OSHA Inspection: CONCEPT PLASTICS, INC.

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of CONCEPT PLASTICS, INC. in 1218 HICKORY CHAPEL RD., HIGH POINT, NC 27261 (NAICS 325991). OSHA activity number 313600157.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Concept Plastics, INC. — free Get an email when a new federal OSHA severe-injury report for Concept Plastics, INC. is published. One employer, no account, unsubscribe in one click.
Site address
1218 HICKORY CHAPEL RD.
City
HIGH POINT
State
NC
ZIP
27261
Mailing
P.O. BOX 847, HIGH POINT, NC 27261
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325991
SIC code (legacy)
3087
Employees
65
Ownership type
A
Industry flags
Manufacturing health.

16 citations on file for this inspection.

95012901

Serious 2 instances 20 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Penalty
Initial $2,100 · Current $1,400 Reduced
North Carolina General Statute 95-129(1) of the Occupational Safety and
Health Act of North Carolina:  The
employer did not furnish each of his employees conditions of employment
and a place of employment free from
recognized hazards that were causing or likely to cause death or serious
physical harm to employees in that
employees were exposed to fire and explosion hazards:
a)Mixing Room, Clean-Up Area, Sanding Department - the work tasks,
including, but not
limited to, sanding and  cutting of styrene resin based furniture
components, and mixing
of various dust components to create the styrene resin based materials for
casting,
produced dust that was not properly contained.  Particularly in the Mixing
Room, at
least 95of the horizontal surfaces, including the floor, had accumulated
dust greater
than one inch thick.  The Sanding/Sawing Department and Clean-Up Area
contained
varying degrees of the dust ranging from 1/32 of an inch to several inches
on
the
majority of horizontal surfaces, including but not limited to, the
following:  building
supports (joists), cross braces, work surfaces, sanding and sawing
equipment,
flourescent light bulbs and housings, compressed air lines, water lines,
electrical
equipment, and sprinkler system piping.  The accumulated dust consisted of
the various
components, including cornstarch, wheat flour, ground pecan nut shell
flour, marble,
boron oxide, and styrene in resin.  Cornstarch, pecan nut shell flour, and
wheat flour
were listed in NFPA 499, 1997 edition, as Group G combustible dusts.
There were
various deficiencies in attempted controls for the dust, including, but
not limited to, the
following:  there had been no process hazard analysis completed for the
process, the
housekeeping program was not effective in eliminating accumulated dust on
overhead
surfaces in the work area, there were no management of change procedures
for
ventilation systems carrying wood dust and the styrene resin based dust,
fugitive dust
control measures were not in place, there was the lack of an inspection,
testing, and
maintenance program for the ventilation system, the methods for adding
dust to
mixtures included only manual dumping, and the dust collection equipment
duct work
was not grounded and bonded.
REFERENCE:  National Fire Protection Agency Standard no.654:  Standard for
the Prevention
of Fire and Dust Explosions from the Manufacturing, Processing, and
Handling of Combustible
Particulate Solids, 2006 edition.
NOTE:  Among other methods of abatement, one feasible and acceptable
method to correct
these hazards would be to follow the guidelines established in the
National Fire Protection
Agency Standard no.654:  Standard for the Prevention of Fire and Dust
Explosions from the
Manufacturing, Processing, and Handling of Combustible Particulate Solids,
2006
edition.
Recent events (3)
  • — I (S) $1400.00
  • — P (S) $2100.00
  • — Z (S) $2100.00

1910.22 A01

Serious 1 instance 20 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Penalty
Initial $2,100
Recent events (3)
  • — I (S)
  • — P (S) $2100.00
  • — Z (S) $2100.00

1910.106 D02 I

Serious 1 instance 20 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Penalty
Initial $1,500 · Current $1,000 Reduced
Recent events (3)
  • — I (S) $1000.00
  • — P (S) $1500.00
  • — Z (S) $1500.00

1910.106 D02 III

Serious 1 instance 20 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Recent events (2)
  • — P (S)
  • — Z (S)

1910.106 E06 II

Serious 1 instance 20 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Penalty
Initial $1,500
Recent events (3)
  • — I (S)
  • — P (S) $1500.00
  • — Z (S) $1500.00

1910.145 C03

Serious 1 instance 20 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Penalty
Initial $2,100 · Current $1,400 Reduced
Recent events (3)
  • — I (S) $1400.00
  • — P (S) $2100.00
  • — Z (S) $2100.00

1910.147 C06 I

Other-than-serious 1 instance 1 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Penalty
Initial $900
Recent events (3)
  • — I (O)
  • — P (S) $900.00
  • — Z (S) $900.00

1910.212 A01

Serious 1 instance 1 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Penalty
Initial $900 · Current $600 Reduced
Recent events (3)
  • — I (S) $600.00
  • — P (S) $900.00
  • — Z (S) $900.00

1910.212 B

Serious 3 instances 4 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Penalty
Initial $900 · Current $600 Reduced
Recent events (3)
  • — I (S) $600.00
  • — P (S) $900.00
  • — Z (S) $900.00

1910.242 B

Serious 3 instances 20 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Penalty
Initial $2,100 · Current $1,400 Reduced
Recent events (3)
  • — I (S) $1400.00
  • — P (S) $2100.00
  • — Z (S) $2100.00

1910.307 C02 I

Deleted Serious 1 instance 20 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Penalty
Initial $2,100 · Current $2,100
Recent events (3)
  • — I (S) $2100.00
  • — P (S) $2100.00
  • — Z (S) $2100.00

1910.23 D01 III

Other-than-serious 1 instance 4 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Recent events (2)
  • — P (O)
  • — Z (O)

1910.107 B09

Other-than-serious 1 instance 3 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Recent events (2)
  • — P (O)
  • — Z (O)

1910.176 B

Other-than-serious 1 instance 2 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Recent events (2)
  • — P (O)
  • — Z (O)

1910.178 A06

Other-than-serious 1 instance 1 exposed
Issued
Dec 16, 2009
Abate by
Feb 19, 2010
Recent events (2)
  • — P (O)
  • — Z (O)

1910.134 D01 III

Other-than-serious 2 instances 4 exposed
Issued
Dec 16, 2009
Abate by
Dec 21, 2009

Hazardous substances 04302280

View Concept Plastics, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 313600157.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.