LINDEN, NJ —
OSHA Inspection: INFINEUM USA L.P.
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of INFINEUM USA L.P. in PARK & BRUNSWICK AVE, LINDEN, NJ 07036 (NAICS 325998). OSHA activity number 313977845.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- INFINEUM USA L.P.
- Site address
- PARK & BRUNSWICK AVE
- City
- LINDEN
- State
- NJ
- ZIP
- 07036
- Mailing
- P.O. BOX 23, LINDEN, NJ 07036
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325998
- SIC code (legacy)
- 2899
- Employees
- 262
- Ownership type
- A
Citations
23 citations on file for this inspection.
5(a)(1)
- Issued
- May 21, 2010
- Abate by
- Aug 31, 2010
- Penalty
- Initial $4,500 · Current $4,500
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fire and explosion hazards: a- Bayway Chemical Plant, Lofi Unit - A 3/4 inch block valve on the inlet of the 7E20 (7R20 P/A Heater) safety valve was not included on P&ID 12566-66BA-1TC Sheet 1 of 1 Revision Number 15. On 01/21/10 workers failed to lock out the above noted block valve resulting in a mechanic being splashed with heated product from the 7R20 Lofi Reactor while removing the safety valve. Feasible and acceptable methods among others to correct these hazards include: Update the above noted P&ID and ensure that all P&IDs on non-PSM covered units are accurate and include all process equipment as per CCPS Guidelines for Process Safety Documentation, Section 5.2.2. b- Bayway Chemical Plant, Calcium Phenate Unit - Block valves on the inlet lines to safety valves for the 10D8 Lower Layer Solvent Drum, 10D9 Upper Layer Solvent Drum and 10D10 Upper Layer Solvent Drum were not car-sealed in their open positions. Condition noted on or about 12/02/10. Feasible and acceptable methods among others to correct these hazards include: On non-PSM covered units provide adequate controls to ensure that intervening valves on the upstream or downstream lines to/from relief devices remained in the open position during pressure vessel operation as per ASME Boiler and Pressure Vessel Code, Division 1 (BPVC), Section VIII, UG-135(d). c- Bayway Chemical Plant, Polybutene Mechanical Shop and LM Finishing Building - Workers were exposed to blast injuries from flying projectiles (glass windows and corrugated metal/fiberglass walls) as a result of exposure to vapor cloud explosions and associated overpressures of 1-3 psi. Condition noted on or about 02/19/10. Feasible and acceptable methods among others to correct these hazards include such as but not limited to complying with API 752 Management of Hazards Associated with Location of Process Plant Buildings: Perform mitigation measures found in API 752 Section 3.3.7.2 to include relocating personnel, eliminating/modifying windows, strengthening doorways, installing external walls for explosion/projectile protection and/or constructing new explosion-resistant structures.esistant
Recent events (3)
- — P (S) $4500.00
- — I (S) $4500.00
- — Z (S) $4500.00
1910.27 C04
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $1,875 · Current $1,875
General-duty citation text
29 CFR 1910.27(c)(4): The distance from the centerline of rungs, cleats, or steps to the nearest permanent object in back of the ladder was not at least seven inches: a- Bayway Chemical Plant, 6E5s, Vis- J Unit - Employees were exposed to fall hazards of 33 feet while using a fixed metal ladder which had a conduit within 4 inches of a rung. Condition noted on or about 12/01/10. b- Bayway Chemical Plant, 8E13, Dispersants Unit - Employees were exposed to fall hazards of 6 feet 9 inches while using a fixed metal ladder which had a conduit within 3 inches of a rung. Condition noted on or about 01/13/10.
Recent events (2)
- — I (S) $1875.00
- — Z (S) $1875.00
1910.27 D02
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $1,875
General-duty citation text
29 CFR 1910.27(d)(2): Fixed ladder(s), used to ascend to heights exceeding 20 feet and provided with cages or wells were not provided with a landing platform for each 30 feet of height or fraction thereof: a- Bayway Chemical Plant, 6E5s, Vis-J Unit - Operators making rounds and mechanics performing preventive maintenance were exposed to fall hazards of 33 feet while using a fixed metal ladder which was not provided with a rest platform. Condition noted on or about 12/01/09.
