WILMINGTON, NC —
OSHA Inspection: FENNER,INC., DBA FENNER DRIVES
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of FENNER,INC., DBA FENNER DRIVES in 3100 CORPORATE DRIVE, WILMINGTON, NC 28405 (NAICS 333613). OSHA activity number 314378795.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FENNER,INC., DBA FENNER DRIVES
- Site address
- 3100 CORPORATE DRIVE
- City
- WILMINGTON
- State
- NC
- ZIP
- 28405
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 333613
- SIC code (legacy)
- 3568
- Employees
- 33
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
21 citations on file for this inspection.
95012901
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
- Penalty
- Initial $3,500 · Current $3,500
General-duty citation text
North Carolina General Statute 95-129(1) of the Occupational Safety and Health Act of North Carolina: The employer did not furnish each of his employees conditions of employment and a place of employment free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to caught in or crush by hazard. a)facility, production area - employees(s) were allowed to operate a Chicago power press brake, serial # l16179(WRF), that was not equipped with an emergency stop control. ABATEMENT NOTE: 1)Among other methods, one feasible and acceptable abatement method to correct these hazards is to install an Emergency Stop Control on the Chicago machine power press. REFERENCE: ANSI B11.3-1982, page 47, paragraph 4.4.4.2.1 Emergency Stop Control:y
Recent events (2)
- — F (S) $3500.00
- — Z (S) $3500.00
1910.132 F01 V
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
- Penalty
- Initial $5,600 · Current $5,600
Recent events (2)
- — F (S) $5600.00
- — Z (S) $5600.00
1910.147 C04 I
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
- Penalty
- Initial $5,600 · Current $5,600
Recent events (2)
- — F (S) $5600.00
- — Z (S) $5600.00
1910.147 C04 IIB
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
Recent events (2)
- — F (S)
- — Z (S)
1910.147 C04 IIC
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
Recent events (2)
- — F (S)
- — Z (S)
1910.147 C05 I
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
- Penalty
- Initial $3,500 · Current $3,500
Recent events (2)
- — F (S) $3500.00
- — Z (S) $3500.00
1910.147 C05 II
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
Recent events (2)
- — F (S)
- — Z (S)
1910.147 C06 I
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
- Penalty
- Initial $3,500
Recent events (2)
- — F (S)
- — Z (S) $3500.00
1910.147 C07 I
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
- Penalty
- Initial $5,600
Recent events (2)
- — F (S)
- — Z (S) $5600.00
1910.176 A
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
- Penalty
- Initial $3,500 · Current $3,500
Recent events (2)
- — F (S) $3500.00
- — Z (S) $3500.00
1910.178 L03 IIA
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
- Penalty
- Initial $5,600
Recent events (2)
- — F (S)
- — Z (S) $5600.00
1910.179 J02 III
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
- Penalty
- Initial $3,500
Recent events (2)
- — F (O)
- — Z (S) $3500.00
1910.179 N03 X
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
- Penalty
- Initial $600
Recent events (2)
- — F (O)
- — Z (S) $600.00
1910.212 A01
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
- Penalty
- Initial $5,600 · Current $5,600
Recent events (2)
- — F (S) $5600.00
- — Z (S) $5600.00
1910.212 A03 II
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
Recent events (2)
- — F (S)
- — Z (S)
1910.219 D01
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
- Penalty
- Initial $3,500
Recent events (2)
- — F (S)
- — Z (S) $3500.00
1910.242 A
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
- Penalty
- Initial $5,600
Recent events (2)
- — F (O)
- — Z (S) $5600.00
1910.215 B09
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
Recent events (2)
- — F (O)
- — Z (O)
1910.242 B
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
Recent events (2)
- — F (O)
- — Z (O)
1910.253 B04 III
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
Recent events (2)
- — F (O)
- — Z (O)
1910.305 G01 IV
- Issued
- Jun 10, 2011
- Abate by
- Jun 15, 2011
Recent events (2)
- — F (O)
- — Z (O)
More inspections at Fenner,Inc., DBA Fenner Drives
View Fenner,Inc., DBA Fenner Drives's full OSHA safety record →
More inspections in this industry (NAICS 333613)
More inspections in NC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314378795.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.