frequently and
periodically. This
occurred on October 21, 2010, resulting in cranes being used that were not
marked with
rated capacity. This condition exposed employees to struck-by hazards.
The following cranes had not been inspected frequently or periodically:
North East Bay, 2 Ton Pentex Jib Crane: SN# 767-1, JC-1. 2 Ton, Coffing
Hoist, SN#
JL709WH
East Bay, 3rd, 2 Ton Anchor Jib Crane: SN# A5885, JC-3. 2 Ton Harrington
Hoist,
SN# 00075544
East Bay 4th, 1 Ton Pentex Jib Crane: SN# N/A, JC-4. 1 Ton Yale Hoist, SN#
HM4858.
East Bay 5th, 1 Ton Abbell Howe Jib Crane: SN# 34198081, JC-5. 1 Ton
Coffing Hoist,
SN# JM3584WV
East Bay 6th, 1 Ton Anchor Jib Crane: SN# 205985, JC-6. 1 Ton Coffing
Hoist, SN#
JM0659SX.
East Bay 7th, 1 Ton Coffing Jib Crane: SN# N/A, JC-7. 1 Ton Coffing Hoist,
SN#
JM0611SX.
East Bay, Westside, 2 Ton Gorbel Jib Crane, SN# A80640, JC-2. 2 Ton
Harrington
Hoist, SN# 00134374.
West Bay 1st, 1 Ton Pentex Jib Crane: SN# 767-3, JC-10. 1 Ton Coffing
Hoist, JLA-
318WL
West bay, 2nd :, 2 Ton Anchor Jib Crane SN# n/a, JC9. 2 Ton Budgit Hoist,
SN#
325325
West Bay, 3rd Crane, 1 Ton Jib Crane, SN# N/A, JC8. 1 Ton Coffing Hoist,
SN#
JM3458YV Outside East of Building, 500lbs Jib Crane, SN# N/A, JC11. 500lbs
Dayton Hoist, SN#
4GU71.
ABATEMENT NOTES: Among other methods, one feasible method of abatement to
reduce this hazard is to ensure loads do not exceed the rated load of
cranes as outlined
in the American Society of Mechanical Engineers, ANSI/ASME B30.11
Monorails and
Underhungs cranes, 11.1.1 which indicates that a hoist shall not be loaded
in excess of
its rated load except for test purposes, and 11.1.2 which contains
inspection requirements
for cranes in regular use.
Disclaimers: You are not limited to the abatement methods suggested above;
2. The methods
explained are general requirements and may not be effective in all cases;
3. The employer is
responsible for selecting and carrying out an appropriate and effective
method of abatement.
Pursuant to 29 CFR 1903.19, within (10) Calendar days of the abatement
date of this
citation, the employer must submit documentation describing the actions
taken to ensure
that crane and hoist capacities are not exceeded, and that crane and hoist
inspections are
conducted frequently and periodically.
Recent events (2)
  • · I (S) $4500.00
  • · Z (S) $4500.00

1910.179 J02

Serious Gravity 05 1 instance 3 exposed
Issued
Mar 3, 2011
Abate by
Mar 8, 2011
Penalty
Initial $2,250
Recent events (2)
  • · I (S)
  • · Z (S) $2250.00

1910.179 J03

Serious Gravity 05 2 instances 3 exposed
Issued
Mar 3, 2011
Abate by
Mar 8, 2011
Recent events (2)
  • · I (S)
  • · Z (S)

1910.178 M10

Serious Gravity 10 2 instances 4 exposed
Issued
Mar 3, 2011
Abate by
Mar 9, 2011
Penalty
Initial $4,500 · Current $4,500
Recent events (2)
  • · I (S) $4500.00
  • · Z (S) $4500.00

1910.178 Q07

Serious Gravity 10 1 instance 3 exposed
Issued
Mar 3, 2011
Abate by
Mar 15, 2011
Penalty
Initial $4,500
Recent events (2)
  • · I (S)
  • · Z (S) $4500.00

1910.184 E01

Serious Gravity 05 1 instance 7 exposed
Issued
Mar 3, 2011
Abate by
Mar 22, 2011
Penalty
Initial $2,250 · Current $2,250
Recent events (2)
  • · I (S) $2250.00
  • · Z (S) $2250.00

1910.184 E03 I

Serious Gravity 05 1 instance 7 exposed
Issued
Mar 3, 2011
Abate by
Mar 29, 2011
Penalty
Initial $2,250
Recent events (2)
  • · I (S)
  • · Z (S) $2250.00

1904.32 B02

Deleted Other-than-serious Gravity 00 1 instance 2 exposed
Issued
Mar 3, 2011
Abate by
Mar 15, 2011
Penalty
Initial $1,000
Recent events (2)
  • · I (O)
  • · Z (O) $1000.00

1904.32 B03

Deleted Other-than-serious Gravity 00 1 instance 2 exposed
Issued
Mar 3, 2011
Abate by
Mar 15, 2011
Penalty
Initial $1,000
Recent events (2)
  • · I (O)
  • · Z (O) $1000.00

1904.32 B02

Other-than-serious Gravity 00 1 instance 2 exposed
Issued
Mar 3, 2011
Abate by
Mar 29, 2011
Penalty
Initial $1,000 · Current $1,000
Recent events (2)
  • · I (O) $1000.00
  • · Z (O) $1000.00

1904.32 B03

Other-than-serious Gravity 00 1 instance 2 exposed
Issued
Mar 3, 2011
Abate by
Mar 29, 2011
Penalty
Initial $1,000
Recent events (2)
  • · I (O)
  • · Z (O) $1000.00

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 312924400.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.