Recent events (2)
- — I (S)
- — Z (S) $1875.00
1910.36 H01
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $1,875 · Current $1,875
Recent events (2)
- — I (S) $1875.00
- — Z (S) $1875.00
1910.119 D03 IB
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $4,500
Recent events (2)
- — I (S)
- — Z (S) $4500.00
1910.119 D03 II
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $4,500 · Current $4,500
Recent events (2)
- — I (S) $4500.00
- — Z (S) $4500.00
1910.119 E03 V
- Issued
- May 21, 2010
- Abate by
- Aug 31, 2010
- Penalty
- Initial $4,500 · Current $4,500
Recent events (3)
- — P (S) $4500.00
- — I (S) $4500.00
- — Z (S) $4500.00
1910.119 E03 VI
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
Recent events (2)
- — I (S)
- — Z (S)
1910.119 E05
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $4,500 · Current $4,500
Recent events (2)
- — I (S) $4500.00
- — Z (S) $4500.00
1910.119 F01
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $4,500
General-duty citation text
29 CFR 1910.119(f)(1): The employer did not develop and implement written procedures that provided clear instructions for safely conducting activities in each covered process consistent with the process safety information: a- Bayway Chemical Plant, Main Control Room - There was no written procedures covering the necessary actions required if hydrocarbon or toxic gas was detected in the HVAC system and/or entered into the control room. Condition noted on or about 12/23/09. b- Bayway Chemical Plant, Vis-J and Dispersants Units - Written operating procedures to include normal start up/turnaround start up in the case of continuous processes or start up after turnaround in the case of batch processes did not include the requirement to remove all non-essential personnel from process unit prior to initiating such procedures as referenced in CCPS Guidelines for Safe Process Operations and Maintenance. Condition noted on or about 01/12/10. c- Bayway Chemical Plant, Zinc Unit - The P2S5 Bin Transporting, Inverting and Charging Procedure did not specifically indicate that only one bin is to be inverted at a time. Workers routinely functioned both inverters (9INV1 and 9INV2) simultaneously which have resulted in improper clamping with a bin slipping from the inverter and spilling product. During the event workers were exposed to H2S when the P2S5 contacted water. Condition noted on or about 12/02/10.
Recent events (2)
- — I (S)
- — Z (S) $4500.00
1910.119 F04
- Issued
- May 21, 2010
- Abate by
- Aug 1, 2010
- Penalty
- Initial $4,500 · Current $4,500
General-duty citation text
29 CFR 1910.119(f)(4): The employer did not implement safe work practices for employees and contractor employees to provide for the control of hazards during operations such as lockout/tagout; confined space entry; opening process equipment or piping; and control over entrance into a facility by maintenance, contractor, laboratory, or other support personnel: a- Bayway Chemical Plant, Dispersants and Vis-J Units - The employer failed to implement General Safety Rule 1.9 Process Operation (Visitors Sign-In Procedures) to account for workers on process units. Both Infineum and contract employees failed to sign in/out at the Main Control Room and Polybutene Control House. Condition noted on or about 01/27/10.
Recent events (3)
- — P (S) $4500.00
- — I (S) $4500.00
- — Z (S) $4500.00
1910.119 J02
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $4,500 · Current $4,500
Recent events (2)
- — I (S) $4500.00
- — Z (S) $4500.00
1910.119 J04 I
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $4,500 · Current $4,500
Recent events (2)
- — I (S) $4500.00
- — Z (S) $4500.00
1910.119 J04 II
- Issued
- May 21, 2010
- Abate by
- Jul 21, 2010
- Penalty
- Initial $4,500 · Current $4,500
Recent events (2)
- — I (S) $4500.00
- — Z (S) $4500.00
1910.119 J04 III
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $4,500 · Current $4,500
Recent events (2)
- — I (S) $4500.00
- — Z (S) $4500.00
1910.119 J05
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $4,500 · Current $3,000 Reduced
General-duty citation text
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (as defined by the process safety information in 29 CFR 1910.119(d)) before use or in a safe and timely manner: a- Bayway Chemical Plant, Outside Compressor Room, Vis-J Unit - Excess vibration was observed on the 6 inch ammonia header from the C3 Ammonia Compressor high pressure side to SV4659. Condition noted on or about 12/01/09. b- Bayway Chemical Plant, Finishing Section, Vis-J Unit - The 6P13A, bottoms pump for 6T1 was observed in operation with a non functioning pressure gauge. Condition noted on or about 12/01/09. c- Bayway Chemical Plant, Second Deck 6Es, Vis-J Unit - An inoperative pressure gauge was observed for the Ammonium Hydroxide to overhead system. Condition noted on or about 12/01/09. d- Bayway Chemical Plant, POA Unit - Tell tale pressure gauges for RDs on P16A/B were inoperative. Condition noted on or about 12/01/09. e- Bayway Chemical Plant, Ground Floor Reactor Building, Dispersants Unit - A 3 inch hot oil line for the 8R4 jacket was observed with visible vibration and movement. Condition noted on or about 01/13/10. f- Bayway Chemical Plant, 3rd Floor Mezzanine Reactor Building, Dispersants Unit - A pressure gauge for the 8R1X was inoperative. Condition noted on or about 01/13/10.
