TAYLOR, PA ·
OSHA Inspection: SNF HOLDING CO
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of SNF HOLDING CO in 10 STAUFFER INDUSTRIAL PARK, TAYLOR, PA 18517 (NAICS 325188). OSHA activity number 314158114.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SNF HOLDING CO
- Site address
- 10 STAUFFER INDUSTRIAL PARK
- City
- TAYLOR
- State
- PA
- ZIP
- 18517
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325188
- SIC code (legacy)
- 2819
- Employees
- 9
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.119 D03 IB
- Issued
- Dec 27, 2010
- Abate by
- Jan 31, 2011
- Penalty
- Initial $1,125 · Current $844 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): Process safety information pertaining to the equipment in the process did not include the piping and instrument diagrams (P&ID'S): (a) A current P&ID was not available for the dimethylamine tank piping system in that the selector valve for the pressure relief system was not represented, on or about December 1, 2010. ABATEMENT CERTIFICATION REQUIREDATION
Recent events (2)
- · I (S) $844.00
- · Z (S) $1125.00
1910.119 E01
- Issued
- Dec 27, 2010
- Abate by
- Apr 29, 2011
- Penalty
- Initial $1,875 · Current $1,406 Reduced
General-duty citation text
29 CFR 1910.119(e)(1): The process hazard analysis did not identify, evaluate, and address the control of the hazards involved in the process: (a) The process hazard analysis did not identify, evaluate or control the hazard of flammable premix being transferred through a pipe which contained a valve in an area which was not considered a hazardous (classified) location, on or about December 1, 2010. (b) The process hazard analysis did not identify, evaluate or control the hazard of removing one pressure relief device from the dimethylamine tank and not controlling the position of the selector valve which leads to the pressure relief devices, on or about October 20, 2010. ABATEMENT CERTIFICATION REQUIREDATION
Recent events (2)
- · I (S) $1406.00
- · Z (S) $1875.00
1910.119 F01 IC
- Issued
- Dec 27, 2010
- Abate by
- Jan 31, 2011
- Penalty
- Initial $1,500 · Current $1,125 Reduced
General-duty citation text
29 CFR 1910.119(f)(1)(i)(C): The employer's written operating procedures covering the steps for each operating phase did not address temporary operations: (a) A temporary operating procedure to address the selector valve on the DMA tank when one pressure relief device was removed was not included in the written operating procedures, on or about December 1, 2010. ABATEMENT CERTIFICATION REQUIREDATION
Recent events (2)
- · I (S) $1125.00
- · Z (S) $1500.00
More inspections in this industry (NAICS 325188)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314158114.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.