SPRINGFIELD, MA —
OSHA Inspection: TRI STATE BUILDING SVCS. LLC DBA SUNSET BLD. SVCS.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of TRI STATE BUILDING SVCS. LLC DBA SUNSET BLD. SVCS. in 1350 MAIN STREET, SPRINGFIELD, MA 01103 (NAICS 561720). OSHA activity number 313200263.
Where did this inspection happen?
- Establishment
- TRI STATE BUILDING SVCS. LLC DBA SUNSET BLD. SVCS.
- Site address
- 1350 MAIN STREET
- City
- SPRINGFIELD
- State
- MA
- ZIP
- 01103
- Mailing
- 11 INDUSTRY STREET, POUGHKEEPSIE, NY 12603
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 561720
- SIC code (legacy)
- 7349
- Employees
- 5
- Ownership type
- A
Citations
2 citations on file for this inspection.
5(a)(1)
- Issued
- Jul 9, 2009
- Abate by
- Jul 10, 2009
- Penalty
- Initial $2,100 · Current $2,100
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees, in that, employees were exposed to fall hazards: Jobsite at Sovereign Bank Building, 1350 Main Street, Springfield, MA: On or about 6/11/09 employees were exposed to fall hazards while using rope descent systems to wash the exterior windows of the seventeen (17) story building. 1. Primary working lines and safety lines were tied to the same guardrail structure on the roof. The tie off points had unknown strength. 2. Two rack descent devices had excessive wear in the grooves of the break bars where ropes ran around them. One rack descent device had a hole in one of the break bars where the rope wore through it. Primary working lines, safety lines, seatboards, seatboard support webbing and tools were not thoroughly inspected before use on 6/11/09. AMONG OTHER METHODS THE FOLLOWING ARE FEASIBLE AND ACCEPTABLE MEANS OF ABATING THE HAZARD: 1. Develop and implement a written plan for the use of rope descent systems on the 1350 Main Street Sovereign Bank Building. Identify in the plan each anchorage that will be used as a tie off for both primary working lines and for safety lines. Ensure that each anchorage is capable of sustaining a 5000 pound minimum load. Ensure that anchorages used for personal fall arrest systems (safety lines) are independent of anchorages used for the suspension system (primary working lines) Ensure that personal fall arrest systems (safety lines) are not attached to guardrail systems. 2. Inspect all components of rope descent systems and all safety devices prior to assembling and using them. Immediately remove from service any components that have defects. Continuously monitor the condition of all components of rope descent systems during use. Remove from service rope descent racks with excessive wear. Conduct regular detailed inspections all components of rope descent systems subject to constant friction including rope descent racks. Mark or tag all ropes with date of manufacture and date placed in service. Track the use of primary working lines to ensure that they are not used longer than two (2) years from date first placed in service or three (3) years from date of manufacture. SPECIFIC ABATEMENT DOCUMENTATION IS REQUIRED IN ACCORDANCE WITH THE REQUIREMENTS OF 29 CFR 1903.19 (D)3.19
Recent events (2)
- — I (S) $2100.00
- — Z (S) $2100.00
5(a)(1)
- Issued
- Jun 17, 2009
- Abate by
- Jun 23, 2009
- Penalty
- Initial $4,200
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm in that employees were exposed to fall hazards: Jobsite at Sovereign Bank Building, 1350 Main Street, Springfield, MA: On or about 6/11/09 employees were exposed to fall hazards while using rope descent systems to wash the exterior windows of the seventeen (17) story building. 1.Primary working lines and safety lines were tied to the same guardrail structure on the roof. The tie off points had unknown strength. 2.Three white primary working lines and one yellow safety line had excessive wear. The lines were not marked with their identity or manufacture date. Two rack descent devices had excessive wear in grooves of the break bars where ropes ran around them. One rack descent device had a hole in one of the break bars where the rope wore through it. Webbing for one seatboard had the horizontal support straps cut off. The plywood for one seatboard had excessive deterioration where the wood plies in the plywood had delaminated. A plastic bucket used by one employee to hold cleaning solution and his tools had cracks in the plastic around the handle. 3.Employees using rope descent systems were using Mio Corp. Model RG-716 rope grabs that do not have an anti panic stop feature AMONG OTHER METHODS THE FOLLOWING ARE FEASIBLE AND ACCEPTABLE MEANS OF ABATING THE HAZARD: 1.Develop and implement a plan of service specifically for the 1350 Main Street Sovereign Bank Building in accordance with section 1.7 of American National Standards Institute standard ANSI/IWCA Z359.1, "Window Cleaning Safety". Identify in the work plan each anchorage that will be used as a tie off for both primary working lines and for safety lines. Have a registered professional engineer or qualified individual certify that each anchorage is capable of sustaining a 5000 pound minimum load. Ensure that anchorages used for personal fall arrest systems (safety lines) are independent of anchorages used for the suspension system (primary working lines) Ensure that personal fall arrest systems (safety lines) are not attached to guardrail systems. 2.Inspect all components of rope descent systems and all safety devices prior to assembling and using them. Immediately remove from service any components that have defects. Continuously monitor the condition of all components of rope descent systems during use.Remove from service all ropes with excessive wear. Mark or tag all ropes with date of manufacture and date placed in service. Track the use of primary working lines to ensure that they are not used longer than two (2) years from date first placed in service or three (3) years from date of manufacture. Remove from service rope descent racks with excessive wear. Conduct regular detailed inspections all components of rope descent systems subject to constant friction including rope descent racks. Remove from service defective seatboards. Remove from service the defective bucket. Securely attach all buckets to the seaboards in such a manner that the buckets cannot fall. 3.Use rope grabs that have an anti panic stop feature. SPECIFIC ABATEMENT DOCUMENTATION IS REQUIRED IN ACCORDANCE WITH THE REQUIREMENTS OF 29 CFR 1903.19 (D)3.19
Recent events (2)
- — I (S)
- — Z (S) $4200.00
More inspections in this industry (NAICS 561720)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 313200263.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.