Recent events (2)
- — I (S) $3000.00
- — Z (S) $4500.00
1910.119 L01
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $4,500
General-duty citation text
29 CFR 1910.119(l)(1): The employer did not establish and implement written procedures to manage changes to process chemicals, technology, equipment, and procedures; and, changes to facilities that affect a covered process: a- Bayway Chemical Plant, Dispersants Unit - An MOC was not written to allow fire hydrant water to be used for the 8J22 Scrubber until jets could be unplugged and finer mesh screen installed in the strainer. Condition noted on or about 01/27/10 and 02/09/10. b- Bayway Chemical Plant, Piping Loop LMAM01004-09, Vis-J Unit - An MOC was not written when TML 19 (19.01-19.06) on a 4 inch elbow were changed to an adjacent elbow due to difficulty in accessing the TML. Condition noted on or about 12/22/09.
Recent events (2)
- — I (S)
- — Z (S) $4500.00
1910.119 M05
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $4,500 · Current $4,500
Recent events (2)
- — I (S) $4500.00
- — Z (S) $4500.00
1910.119 M06
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $4,500 · Current $3,000 Reduced
General-duty citation text
29 CFR 1910.119(m)(6): The incident investigation report was not reviewed with all affected personnel, including contract employees whose job tasks are relevant to the incident findings: a- Bayway Chemical Plant, Reactor Building, Dispersants Unit - On 07/07/10, maintenance employees were in the process of replacing the 8D13 bottom valve when they were exposed to a release of overhead vapor containing Chlorine, Hydrochloric Acid and Maleic Anhydride from 8R3. An incident investigation was performed and completed on 09/15/09 but was never reviewed with affected employees. Condition noted on or about 11/24/09.
Recent events (2)
- — I (S) $3000.00
- — Z (S) $4500.00
1910.119 O01
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $4,500 · Current $3,000 Reduced
General-duty citation text
29 CFR 1910.119(o)(1): The employer did not certify that they had evaluated compliance with the provisions of 29 CFR 1910.119 at least every three years to verify that the procedures and practices developed under this standard were adequate and were being followed: a- Bayway Chemical Plant, Dispersants, Zinc, POA and Vis-J Units - The Infineum 2007 TCPA/OSHA PSM Management System Documentation and Self Assessment Plan did not include a review of pressure vessel inspection records. Condition noted on or about 11/30/09. b- Bayway Chemical Plant, Dispersants, Zinc, POA and Vis-J Units - Infineum relies on Eii, Inc. to provide subcontractors to work at the facility. Eii also obtains and evaluates subcontractor safety and health performance and programs prior to them working at Infineum. However, the Infineum 2007 TCPA/OSHA PSM Management System Documentation and Self Assessment Plan did not include a review Eii's procedure to evaluate subcontractor safety and health performance along with an inspection of respective subcontracor records. Condition noted on or about 12/16/09.
Recent events (2)
- — I (S) $3000.00
- — Z (S) $4500.00
1910.134 K01 III
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $1,875 · Current $1,875
Recent events (2)
- — I (S) $1875.00
- — Z (S) $1875.00
1910.147 D
- Issued
- May 21, 2010
- Abate by
- Jul 2, 2010
- Penalty
- Initial $4,500
General-duty citation text
29 CFR 1910.147(d): The established procedure for the application of energy cotnrol (the energy control procedure) was not done in sequence and it did not contain the elements as required by 29 CFR 1910.147(D)(1) through (d)(6): a- Bayway Chemical Plant, Lofi Unit - On 01/25/10 a mechanic was sprayed with heated product from the 7R20 Lofi Reactor while removing the 7E20 P/A Heater safety valve (7E20SV). Mechanics and the process operator failed to properly isolate the 7E20SV in that the 7P20 Recyle P/O Pump for 7R20 was operating and in line with the 7E20/7E20SV. In addition, a 3/4 inch block valve on the inlet to 7E20SV was not indicated on the P&ID and was not locked out.ed
Recent events (2)
- — I (S)
- — Z (S) $4500.00
1910.212 A04
- Issued
- May 21, 2010
- Abate by
- Sep 16, 2010
- Penalty
- Initial $4,500 · Current $4,500
Recent events (3)
- — P (S) $4500.00
- — I (S) $4500.00
- — Z (S) $4500.00
More inspections in this industry (NAICS 325998)
More inspections in NJ
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 313977845.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.