Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PERFECTION SPRING & STAMPING CORP.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PERFECTION SPRING & STAMPING CORP. in 1449 E. ALGONQUIN ROAD, MT. PROSPECT, IL 60056 (NAICS 332116). OSHA activity number 314013830.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Perfection Spring & Stamping Corp. — free Get an email when a new federal OSHA severe-injury report for Perfection Spring & Stamping Corp. is published. One employer, no account, unsubscribe in one click.
Site address
1449 E. ALGONQUIN ROAD
City
MT. PROSPECT
State
IL
ZIP
60056
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332116
SIC code (legacy)
3469
Employees
80
Ownership type
A

8 citations on file for this inspection.

5(a)(1)

Serious Gravity 03 1 instance 5 exposed
Issued
Mar 5, 2010
Abate by
Mar 31, 2010
Penalty
Initial $875 · Current $435 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards
that were causing or likely to cause death or serious physical harm to
employees in that
employees were exposed to an amputation hazard from the rotating/moving
blade:
a) Tool Room Area - Provision was not made to prevent the Johnson
horizontal metal cutting
band saw model #J, serial #H17620, from automatically restarting upon
restoration of power
after a power source failure.
Among others methods, one feasible and acceptable means of abatement in an
event of
interruption in the electrical supply to the saw would be to provide an
electrical device that is
designed to prevent the saw from restarting automatically when power is
restored,
such as a
magnetic restart or similar device as prescribed by the American National
Standard Institute
for Metal Sawing Machines, ANSI B11.10-2003, Section 6.11.
In accordance with 29 CFR 1903.19(d), abatement certification is required
for this
violation (using the CERTIFICATION OF ACTION WORKSHEET), and in addition,
documentation demonstrating that abatement is complete must be included
with your
certification.  This documentation may include, but is not limited to,
evidence of the
purchase or repair of the equipment, photographic or video evidence of
abatement, or
other written records.
Recent events (2)
  • — I (S) $435.00
  • — Z (S) $875.00

1910.23 C01

Serious Gravity 02 2 instances 20 exposed
Issued
Mar 5, 2010
Abate by
Mar 31, 2010
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • — I (S) $350.00
  • — Z (S) $700.00

1910.36 D01

Serious Gravity 02 1 instance 80 exposed
Issued
Mar 5, 2010
Abate by
Mar 31, 2010
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • — I (S) $350.00
  • — Z (S) $700.00

1910.179 G01 V

Serious Gravity 02 1 instance 5 exposed
Issued
Mar 5, 2010
Abate by
Mar 31, 2010
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • — I (S) $350.00
  • — Z (S) $700.00

1910.212 A01

Serious Gravity 03 1 instance 10 exposed
Issued
Mar 5, 2010
Abate by
Mar 31, 2010
Penalty
Initial $875 · Current $435 Reduced
Recent events (2)
  • — I (S) $435.00
  • — Z (S) $875.00

1910.305 J01 II

Serious Gravity 02 1 instance 10 exposed
Issued
Mar 5, 2010
Abate by
Mar 10, 2010
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • — I (S) $350.00
  • — Z (S) $700.00

1910.334 A02 I

Serious Gravity 01 1 instance 10 exposed
Issued
Mar 5, 2010
Abate by
Mar 24, 2010
Penalty
Initial $525 · Current $265 Reduced
Recent events (2)
  • — I (S) $265.00
  • — Z (S) $525.00

1910.22 D01

Other-than-serious Gravity 01 2 instances 3 exposed
Issued
Mar 5, 2010
Abate by
Mar 31, 2010

View Perfection Spring & Stamping Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314013830.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.