OSHA Inspection: MITSUBISHI POLYCRYSTALLINE SILICON AMERICA CORP.

Accident-driven inspection · Safety discipline

On , OSHA opened an accident-driven safety inspection of MITSUBISHI POLYCRYSTALLINE SILICON AMERICA CORP. in 7800 MITSUBISHI LN., THEODORE, AL 36582 (NAICS 325998). OSHA activity number 314427378.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Mitsubishi Polycrystalline Silicon America Corp. — free Get an email when a new federal OSHA severe-injury report for Mitsubishi Polycrystalline Silicon America Corp. is published. One employer, no account, unsubscribe in one click.
Site address
7800 MITSUBISHI LN.
City
THEODORE
State
AL
ZIP
36582
Inspection type
Accident-driven (A)
Scope
Complete (A)
Discipline
Safety
Advance notice
Yes
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325998
SIC code (legacy)
2899
Employees
150
Ownership type
A

5 citations on file for this inspection.

1910.119 F03

Serious Gravity 10 3 instances 7 exposed
Issued
Nov 4, 2010
Abate by
Nov 30, 2010
Penalty
Initial $4,900 · Current $4,900
29 CFR 1910.119(f)(3):  The operating procedures were not reviewed as
often as necessary to
assure that they reflect current operating practice, including changes
that result from changes in
process chemicals, technology, and equipment, or changes to facilities:
a)In the reduction area: On or about June 7, 2010 and at times prior the
employer
allowed employees to deviate from the operating procedures for Reactor
Assembly (WIR112) in that operators would install the CVD reactor chamber
on
the base and insert and hand tighten 6 to 8 bolts instead of following the
procedure that required all reactor chamber flange bolts to be installed
and
tightened prior to starting the Reactor Drying step.
b)In the reduction area: On or about June 7, 2010 and at times prior the
employer
allowed employees to deviate from the operating procedures for Reactor
Assembly (WIR112) in that operators would install the CVD reactor chamber
on
the base and insert and hand tighten 6 to 8 bolts instead of following the
procedure that required all reactor chamber flange bolts to be installed
and
tightened prior
to removing their required flame retardant clothing and respirators.
c)In the reduction area: On or about June 7, 2010 and at times prior the
employer
allowed employees to deviate from the operating procedures for Reactor
Drying
and Leak Check (WIR120) in that this step was started before the reactor
chamber
was securely bolted (all bolts installed and tightened) to the base and
all hoses
were connected.
Recent events (2)
  • — J (S) $4900.00
  • — Z (S) $4900.00

1910.119 L05

Serious Gravity 10 1 instance 7 exposed
Issued
Nov 4, 2010
Abate by
Nov 30, 2010
29 CFR 1910.119(l)(5):  A change covered by 29 CFR 1910.119(l) resulted in
a change in the
operating procedures or practices required by 29 CFR 1910.119(f), and such
procedures or
practices were not updated:
a)In the Reduction area: On or about June 7, 2010 and at times prior the
employer
changed the operating procedure for Reactor Assembly (WIR112) from
installing
all CVD reactor flange bolts and tightening and connecting all hoses to
installing
6 to 8 bolts and hand tightening then starting the drying and leak check
procedure
(WIR120) and did not update the written operating procedure.
Recent events (2)
  • — J (S)
  • — Z (S)

1910.132 A

Serious Gravity 10 1 instance 7 exposed
Issued
Nov 4, 2010
Abate by
Nov 30, 2010
Recent events (2)
  • — J (S)
  • — Z (S)

1910.132 A

Deleted Serious Gravity 10 1 instance 6 exposed
Issued
Nov 4, 2010
Abate by
Nov 12, 2010
Penalty
Initial $3,500
29 CFR 1910.132(a): Personal protective equipment was not used when
necessary whenever
hazards capable of causing injury or impairment were encountered:
a)In the Reduction area: on or about June 7, 2010 and at times prior the
employer
did not require personal protective equipment during the entire reactor
assembly
process as specified by the operating procedure.
Recent events (2)
  • — J (S)
  • — Z (S) $3500.00

1910.147 C06 II

Other-than-serious Gravity 01 1 instance 6 exposed
Issued
Nov 4, 2010
Abate by
Nov 30, 2010
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic
inspections of the energy
control procedures had been performed:
a)Throughout plant: on or about June 8, 2010 and at times prior employees
performing lockout on the CVD reactors were audited but the the audit was
not
certified by the employer.
Recent events (2)
  • — J (O)
  • — Z (O)

View Mitsubishi Polycrystalline Silicon America Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314427378.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.