LEAGUE CITY, TX —
OSHA Inspection: TX-MORROW CONSTRUCTION, INC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of TX-MORROW CONSTRUCTION, INC in 1800 S. EGRET BAY BLVD, LEAGUE CITY, TX 77354 (NAICS 236116). OSHA activity number 312925563.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- TX-MORROW CONSTRUCTION, INC
- Site address
- 1800 S. EGRET BAY BLVD
- City
- LEAGUE CITY
- State
- TX
- ZIP
- 77354
- Mailing
- 4635 SOUTHWEST FWY STE 420, HOUSTON, TX 77027
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236116
- SIC code (legacy)
- 1522
- Employees
- 50
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
9 citations on file for this inspection.
1910.22 A03
- Issued
- Apr 11, 2011
- Abate by
- Apr 28, 2011
- Penalty
- Initial $3,150
Recent events (2)
- — I (S)
- — Z (S) $3150.00
1926.25 A
- Issued
- Apr 11, 2011
- Abate by
- Apr 28, 2011
- Penalty
- Initial $3,150
Recent events (2)
- — I (S)
- — Z (S) $3150.00
1926.501 B04 I
- Issued
- Apr 11, 2011
- Abate by
- Apr 28, 2011
- Penalty
- Initial $4,410 · Current $4,410
Recent events (2)
- — I (S) $4410.00
- — Z (S) $4410.00
1926.501 B14
- Issued
- Apr 11, 2011
- Abate by
- Apr 28, 2011
- Penalty
- Initial $4,410 · Current $4,410
Recent events (2)
- — I (S) $4410.00
- — Z (S) $4410.00
1926.502 B02
- Issued
- Apr 11, 2011
- Abate by
- Apr 28, 2011
Recent events (2)
- — I (S)
- — Z (S)
1926.1052 C01 I
- Issued
- Apr 11, 2011
- Abate by
- Apr 28, 2011
- Penalty
- Initial $4,410 · Current $2,642 Reduced
Recent events (2)
- — I (S) $2642.00
- — Z (S) $4410.00
1926.25 C
- Issued
- Apr 11, 2011
- Abate by
- Apr 28, 2011
- Penalty
- Initial $630 · Current $630
Recent events (2)
- — I (O) $630.00
- — Z (O) $630.00
1910.22 A03
- Issued
- Apr 11, 2011
- Abate by
- Apr 28, 2011
Recent events (3)
- — Q $3150.00
- — I (O)
- — Z (S) $3150.00
1926.25 A
- Issued
- Apr 11, 2011
- Abate by
- Apr 28, 2011
Recent events (3)
- — Q $3150.00
- — I (O)
- — Z (S) $3150.00
More inspections at Tx-Morrow Construction, INC
View Tx-Morrow Construction, INC's full OSHA safety record →
More inspections in this industry (NAICS 236116)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 312925563.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.