OSHA Inspection: MARSHALL DURBIN

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MARSHALL DURBIN in 1301 JAMES ST, HATTIESBURG, MS 39401 (NAICS 311615). OSHA activity number 313629719.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Marshall Durbin — free Get an email when a new federal OSHA severe-injury report for Marshall Durbin is published. One employer, no account, unsubscribe in one click.
Establishment
MARSHALL DURBIN
Site address
1301 JAMES ST
City
HATTIESBURG
State
MS
ZIP
39401
Mailing
P.O. BOX 991, HATTIESBURG, MS 39401
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
311615
SIC code (legacy)
2015
Employees
968
Ownership type
A
Industry flags
Manufacturing safety.

18 citations on file for this inspection.

1910.37 B04

Serious Gravity 02 1 instance 100 exposed
Issued
Apr 1, 2010
Abate by
May 4, 2010
Penalty
Initial $1,500 · Current $900 Reduced
Recent events (2)
  • — I (S) $900.00
  • — Z (S) $1500.00

1910.132 A

Deleted Serious Gravity 02 1 instance 5 exposed
Issued
Apr 1, 2010
Abate by
Apr 8, 2010
Penalty
Initial $1,500 · Current $1,500
Recent events (2)
  • — I (S) $1500.00
  • — Z (S) $1500.00

1910.132 D01

Deleted Serious Gravity 02 1 instance 100 exposed
Issued
Apr 1, 2010
Abate by
Apr 20, 2010
Penalty
Initial $1,500 · Current $1,500
Recent events (2)
  • — I (S) $1500.00
  • — Z (S) $1500.00

1910.147 C05 IID

Serious Gravity 01 1 instance 5 exposed
Issued
Apr 1, 2010
Abate by
Apr 13, 2010
Penalty
Initial $1,125 · Current $800 Reduced
Recent events (2)
  • — I (S) $800.00
  • — Z (S) $1125.00

1910.151 C

Serious Gravity 02 2 instances 2 exposed
Issued
Apr 1, 2010
Abate by
Apr 13, 2010
Penalty
Initial $1,500 · Current $900 Reduced
Recent events (2)
  • — I (S) $900.00
  • — Z (S) $1500.00

1910.179 H04

Serious Gravity 02 1 instance 3 exposed
Issued
Apr 1, 2010
Abate by
Apr 13, 2010
Penalty
Initial $1,500 · Current $900 Reduced
Recent events (2)
  • — I (S) $900.00
  • — Z (S) $1500.00

1910.212 A01

Serious Gravity 02 1 instance 1 exposed
Issued
Apr 1, 2010
Abate by
Apr 6, 2010
Penalty
Initial $1,500 · Current $900 Reduced
Recent events (2)
  • — I (S) $900.00
  • — Z (S) $1500.00

1910.219 C04 I

Serious Gravity 02 1 instance 5 exposed
Issued
Apr 1, 2010
Abate by
Apr 6, 2010
Penalty
Initial $1,500 · Current $900 Reduced
Recent events (2)
  • — I (S) $900.00
  • — Z (S) $1500.00

1910.219 D01

Serious Gravity 02 1 instance 1 exposed
Issued
Apr 1, 2010
Abate by
Apr 9, 2010
Penalty
Initial $1,500 · Current $900 Reduced
Recent events (2)
  • — I (S) $900.00
  • — Z (S) $1500.00

1910.219 E03 I

Serious Gravity 02 1 instance 1 exposed
Issued
Apr 1, 2010
Abate by
Apr 9, 2010
Recent events (2)
  • — I (S)
  • — Z (S)

1910.219 F03

Serious Gravity 02 1 instance 1 exposed
Issued
Apr 1, 2010
Abate by
Apr 6, 2010
Penalty
Initial $1,500 · Current $900 Reduced
Recent events (2)
  • — I (S) $900.00
  • — Z (S) $1500.00

1910.253 B02 II

Serious Gravity 01 1 instance 1 exposed
Issued
Apr 1, 2010
Abate by
Apr 6, 2010
Penalty
Initial $1,500 · Current $900 Reduced
Recent events (2)
  • — I (S) $900.00
  • — Z (S) $1500.00

1910.253 B04 III

Serious Gravity 02 1 instance 1 exposed
Issued
Apr 1, 2010
Abate by
Apr 6, 2010
Recent events (2)
  • — I (S)
  • — Z (S)

1910.303 B01

Deleted Serious Gravity 01 1 instance 1 exposed
Issued
Apr 1, 2010
Abate by
Apr 9, 2010
Penalty
Initial $1,125 · Current $1,125
Recent events (2)
  • — I (S) $1125.00
  • — Z (S) $1125.00

1910.303 F01

Serious Gravity 01 1 instance 1 exposed
Issued
Apr 1, 2010
Abate by
Apr 9, 2010
Penalty
Initial $1,125 · Current $800 Reduced
Recent events (2)
  • — I (S) $800.00
  • — Z (S) $1125.00

1910.303 G02 I

Serious Gravity 03 4 instances 100 exposed
Issued
Apr 1, 2010
Abate by
Apr 6, 2010
Penalty
Initial $1,875 · Current $1,000 Reduced
Recent events (2)
  • — I (S) $1000.00
  • — Z (S) $1875.00

1910.305 E01

Serious Gravity 05 1 instance 1 exposed
Issued
Apr 1, 2010
Abate by
Apr 6, 2010
Penalty
Initial $2,625 · Current $1,400 Reduced
Recent events (2)
  • — I (S) $1400.00
  • — Z (S) $2625.00

1910.305 G01 IVB

Serious Gravity 01 2 instances 8 exposed
Issued
Apr 1, 2010
Abate by
Apr 6, 2010
Penalty
Initial $1,125 · Current $800 Reduced
Recent events (2)
  • — I (S) $800.00
  • — Z (S) $1125.00

View Marshall Durbin's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 313629719.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.