Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PRIDE MACHINE & TOOL CO., INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PRIDE MACHINE & TOOL CO., INC. in 1821 NORTH 30TH STREET, MELROSE PARK, IL 60160 (NAICS 332710). OSHA activity number 312930704.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Pride Machine & Tool CO., INC. — free Get an email when a new federal OSHA severe-injury report for Pride Machine & Tool CO., INC. is published. One employer, no account, unsubscribe in one click.
Site address
1821 NORTH 30TH STREET
City
MELROSE PARK
State
IL
ZIP
60160
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332710
SIC code (legacy)
3599
Employees
12
Ownership type
A
Industry flags
Manufacturing safety.

21 citations on file for this inspection.

1910.23 A09

Serious Gravity 02 1 instance 3 exposed
Issued
Apr 27, 2009
Abate by
Jun 30, 2009
Penalty
Initial $600 · Current $250 Reduced
Recent events (2)
  • — I (S) $250.00
  • — Z (S) $600.00

1910.147 C01

Serious Gravity 10 1 instance 3 exposed
Issued
Apr 27, 2009
Abate by
Jun 30, 2009
Penalty
Initial $1,500 · Current $640 Reduced
Recent events (2)
  • — I (S) $640.00
  • — Z (S) $1500.00

1910.147 C05 I

Serious Gravity 10 1 instance 3 exposed
Issued
Apr 27, 2009
Abate by
Jun 12, 2009
Recent events (2)
  • — I (S)
  • — Z (S)

1910.178 L04 III

Serious Gravity 03 1 instance 5 exposed
Issued
Apr 27, 2009
Abate by
Jun 12, 2009
Penalty
Initial $750 · Current $310 Reduced
Recent events (2)
  • — I (S) $310.00
  • — Z (S) $750.00

1910.178 L06

Serious Gravity 02 1 instance 2 exposed
Issued
Apr 27, 2009
Abate by
Jun 12, 2009
Recent events (2)
  • — I (S)
  • — Z (S)

1910.179 J02

Serious Gravity 03 1 instance 5 exposed
Issued
Apr 27, 2009
Abate by
Jun 12, 2009
Penalty
Initial $750 · Current $315 Reduced
Recent events (2)
  • — I (S) $315.00
  • — Z (S) $750.00

1910.179 J03

Serious Gravity 03 1 instance 5 exposed
Issued
Apr 27, 2009
Abate by
Jun 12, 2009
Recent events (2)
  • — I (S)
  • — Z (S)

1910.184 D

Serious Gravity 10 1 instance 5 exposed
Issued
Apr 27, 2009
Abate by
Jun 30, 2009
Penalty
Initial $1,500 · Current $640 Reduced
Recent events (2)
  • — I (S) $640.00
  • — Z (S) $1500.00

1910.184 H05 III

Serious Gravity 10 1 instance 5 exposed
Issued
Apr 27, 2009
Abate by
Jun 30, 2009
Recent events (2)
  • — I (S)
  • — Z (S)

1910.212 A01

Serious Gravity 05 1 instance 3 exposed
Issued
Apr 27, 2009
Abate by
May 14, 2009
Penalty
Initial $1,050 · Current $440 Reduced
Recent events (2)
  • — I (S) $440.00
  • — Z (S) $1050.00

1910.212 B

Serious Gravity 02 1 instance 5 exposed
Issued
Apr 27, 2009
Abate by
Jun 30, 2009
Penalty
Initial $600 · Current $250 Reduced
Recent events (2)
  • — I (S) $250.00
  • — Z (S) $600.00

1910.213 B03

Serious Gravity 03 1 instance 1 exposed
Issued
Apr 27, 2009
Abate by
Apr 30, 2009
Penalty
Initial $750 · Current $315 Reduced
Recent events (2)
  • — I (S) $315.00
  • — Z (S) $750.00

1910.213 I01

Serious Gravity 10 1 instance 5 exposed
Issued
Apr 27, 2009
Abate by
Apr 30, 2009
Penalty
Initial $1,500 · Current $640 Reduced
Recent events (2)
  • — I (S) $640.00
  • — Z (S) $1500.00

1910.215 A02

Serious Gravity 02 1 instance 5 exposed
Issued
Apr 27, 2009
Abate by
Jun 30, 2009
Penalty
Initial $600 · Current $250 Reduced
Recent events (2)
  • — I (S) $250.00
  • — Z (S) $600.00

1910.215 A04

Serious Gravity 02 1 instance 5 exposed
Issued
Apr 27, 2009
Abate by
Jun 30, 2009
Recent events (2)
  • — I (S)
  • — Z (S)

1910.215 B09

Serious Gravity 02 1 instance 5 exposed
Issued
Apr 27, 2009
Abate by
Jun 30, 2009
Recent events (2)
  • — I (S)
  • — Z (S)

1910.219 D01

Serious Gravity 02 2 instances 3 exposed
Issued
Apr 27, 2009
Abate by
Jun 30, 2009
Penalty
Initial $600 · Current $250 Reduced
Recent events (2)
  • — I (S) $250.00
  • — Z (S) $600.00

1910.219 E01 I

Serious Gravity 02 1 instance 1 exposed
Issued
Apr 27, 2009
Abate by
Jun 30, 2009
Recent events (2)
  • — I (S)
  • — Z (S)

1910.219 E03 I

Serious Gravity 02 1 instance 3 exposed
Issued
Apr 27, 2009
Abate by
Apr 30, 2009
Recent events (2)
  • — I (S)
  • — Z (S)

1910.242 B

Serious Gravity 02 1 instance 6 exposed
Issued
Apr 27, 2009
Abate by
Jun 30, 2009
Penalty
Initial $600 · Current $250 Reduced
Recent events (2)
  • — I (S) $250.00
  • — Z (S) $600.00

1910.303 B02

Serious Gravity 02 1 instance 2 exposed
Issued
Apr 27, 2009
Abate by
Jun 30, 2009
Penalty
Initial $600 · Current $250 Reduced
Recent events (2)
  • — I (S) $250.00
  • — Z (S) $600.00

View Pride Machine & Tool CO., INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 312930704.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.