EASTON, PA —
OSHA Inspection: POPPLE CONSTRUCTION
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of POPPLE CONSTRUCTION in 190 S DELAWARE DR, EASTON, PA 18042 (NAICS 238910). OSHA activity number 312973969.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- POPPLE CONSTRUCTION
- Site address
- 190 S DELAWARE DR
- City
- EASTON
- State
- PA
- ZIP
- 18042
- Mailing
- 202 MAIN ST., LAFLIN, PA 18072
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238910
- SIC code (legacy)
- 1629
- Employees
- 4
- Ownership type
- A
Citations
3 citations on file for this inspection.
5(a)(1)
- Issued
- Jul 17, 2009
- Abate by
- Jul 30, 2009
- Penalty
- Initial $3,000 · Current $3,000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employmnent and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: a) Construction site - Employees lifted a Fairbanks Titan series truck scale by guide rails welded to the deck; the welds of the rails failed, resulting in an employee's right hand being crushed when the scale dropped, on or about June 15, 2009. Among other methods, feasible forms of abatement would include following manufacturer recommendations and company programs: 1. "Always attach chains to the scale weighbridge." 2. "exercise extreme care when lifting a module assembly", "ensure that the lifting chains are equally loaded, secure, and that an angle of greater than 30 degrees is maintained. 3. Lift a single 35 foot module 4. Consult manufacturer data to determine the weight of the scale prior to lifting. 5. Adhere to company safety program guidance against working under suspended loads Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
1926.21 B02
- Issued
- Jul 17, 2009
- Abate by
- Jul 17, 2009
- Penalty
- Initial $3,000 · Current $3,000
1926.251 A01
- Issued
- Jul 17, 2009
- Abate by
- Jul 30, 2009
More inspections at Popple Construction
View Popple Construction's full OSHA safety record →
More inspections in this industry (NAICS 238910)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 312973969.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.