Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: BORDEN REMINGTON CORPORATION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BORDEN REMINGTON CORPORATION in 63 WATER STREET, FALL RIVER, MA 02721 (NAICS 325188). OSHA activity number 313797292.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Borden Remington Corporation — free Get an email when a new federal OSHA severe-injury report for Borden Remington Corporation is published. One employer, no account, unsubscribe in one click.
Site address
63 WATER STREET
City
FALL RIVER
State
MA
ZIP
02721
Mailing
P.O. BOX 2573, FALL RIVER, MA 02722
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325188
SIC code (legacy)
2819
Employees
50
Ownership type
A

14 citations on file for this inspection.

1910.119 D02 IA

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Nov 1, 2010
Penalty
Initial $4,200 · Current $2,500 Reduced
29 CFR 1910.119(d)(2)(i)(A):  Process safety information pertaining to the
technology of the
process did not include a block flow diagram or simplified process flow
diagram:
Facility:  The employer failed to include all main flow streams and major
process equipment of
the sodium hypochlorite process in the block flow diagram such as, but not
limited to:
1)Flow of product stream after bleach reactor.
2)Recycle bleach loop with accumulator recycle tank.
3)Cooling water loop with cooling tower.
4)Provent Scrubber flow streams.
5)Heat exchangers, pumps, and metering valves.
Recent events (2)
  • — I (S) $2500.00
  • — Z (S) $4200.00

1910.119 D02 IB

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Oct 5, 2010
29 CFR 1910.119(d)(2)(i)(B):  Process safety information pertaining to the
technology of the
process did not include the process chemistry:
Facility:  The employer failed to document the process chemistry of the
sodium hypochlorite
process.
Recent events (2)
  • — I (S)
  • — Z (S)

1910.119 D02 ID

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Oct 5, 2010
29 CFR 1910.119(d)(2)(i)(D):  Process safety information pertaining to the
technology of the
process did not include the safe upper and lower limits for such items as
temperatures,
pressures, flows or compositions:
Facility: The employer failed to document safe upper and lower limits for
process parameters
such as, but not limited to, temperature, pressure, flows, and
composition.
Recent events (2)
  • — I (S)
  • — Z (S)

1910.119 D03 IC

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Oct 5, 2010
Penalty
Initial $4,200 · Current $2,500 Reduced
29 CFR 1910.119(d)(3)(i)(C):  Process safety information pertaining to the
equipment in the
process did not include the electrical classification:
Facility: The employer failed to document the electrical classification
for the process equipment
such as, but not limited to:
1)   7.5 HP 2113A starter/disconnect for the bleach dilution water pump
2)   7.5 HP 2113A starter/disconnect for the process water pump
3)   25 HP 2113A starter/disconnect for the cooling water pump
4)   25 HP 2113A starter/disconnect for the cooling tower fan 2 speed
Consequent Pole
5)   10 HP 2113A starter/disconnect for the bleach plant 50caustic pump
6)   7.5 HP 21113A starter/disconnect for the bleach dilution 50caustic
pump
7)   Twin disconnect with 30 amp breakers for 10 HP air padding system &
spare
8)   15 HP 2113A starter/disconnect for Provent chlorine line scrubber
9)   25 HP 2113A starter/disconnect for Bleach Plant recycle pump
10)  15 HP 2113A starter/disconnect for Bleach Filter pump
11)25 HP 2113A starter/disconnect for Bleach Water Backwash pump
12)1/3 HP 2113A starter/disconnect for filter screen motor
13)10 HP 2113A starter/disconnect for Bleach Dilution pump
14)10 HP 2113A starter/disconnect for Bleach Loading pump
15)5 HP  2113A starter/disconnect for filter pre-coat, unfiltered bleach
tank vents, and bag
opening station fan
Recent events (2)
  • — I (S) $2500.00
  • — Z (S) $4200.00

1910.119 D03 IG

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Nov 1, 2010
29 CFR 1910.119(d)(3)(i)(G):  Process safety information pertaining to the
equipment
did not
include the material and energy balances for processes built after May 26,
1992:
Facility:  The employer failed to document the material and energy
balances for the sodium
hypochlorite process.rite
Recent events (2)
  • — I (S)
  • — Z (S)

1910.119 E03 I

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Feb 28, 2011
Penalty
Initial $4,200 · Current $2,500 Reduced
29 CFR 1910.119(e)(3)(i):  The process hazard analysis (PHA) did not
address the hazards of
the process:
Facility:  The PHA did not address the hazards of the sodium hydrochlorite
process such as, but
not limited to:
1)Hazards related to the Provent Scrubber node.
2)Hazards related to the Cooling Tower node.
3)Outdoor environmental factors affecting the safe operation of process
equipment.
4)Failure of process equipment including pumps, heat exchanger, and
accumulation tanks.
5)Process equipments located downstream of the bleach reactor.
6)Failure of pressure relief devices.
Recent events (2)
  • — I (S) $2500.00
  • — Z (S) $4200.00

1910.119 E05

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Feb 28, 2011
Penalty
Initial $4,200 · Current $2,500 Reduced
29 CFR 1910.119(e)(5):  The employer did not establish a system to assure
that the process
hazard analysis team's recommendations are resolved in a timely manner and
that the resolution
is documented:
Facility: The employer did not establish a system to address the
recommendations documented
in the initial process hazard analysis.
Recent events (2)
  • — I (S) $2500.00
  • — Z (S) $4200.00

