BOULDER CITY, NV —
OSHA Inspection: OBAYASHI/PSM JV
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of OBAYASHI/PSM JV in 12550 U.S. 95 SOUTH, BOULDER CITY, NV 89006 (NAICS 237310). OSHA activity number 313970378.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- OBAYASHI/PSM JV
- Site address
- 12550 U.S. 95 SOUTH
- City
- BOULDER CITY
- State
- NV
- ZIP
- 89006
- Mailing
- P.O. BOX 61108, BOULDER CITY, NV 89006
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237310
- SIC code (legacy)
- 1611
- Employees
- 115
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
8 citations on file for this inspection.
618037501
- Issued
- May 25, 2010
- Abate by
- May 28, 2010
- Penalty
- Initial $1,750 · Current $1,750
General-duty citation text
Nevada Revised Statute 618.375(1): Duties of employers. The employer failed to furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to his employees: The employer failed to ensure that a wire rope static line used for fall protection was properly secured with wire rope clips, as follows: a.At the Hoover Dam Bypass Bridge construction site, employees were exposed to a fall hazard of 890 feet while tied off to a static lifeline that was not anchored correctly in that the wire rope clips were not installed in accordance with the manufacturer's specifications, as follows: Three wire rope clips were being used to secure the north end of the static lifeline around an anchor. The saddle portion of the clips were observed to be installed onto the dead end of the wire rope with the U-Bolt portion on the live end. Furthermore, the wire rope clips had been tightened with a ratchet wrench and socket rather than a torque wrench as was required by the manufacturer. Two employees tied off to this lifeline, in the condition as described above, to perform the abatement of a loose top rail that was part of an adjacent guardrail system, which had a deflection less than 39 inches above the walking/working surface. Reference: The Crosby Group, Inc., Forged Wire Rope Clips, Page 50: Warning *Failure to read, understand, and follow these instructions may cause death or serious injury. *Read and understand these instructions before using clips. *Match the same size clip to the same size wire rope. *Prepare wire rope end termination only as instructed. *Do not use with plastic coated wire rope. *Apply first load to test the assembly. This load should be of equal or greater weight than loads expected in use. Next, check and re-tighten nuts to recommended torque (See Table 1). 1.Refer to Table 1 in following these instructions. Turn back specified amount of rope from thimble or loop. Apply first clip one base width from dead end of rope. Apply U-Bolt over dead end of wire rope - live end rests in saddle (Never saddle a dead horse!). Use torque wrench to tighten evenly, alternate from one nut to the other until reaching the recommended torque. One feasible means of abatement would be to require employees assigned to install and/or tie off onto static lines to successfully complete a refresher training course that emphasizes the requirements specified by the manufacturer.
Recent events (2)
- — L (O) $1750.00
- — Z (S) $1750.00
1910.23 C01
- Issued
- May 25, 2010
- Abate by
- May 28, 2010
- Penalty
- Initial $825 · Current $825
Recent events (2)
- — L (O) $825.00
- — Z (S) $825.00
1910.305 G01 IVB
- Issued
- May 25, 2010
- Abate by
- Apr 7, 2011
Recent events (2)
- — L (O)
- — Z (O)
1926.251 A04
- Issued
- May 25, 2010
- Abate by
- May 28, 2010
- Penalty
- Initial $550 · Current $550
Recent events (2)
- — L (O) $550.00
- — Z (O) $550.00
1926.251 E08 IV
- Issued
- May 25, 2010
- Abate by
- May 28, 2010
Recent events (2)
- — L (O)
- — Z (O)
1926.502 B04
- Issued
- May 25, 2010
- Abate by
- May 28, 2010
- Penalty
- Initial $550 · Current $550
Recent events (2)
- — L (O) $550.00
- — Z (O) $550.00
1926.502 B09
- Issued
- May 25, 2010
- Abate by
- May 28, 2010
- Penalty
- Initial $550 · Current $550
Recent events (2)
- — L (O) $550.00
- — Z (O) $550.00
618038301
- Issued
- May 25, 2010
- Abate by
- May 28, 2010
- Penalty
- Initial $550 · Current $550
Recent events (2)
- — L (O) $550.00
- — Z (O) $550.00
More inspections at Obayashi/Psm JV
View Obayashi/Psm JV's full OSHA safety record →
More inspections in this industry (NAICS 237310)
More inspections in NV
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 313970378.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.