OSHA Inspection: HALO ENERGY LLC

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of HALO ENERGY LLC in RIG #112 CR 3108, SELMAN CITY, TX 75689 (NAICS 213112). OSHA activity number 314176249.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Halo Energy LLC — free Get an email when a new federal OSHA severe-injury report for Halo Energy LLC is published. One employer, no account, unsubscribe in one click.
Establishment
HALO ENERGY LLC
Site address
RIG #112 CR 3108
City
SELMAN CITY
State
TX
ZIP
75689
Mailing
1709 INDUSTRIAL BLVD, KILGORE, TX 75662
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
213112
SIC code (legacy)
1389
Employees
8
Ownership type
A
Industry flags
Manufacturing safety.

4 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 1 exposed
Issued
Oct 21, 2010
Abate by
Oct 29, 2010
Penalty
Initial $2,100 · Current $1,470 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not
furnish employment and a place of employment which were free from
recognized hazards
that were causing or likely to cause death or serious physical harm to
employees working
from elevated heights of oil-well service rig derrick:
On or about May 4, 2010 and times prior to, at HALO Energy Rig #112, an
employee
worked from the tubing board where an emergency escape device was not
installed and
available for use. The employee working from the tubing board was exposed
to a potential
fall or severe burns associated with, and in the event of a fire or
explosion at the oil-well
service rig platform.
One feasible and acceptable abatement method to correct this hazard would
be to ensure that
an auxiliary means of escape is installed and ready for use prior to
personnel working in the
derrick in accordance with Recommended Practice for Occupational Safety
for
Oil and Gas
Well Drilling and Servicing Operations- API 54, Third Edition, August
1999, Section
6.10.1, Auxiliary Escape: "On all land rigs, the derrick or mast shall
have an auxiliary
means of escape installed prior to personnel working in the derrick. The
auxiliary escape
route should use a specially rigged and securely anchored escape line
attached to the derrick
or mast so as to provide a ready and convenient means of escape from the
derrickman's
working platform."'s
Recent events (2)
  • — I (S) $1470.00
  • — Z (S) $2100.00

5(a)(1)

Serious Gravity 10 1 instance 3 exposed
Issued
Oct 21, 2010
Abate by
Oct 29, 2010
Penalty
Initial $2,100 · Current $1,470 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not
furnish employment and a place of employment which were free from
recognized hazards
that were causing or likely to cause death or serious physical harm to
employees exposed to
struck by and crushing hazards:
On or about May 4, 2010 and times prior to, at HALO Energy Rig #112,
employees
working at rig #112, were exposed to potential struck by and crushing
hazards associated
with the possible collapse of the derrick due to the continued use of a
traveling block running
wire-rope line rubbing against and compromising a critical spreader-arm of
the derrick
locking-pins.
Among other methods, feasible and acceptable means to correct this hazard
are:
1.Ensure the Rig Operator inspects the rigging involved each time the
derrick is
erected and does not initiate rig operations until questionable critical
components are secured and not compromised.
2.Ensure the Rig Operator visually inspects and corrects the routing of the
derricks running wire-rope line and does not continue rig operations when
the
integrity of the derrick locking area components are compromised in
accordance with:  API Recommended Practice 54, Third Edition, August
1999., Subsection 6.3.2,: Well operations involving the rig shall not be
commenced until the rig is rigged up in a safe manner.
Recent events (2)
  • — I (S) $1470.00
  • — Z (S) $2100.00

1910.23 C01

Serious Gravity 10 1 instance 1 exposed
Issued
Oct 21, 2010
Abate by
Oct 29, 2010
Penalty
Initial $2,100 · Current $1,470 Reduced
Recent events (2)
  • — I (S) $1470.00
  • — Z (S) $2100.00

1910.27 D05

Serious Gravity 10 1 instance 1 exposed
Issued
Oct 21, 2010
Abate by
Oct 29, 2010
Penalty
Initial $2,100 · Current $1,470 Reduced
Recent events (2)
  • — I (S) $1470.00
  • — Z (S) $2100.00

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314176249.