1910.119 F01 III

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Jan 3, 2011
Penalty
Initial $4,200 · Current $2,500 Reduced
29 CFR 1910.119(f)(1)(iii):  The employer's written operating procedures
did not address the
requirements for the safety and health considerations listed in 29 CFR
1910.119(f)(1)(iii)(A)
through (f)(1)(iii)(E):
Facility: The employer failed to include safety and health considerations
in the following existing
operating procedures, such as precautions necessary to prevent exposure
and control measures
to be taken in case of physical contact or airborne exposure:
1)Sodium Hypochlorite Run Sheet (BOR-096)
2)Sodium Hypochlorite Start Up Procedure (B17-319)
3)Provent Scrubber Process (B17-321)
4)Chlorine Padding System (B17-322)
5)Bleach Filtering System (B17-323)
6)Chlorine Unloading (B17-324)
7)Dilution Procedure (B17-320)
Recent events (2)
  • — I (S) $2500.00
  • — Z (S) $4200.00

1910.119 H02 I

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Nov 3, 2010
Penalty
Initial $4,200 · Current $2,500 Reduced
29 CFR 1910.119(h)(2)(i):  The employer, when selecting a contractor, did
not obtain and
evaluate information regarding the contract employer's safety performance
and programs:
Facility:  The employer failed to evaluate the mechanical contractor's
safety and health
programs.  The mechanical contractor lacks safety programs such as, but
not limited to,
lockout/tagout, hot works, and personal protective equipment.
Recent events (2)
  • — I (S) $2500.00
  • — Z (S) $4200.00

1910.119 J02

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Nov 3, 2010
Penalty
Initial $4,200 · Current $2,500 Reduced
29 CFR 1910.119(j)(2):  The employer did not establish and implement
written procedures to
maintain the on-going mechanical integrity of process equipment:
Facility: The employer did not develop and implement written mechanical
integrity procedures
to maintain the on-going mechanical integrity of process equipment
including, but not limited
to:
1)Skid mounted system containing recycle pumps, tanks, piping,
instrumentation and PLC
controls
2)Remote Mounted Motor Control Center
3)Marley Cooling Tower and associated motors, pumps, tanks, and level
control
4)30 SCFM 10 HP chlorine tank car padding unit
5)Provent Chlorine Scrubber
6)Chlorine tank car unloading system
7)Unipro shutoff system equipment
8)Pressure relief valves
9)Chlorine gas detectorse
Recent events (2)
  • — I (S) $2500.00
  • — Z (S) $4200.00

1910.119 J03

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Nov 1, 2010
29 CFR 1910.119(j)(3):  The employer did not train each employee involve
in maintaining the
on-going mechanical integrity of process equipment in an overview of that
process and its
hazards and in the procedures applicable to the employee's job tasks to
asssure that the employee
can perform the job tasks in a safe manner:
Facility: The employer did not train the employees on the mechanical
integrity procedures.

1910.119 J04 I

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Nov 1, 2010
Penalty
Initial $4,200 · Current $2,500 Reduced
29 CFR 1910.119(j)(4)(i):  Inspections and tests were not performed on
process equipment to
maintain its mechanical integrity:
Facility: The employer did not conduct inspections and tests on the
process equipment such as,
but not limited to:
1)Skid mounted system containing recycle pumps, tanks, piping,
instrumentation controls
2) Remote Mounted Motor Control Center
3)Marley Cooling Tower and associated motors, pumps, tanks, and level
control
4)30 SCFM 10 HP chlorine tank care padding unit
5)Provent Chlorine Scrubber
6)Chlorine tank car unloading system
7)Unipro shutoff system equipment
8)Pressure relief valves
9)Chlorine gas detectors
The inspections and tests shall comply with the provisions of 29 CFR
1910.119(j)(4)(ii), (iii),
and (iv).,
Recent events (2)
  • — I (S) $2500.00
  • — Z (S) $4200.00

1910.119 J05

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Oct 5, 2010
Penalty
Initial $4,200 · Current $2,500 Reduced
29 CFR 1910.119(j)(5):  The employer did not correct deficiencies in
equipment that were
outside acceptable limits (as defined by process information in 29 CFR
1910.119(d)) before
further use or in a safe and timely manner:
Facility: The employer did not correct process equipment deficiencies
including, but not limited
to:
1)  Provent Scrubber leaky bottom flange connections
2)  Non-functional Durco G4 plug valve
Recent events (2)
  • — I (S) $2500.00
  • — Z (S) $4200.00

1910.119 O01

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 19, 2010
Abate by
Feb 28, 2011
Penalty
Initial $4,200 · Current $2,500 Reduced
29 CFR 1910.119(o)(1):  The employer did not certify that they had
evaluated compliance with
the provisions of 29 CFR 1910.119 at least every three years to verify
that the procedures and
practices developed under this standard were adequate and are being
followed:
Facility:  The employer did not evaluate the process safety management
program for compliance
with the provisions of 29 CFR 1910.119.  The mechanical integrity
procedures and contractor
safety program were not evaluated.
Recent events (2)
  • — I (S) $2500.00
  • — Z (S) $4200.00

View Borden Remington Corporation's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 313797292.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.