Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: STOCKMAN FORD MERCURY

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of STOCKMAN FORD MERCURY in 202 FIRST AVENUE EAST, WILLISTON, ND 58801 (NAICS 441110). OSHA activity number 314001728.

Watch Stockman Ford Mercury — free Get an email when a new federal OSHA severe-injury report for Stockman Ford Mercury is published. One employer, no account, unsubscribe in one click.
Site address
202 FIRST AVENUE EAST
City
WILLISTON
State
ND
ZIP
58801
Mailing
P.O. BOX 1058, WILLISTON, ND 58802
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
441110
SIC code (legacy)
5511
Employees
22
Ownership type
A

1 citation on file for this inspection.

5(a)(1)

Serious Gravity 10 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $1500.00 · Current $750.00 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to:
(a)  For the employees exposed to a crushing hazard on the Bendpak
automotive lift that
was lifting a vehicle chassis with three arms that were not properly
secured, located in
the shop area at 202 First Avenue East, Williston, ND.
(b)  For the employees exposed to crushing hazards on a Challenger lift
that was not
properly secured with four mounting bolts on the internal flanges located
in the shop area
at 202 First Avenue East, Williston, ND.
Abatement Note:
Among other methods, one feasible and acceptable method would follow the
requirements
of ANSI/ALI ALOIM and/or ANSI B153.1 which include, among other
requirements,
the following:
1.  Proper installation and mounting in accordance with manufacturers
specifications.
2.  Operator training on proper lift usage in accordance with
manufacturers specifications
3.  Institute a preventative maintenance program according to manufacturers
specifications.
4.  Schedule and complete all periodic inspections.
Abatement Note:  Abatement certification and documentation are required
for this item (see
enclosed "Sample Abatement Certification Letter").tion
Recent events (2)
  • — I (S) $750.00
  • — Z (S) $1500.00

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314001728.