FALL RIVER, MA —
OSHA Inspection: BORDEN REMINGTON CORPORATION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of BORDEN REMINGTON CORPORATION in 63 WATER STREET, FALL RIVER, MA 02721 (NAICS 325188). OSHA activity number 313797292.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BORDEN REMINGTON CORPORATION
- Site address
- 63 WATER STREET
- City
- FALL RIVER
- State
- MA
- ZIP
- 02721
- Mailing
- P.O. BOX 2573, FALL RIVER, MA 02722
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325188
- SIC code (legacy)
- 2819
- Employees
- 50
- Ownership type
- A
Citations
14 citations on file for this inspection.
1910.119 D02 IA
- Issued
- Aug 19, 2010
- Abate by
- Nov 1, 2010
- Penalty
- Initial $4,200 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(d)(2)(i)(A): Process safety information pertaining to the technology of the process did not include a block flow diagram or simplified process flow diagram: Facility: The employer failed to include all main flow streams and major process equipment of the sodium hypochlorite process in the block flow diagram such as, but not limited to: 1)Flow of product stream after bleach reactor. 2)Recycle bleach loop with accumulator recycle tank. 3)Cooling water loop with cooling tower. 4)Provent Scrubber flow streams. 5)Heat exchangers, pumps, and metering valves.
Recent events (2)
- — I (S) $2500.00
- — Z (S) $4200.00
1910.119 D02 IB
- Issued
- Aug 19, 2010
- Abate by
- Oct 5, 2010
General-duty citation text
29 CFR 1910.119(d)(2)(i)(B): Process safety information pertaining to the technology of the process did not include the process chemistry: Facility: The employer failed to document the process chemistry of the sodium hypochlorite process.
Recent events (2)
- — I (S)
- — Z (S)
1910.119 D02 ID
- Issued
- Aug 19, 2010
- Abate by
- Oct 5, 2010
General-duty citation text
29 CFR 1910.119(d)(2)(i)(D): Process safety information pertaining to the technology of the process did not include the safe upper and lower limits for such items as temperatures, pressures, flows or compositions: Facility: The employer failed to document safe upper and lower limits for process parameters such as, but not limited to, temperature, pressure, flows, and composition.
Recent events (2)
- — I (S)
- — Z (S)
1910.119 D03 IC
- Issued
- Aug 19, 2010
- Abate by
- Oct 5, 2010
- Penalty
- Initial $4,200 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i)(C): Process safety information pertaining to the equipment in the process did not include the electrical classification: Facility: The employer failed to document the electrical classification for the process equipment such as, but not limited to: 1) 7.5 HP 2113A starter/disconnect for the bleach dilution water pump 2) 7.5 HP 2113A starter/disconnect for the process water pump 3) 25 HP 2113A starter/disconnect for the cooling water pump 4) 25 HP 2113A starter/disconnect for the cooling tower fan 2 speed Consequent Pole 5) 10 HP 2113A starter/disconnect for the bleach plant 50caustic pump 6) 7.5 HP 21113A starter/disconnect for the bleach dilution 50caustic pump 7) Twin disconnect with 30 amp breakers for 10 HP air padding system & spare 8) 15 HP 2113A starter/disconnect for Provent chlorine line scrubber 9) 25 HP 2113A starter/disconnect for Bleach Plant recycle pump 10) 15 HP 2113A starter/disconnect for Bleach Filter pump 11)25 HP 2113A starter/disconnect for Bleach Water Backwash pump 12)1/3 HP 2113A starter/disconnect for filter screen motor 13)10 HP 2113A starter/disconnect for Bleach Dilution pump 14)10 HP 2113A starter/disconnect for Bleach Loading pump 15)5 HP 2113A starter/disconnect for filter pre-coat, unfiltered bleach tank vents, and bag opening station fan
Recent events (2)
- — I (S) $2500.00
- — Z (S) $4200.00
1910.119 D03 IG
- Issued
- Aug 19, 2010
- Abate by
- Nov 1, 2010
General-duty citation text
29 CFR 1910.119(d)(3)(i)(G): Process safety information pertaining to the equipment did not include the material and energy balances for processes built after May 26, 1992: Facility: The employer failed to document the material and energy balances for the sodium hypochlorite process.rite
Recent events (2)
- — I (S)
- — Z (S)
1910.119 E03 I
- Issued
- Aug 19, 2010
- Abate by
- Feb 28, 2011
- Penalty
- Initial $4,200 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(e)(3)(i): The process hazard analysis (PHA) did not address the hazards of the process: Facility: The PHA did not address the hazards of the sodium hydrochlorite process such as, but not limited to: 1)Hazards related to the Provent Scrubber node. 2)Hazards related to the Cooling Tower node. 3)Outdoor environmental factors affecting the safe operation of process equipment. 4)Failure of process equipment including pumps, heat exchanger, and accumulation tanks. 5)Process equipments located downstream of the bleach reactor. 6)Failure of pressure relief devices.
Recent events (2)
- — I (S) $2500.00
- — Z (S) $4200.00
1910.119 E05
- Issued
- Aug 19, 2010
- Abate by
- Feb 28, 2011
- Penalty
- Initial $4,200 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(e)(5): The employer did not establish a system to assure that the process hazard analysis team's recommendations are resolved in a timely manner and that the resolution is documented: Facility: The employer did not establish a system to address the recommendations documented in the initial process hazard analysis.
