Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: EXPRESS ENERGY SERVICE

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of EXPRESS ENERGY SERVICE in DETWEILER 4 H RIG 5, MANSFIELD, PA 16933 (NAICS 213112). OSHA activity number 314155656.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Express Energy Service — free Get an email when a new federal OSHA severe-injury report for Express Energy Service is published. One employer, no account, unsubscribe in one click.
Site address
DETWEILER 4 H RIG 5
City
MANSFIELD
State
PA
ZIP
16933
Mailing
776 SEAGERS STATION ROAD, MONTGOMERY, PA 17725
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
213112
SIC code (legacy)
1389
Employees
3
Ownership type
A

1 citation on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 1 exposed
Issued
Jun 14, 2010
Abate by
Jun 21, 2010
Penalty
Initial $3,000 · Current $2,000 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not
furnish employment and a place of employment which were free from
recognized hazards
that were causing or likely to cause death or serious physical harm to
employees in that
employees were exposed to the hazard of falls from elevations and thermal
burns:
a) Express Energy/Detweiler/rig # 5, Dimock, PA. The employer did not
ensure that an
employee working from a guardrailed platform of Rig#5 approx 30 ft above
the ground, was
provided with a ready and convenient means of escape, in the event of a
well blow-out.
The Geronimo Line was attached to the side of the rig mast at or near the
rear of the
platform and was not easily accessible to the employee, as observed, on or
about April 20,
2010.
ABATEMENT NOTE: One feasible and acceptable method to abate this hazard is
to install
the Geronimo line in accordance with American Petroleum Institute (API) RP
54 Section
6.10.1 Auxiliary Escape and the Geronimo Manufacturer's Operating manual.
ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $2000.00
  • — Z (S) $3000.00

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314155656.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.