Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: FASTER CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of FASTER CONSTRUCTION in 1012 BRIDLEWOOD FARMS, RIDGEVILLE, SC 29472 (NAICS 238130). OSHA activity number 314080649.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Faster Construction — free Get an email when a new federal OSHA severe-injury report for Faster Construction is published. One employer, no account, unsubscribe in one click.
Establishment
FASTER CONSTRUCTION
Site address
1012 BRIDLEWOOD FARMS
City
RIDGEVILLE
State
SC
ZIP
29472
Mailing
206 BAILEY DR, SUMMERVILLE, SC 29483
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
SIC code (legacy)
1761
Employees
3
Ownership type
A
Industry flags
Construction safety.

1 citation on file for this inspection.

1926.501 B01

Serious Gravity 02 2 instances 2 exposed
Issued
Apr 7, 2010
Abate by
Apr 12, 2010
Penalty
Initial $100 · Current $100

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314080649.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.