LADY LAKE, FL ·
OSHA Inspection: SOUTH EASTERN TIMBER CORP., INC.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of SOUTH EASTERN TIMBER CORP., INC. in 2939 EAST HARTSOCK SAWMILL ROAD, LADY LAKE, FL 32159 (NAICS 321113). OSHA activity number 313033946.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SOUTH EASTERN TIMBER CORP., INC.
- Site address
- 2939 EAST HARTSOCK SAWMILL ROAD
- City
- LADY LAKE
- State
- FL
- ZIP
- 32159
- Mailing
- P.O. BOX 9289, CORAL SPRINGS, FL 33075
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (N)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 321113
- SIC code (legacy)
- 2421
- Employees
- 3
- Ownership type
- Private (A)
Citations
53 citations on file for this inspection.
5(a)(1)
- Issued
- Jul 2, 2009
- Abate by
- Jul 20, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by fragments of Polyvinyl Chloride (PVC) plastic pipe in the event that the PVC plastic pipe ruptured: a.)Main Mill - PVC plastic piping was used in exposed above ground locations to transport compressed air at 120 psi, on or about January 29, 2009. Among other methods, two feasible and acceptable abatement methods to correct this hazard are; #1) Replace all existing PVC pipes and fittings with cast iron materials, or another type of metal piping, which are rated to transport compressed air safely in exposed above ground locations. #2) Replace all existing PVC piping and fittings with shatter resistant Acrylonitrile-Butadiene-Styrene (ABS) pipe and fittings, which are manufactured for above ground use of compressed air.
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
5(a)(1)
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to saw blade nip points: a.)Main Mill - The sliding cut-off saw hydraulic controls were leaking, allowing it to inch forward while it was operating, on or about January 29, 2009. Among other methods, one acceptable and feasible way to correct this hazard would be to replace the seals in the hydraulic line.
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.22 A01
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.106 B02 IIA
- Issued
- Jul 2, 2009
- Abate by
- Jul 20, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.106 B02 VIIA
- Issued
- Jul 2, 2009
- Abate by
- Jul 20, 2009
Recent events (2)
- · F (S)
- · Z (S)
1910.106 B06
- Issued
- Jul 2, 2009
- Abate by
- Jul 10, 2009
Recent events (2)
- · F (S)
- · Z (S)
1910.106 E02 IVA
- Issued
- Jul 2, 2009
- Abate by
- Jul 9, 2009
- Penalty
- Initial $450 · Current $270 Reduced
Recent events (2)
- · F (S) $270.00
- · Z (S) $450.00
1910.132 D01
- Issued
- Jul 2, 2009
- Abate by
- Jul 20, 2009
- Penalty
- Initial $750 · Current $450 Reduced
Recent events (2)
- · F (S) $450.00
- · Z (S) $750.00
1910.136 A
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
Recent events (2)
- · F (S)
- · Z (S)
1910.147 C04 I
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (4)
- · I $2500.00
- · Z $5000.00
- · F (S) $900.00
1910.147 C07 I
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.147 D04 I
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.212 A01
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (4)
- · I $2500.00
- · Z $5000.00
- · F (S) $900.00
1910.212 A03 II
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (4)
- · I $5000.00
- · Z $10000.00
- · F (S) $900.00
1910.212 B
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $600 · Current $360 Reduced
Recent events (2)
- · F (S) $360.00
- · Z (S) $600.00
1910.213 B03
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.213 G01
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.213 G02
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.213 G03
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.215 A01
- Issued
- Jul 2, 2009
- Abate by
- Jul 20, 2009
- Penalty
- Initial $750 · Current $450 Reduced
Recent events (2)
- · F (S) $450.00
- · Z (S) $750.00
1910.215 B09
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.219 C02 I
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.219 C04 I
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.219 D01
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.219 E01 I
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
Recent events (2)
- · F (S)
- · Z (S)
1910.219 E03 I
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
Recent events (2)
- · F (S)
- · Z (S)
1910.219 F03
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.242 B
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,050 · Current $630 Reduced
Recent events (2)
- · F (S) $630.00
- · Z (S) $1050.00
1910.243 A02 II
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.243 C01
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,050 · Current $630 Reduced
Recent events (2)
- · F (S) $630.00
- · Z (S) $1050.00
1910.253 B02 II
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $450 · Current $270 Reduced
Recent events (2)
- · F (S) $270.00
- · Z (S) $450.00
1910.253 B04 III
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $450 · Current $270 Reduced
Recent events (2)
- · F (S) $270.00
- · Z (S) $450.00
1910.254 C02 I
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.254 D09 III
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.265 C20 II
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $600 · Current $360 Reduced
Recent events (2)
- · F (S) $360.00
- · Z (S) $600.00
1910.265 C21 IIA
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.265 C30 II
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.265 E01 V
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.265 E01 VII
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $750 · Current $450 Reduced
Recent events (4)
- · I
- · Z $5000.00
- · F (S) $450.00
1910.303 B01 V
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $750 · Current $450 Reduced
Recent events (2)
- · F (S) $450.00
- · Z (S) $750.00
1910.303 B02
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $750 · Current $450 Reduced
Recent events (2)
- · F (S) $450.00
- · Z (S) $750.00
1910.303 B06
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $750 · Current $450 Reduced
Recent events (2)
- · F (S) $450.00
- · Z (S) $750.00
1910.303 B07
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $750 · Current $450 Reduced
Recent events (2)
- · F (S) $450.00
- · Z (S) $750.00
1910.303 C03 I
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.303 F02
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.303 G02 I
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.304 B02 I
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.304 F01 V
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $750 · Current $450 Reduced
Recent events (2)
- · F (S) $450.00
- · Z (S) $750.00
1910.305 A02 VC
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $750 · Current $450 Reduced
Recent events (2)
- · F (S) $450.00
- · Z (S) $750.00
1910.305 B01 I
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.305 B02 I
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $750 · Current $450 Reduced
Recent events (2)
- · F (S) $450.00
- · Z (S) $750.00
1910.305 E01
- Issued
- Jul 2, 2009
- Abate by
- Jul 29, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
1910.334 A02 II
- Issued
- Jul 2, 2009
- Abate by
- Jul 15, 2009
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1500.00
More inspections at South Eastern Timber Corp., INC.
View South Eastern Timber Corp., INC.'s full OSHA safety record →
More inspections in this industry (NAICS 321113)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 313033946.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.