Recent events (2)
- — I (S) $2500.00
- — Z (S) $4200.00
1910.119 F01 III
- Issued
- Aug 19, 2010
- Abate by
- Jan 3, 2011
- Penalty
- Initial $4,200 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(f)(1)(iii): The employer's written operating procedures did not address the requirements for the safety and health considerations listed in 29 CFR 1910.119(f)(1)(iii)(A) through (f)(1)(iii)(E): Facility: The employer failed to include safety and health considerations in the following existing operating procedures, such as precautions necessary to prevent exposure and control measures to be taken in case of physical contact or airborne exposure: 1)Sodium Hypochlorite Run Sheet (BOR-096) 2)Sodium Hypochlorite Start Up Procedure (B17-319) 3)Provent Scrubber Process (B17-321) 4)Chlorine Padding System (B17-322) 5)Bleach Filtering System (B17-323) 6)Chlorine Unloading (B17-324) 7)Dilution Procedure (B17-320)
Recent events (2)
- — I (S) $2500.00
- — Z (S) $4200.00
1910.119 H02 I
- Issued
- Aug 19, 2010
- Abate by
- Nov 3, 2010
- Penalty
- Initial $4,200 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(h)(2)(i): The employer, when selecting a contractor, did not obtain and evaluate information regarding the contract employer's safety performance and programs: Facility: The employer failed to evaluate the mechanical contractor's safety and health programs. The mechanical contractor lacks safety programs such as, but not limited to, lockout/tagout, hot works, and personal protective equipment.
Recent events (2)
- — I (S) $2500.00
- — Z (S) $4200.00
1910.119 J02
- Issued
- Aug 19, 2010
- Abate by
- Nov 3, 2010
- Penalty
- Initial $4,200 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: Facility: The employer did not develop and implement written mechanical integrity procedures to maintain the on-going mechanical integrity of process equipment including, but not limited to: 1)Skid mounted system containing recycle pumps, tanks, piping, instrumentation and PLC controls 2)Remote Mounted Motor Control Center 3)Marley Cooling Tower and associated motors, pumps, tanks, and level control 4)30 SCFM 10 HP chlorine tank car padding unit 5)Provent Chlorine Scrubber 6)Chlorine tank car unloading system 7)Unipro shutoff system equipment 8)Pressure relief valves 9)Chlorine gas detectorse
Recent events (2)
- — I (S) $2500.00
- — Z (S) $4200.00
1910.119 J03
- Issued
- Aug 19, 2010
- Abate by
- Nov 1, 2010
General-duty citation text
29 CFR 1910.119(j)(3): The employer did not train each employee involve in maintaining the on-going mechanical integrity of process equipment in an overview of that process and its hazards and in the procedures applicable to the employee's job tasks to asssure that the employee can perform the job tasks in a safe manner: Facility: The employer did not train the employees on the mechanical integrity procedures.
1910.119 J04 I
- Issued
- Aug 19, 2010
- Abate by
- Nov 1, 2010
- Penalty
- Initial $4,200 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(i): Inspections and tests were not performed on process equipment to maintain its mechanical integrity: Facility: The employer did not conduct inspections and tests on the process equipment such as, but not limited to: 1)Skid mounted system containing recycle pumps, tanks, piping, instrumentation controls 2) Remote Mounted Motor Control Center 3)Marley Cooling Tower and associated motors, pumps, tanks, and level control 4)30 SCFM 10 HP chlorine tank care padding unit 5)Provent Chlorine Scrubber 6)Chlorine tank car unloading system 7)Unipro shutoff system equipment 8)Pressure relief valves 9)Chlorine gas detectors The inspections and tests shall comply with the provisions of 29 CFR 1910.119(j)(4)(ii), (iii), and (iv).,
Recent events (2)
- — I (S) $2500.00
- — Z (S) $4200.00
1910.119 J05
- Issued
- Aug 19, 2010
- Abate by
- Oct 5, 2010
- Penalty
- Initial $4,200 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (as defined by process information in 29 CFR 1910.119(d)) before further use or in a safe and timely manner: Facility: The employer did not correct process equipment deficiencies including, but not limited to: 1) Provent Scrubber leaky bottom flange connections 2) Non-functional Durco G4 plug valve
Recent events (2)
- — I (S) $2500.00
- — Z (S) $4200.00
1910.119 O01
- Issued
- Aug 19, 2010
- Abate by
- Feb 28, 2011
- Penalty
- Initial $4,200 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(o)(1): The employer did not certify that they had evaluated compliance with the provisions of 29 CFR 1910.119 at least every three years to verify that the procedures and practices developed under this standard were adequate and are being followed: Facility: The employer did not evaluate the process safety management program for compliance with the provisions of 29 CFR 1910.119. The mechanical integrity procedures and contractor safety program were not evaluated.
Recent events (2)
- — I (S) $2500.00
- — Z (S) $4200.00
More inspections at Borden Remington Corporation
View Borden Remington Corporation's full OSHA safety record →
More inspections in this industry (NAICS 325188)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 313797292.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.