Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,191,288Inspections Most recent open 2026-07-24 Last loaded 2026-07-31

OSHA Inspection: FISHER PIPE LINE CONSTRUCTION COMPANY INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of FISHER PIPE LINE CONSTRUCTION COMPANY INC. in E EXPRESSWAY 83 FRONTAGE RD, HARLINGEN, TX 78550 (NAICS 237110). OSHA activity number 313636508.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Fisher Pipe Line Construction Company INC. — free Get an email when a new federal OSHA severe-injury report for Fisher Pipe Line Construction Company INC. is published. One employer, no account, unsubscribe in one click.
Site address
E EXPRESSWAY 83 FRONTAGE RD
City
HARLINGEN
State
TX
ZIP
78550
Mailing
3226 N VICTORIA RD, DONNA, TX 78537
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237110
SIC code (legacy)
1623
Employees
11
Ownership type
A

7 citations on file for this inspection.

1926.28 A

Serious Gravity 01 1 instance 2 exposed
Issued
Oct 30, 2009
Abate by
Nov 4, 2009
Penalty
Initial $600 · Current $330 Reduced
Recent events (2)
  • — I (S) $330.00
  • — Z (S) $600.00

1926.550 A15 I

Deleted Serious Gravity 03 1 instance 1 exposed
Issued
Oct 30, 2009
Abate by
Nov 4, 2009
Penalty
Initial $1,000
Recent events (2)
  • — I (S)
  • — Z (S) $1000.00

1926.550 A15 IV

Deleted Serious Gravity 03 1 instance 1 exposed
Issued
Oct 30, 2009
Abate by
Nov 4, 2009
Recent events (2)
  • — I (S)
  • — Z (S)

1926.651 C02

Serious Gravity 01 1 instance 1 exposed
Issued
Oct 30, 2009
Abate by
Nov 4, 2009
Penalty
Initial $600 · Current $330 Reduced
Recent events (2)
  • — I (S) $330.00
  • — Z (S) $600.00

1926.651 J02

Repeat Gravity 02 1 instance 1 exposed
Issued
Oct 30, 2009
Abate by
Nov 4, 2009
Penalty
Initial $1,600 · Current $880 Reduced
Recent events (2)
  • — I (R) $880.00
  • — Z (R) $1600.00

1926.652 A01

Repeat Gravity 03 1 instance 1 exposed
Issued
Oct 30, 2009
Abate by
Nov 4, 2009
Penalty
Initial $2,000 · Current $1,100 Reduced
Recent events (2)
  • — I (R) $1100.00
  • — Z (R) $2000.00

1926.20 B02

Other-than-serious Gravity 01 1 instance 1 exposed
Issued
Oct 30, 2009
Abate by
Nov 4, 2009

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 313636508.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.