FREDERIC, WI —
OSHA Inspection: FOUR SEASONS WOOD PRODUCTS
Referral inspection · Health discipline
At a glance
On , OSHA opened a referral health inspection of FOUR SEASONS WOOD PRODUCTS in 408 1ST AVENUE NORTH, FREDERIC, WI 54837 (NAICS 321918). OSHA activity number 313178295.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FOUR SEASONS WOOD PRODUCTS
- Site address
- 408 1ST AVENUE NORTH
- City
- FREDERIC
- State
- WI
- ZIP
- 54837
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- Yes
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 321918
- SIC code (legacy)
- 2431
- Employees
- 13
- Ownership type
- A
Citations
1 citation on file for this inspection.
5(a)(1)
- Issued
- Sep 2, 2010
- Abate by
- Aug 31, 2011
- Penalty
- Initial $375 · Current $375
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to serious burns from potential dust deflagration, explosion, or other fire hazards as the result of improper design and installation of the dust collection systems: (a)Building #1; The following deficiencies were found with the MAC dust collection system; (1)A deflagration isolation or suppression system was not provided for the inlet (dirty) air side of the air-material separator (bag house). (2)A spark detection system with a high-speed abort gate or extinguishment was not installed downstream of the last material entry point and upstream of the air-material separator where a large belt sander with an automatic feed system was used. (b)Building #2; The following deficiency was found with the Torit dust collection system; (1)A deflagration isolation or suppression system was not provided for the inlet (dirty) air side of the air-material separator (bag house). (c)Rip Saw Building; The following deficiency was found with the cyclone dust collection system; (1)A deflagration isolation or suppression system was not provided for the inlet (dirty) air side of the air-material separator (cyclone). AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE MEANS OF ABATEMENT WOULD BE TO COMPLY WITH THE APPLICABLE GUIDELINES OUTLINED IN NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 664 "STANDARD FOR THE PREVENTION OF FIRES AND EXPLOSIONS IN WOOD PROCESSING AND WOODWORKING FACILITIES (2007) EDITION", INCLUDING SECTIONS 8.2.4.1 and 8.2.2.2.2. Abatement certification and documentation are required for this item. Abatement note: In the event that air from the bag house dust collectors are recycled back into the facility, the element of isolation would be required between the outlet (clean) side of the air- material separator (bag house) and the buildings to prevent the potential flame front propagation resulting from an explosion event originating within the bag house from entering the facility. Abatement Schedule STEP 1-A combination of administrative controls shall be implemented as an interim protective measure until feasible engineering and administrative controls can be permanently implemented. STEP 2-A written, detailed plan of abatement shall be submitted to the Area Director outlining a schedule for the implementation of engineering and/or administrative measures to control employee exposure to the hazardous condition referenced in this citation. The plan shall include, at a minimum, target dates for the following actions which must be consistent with the abatement dates required by this citation: (1)Evaluation of engineering/administrative control options; (2)Selection of optimum control methods and completion of design; (3)Procurement, installation and operation of selected control measures; (4)Testing and acceptance or modification/redesign of controls; All proposed control measures shall be approved for each particular use by a competent certified safety professional, professional engineer, or other technically qualified person. STEP 3-Abatement shall have been completed by the implementation of feasible engineering and administrative controls upon verification of their effectiveness in achieving compliance. Date by Which Violation Must be Abated: Step 1- / / Date by Which Violation Must be Abated: Step 2- / / Date by Which Violation Must be Abated: step 3- / /
Recent events (2)
- — P (S) $375.00
- — Z (S) $375.00
More inspections at Four Seasons Wood Products
View Four Seasons Wood Products's full OSHA safety record →
More inspections in this industry (NAICS 321918)
More inspections in WI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 313178295.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.