WALTHAM, MA —
OSHA Inspection: TECOGEN INC.
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of TECOGEN INC. in 45 FIRST AVE., WALTHAM, MA 02451 (NAICS 335312). OSHA activity number 314731811.
Where did this inspection happen?
- Establishment
- TECOGEN INC.
- Site address
- 45 FIRST AVE.
- City
- WALTHAM
- State
- MA
- ZIP
- 02451
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 335312
- SIC code (legacy)
- 3621
- Employees
- 25
- Ownership type
- A
Citations
4 citations on file for this inspection.
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $1250.00 · Current $875.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were potentially exposed to crushing hazards from a loss of load while operating an under hung crane that was not subject to regular inspection: (a) Location - Chiller Lab: On or about July 27, 2010, the Aceco model D-2510 10 ton underhung crane was not subject to regular inspections. Among other methods, one feasible and acceptable method to correct this hazard is to establish and implement a program of frequent and periodic inspections in accordance with the requirements of the most applicable version of ASME B30.11-2004, American Society of Mechanical Engineers Safety Standard, Monorails and Underhung Cranes.
Recent events (2)
- — I (S) $875.00
- — Z (S) $1250.00
1910.178 A04
- Issued
- Abate by
- Penalty
- Initial $1250.00 · Current $875.00 Reduced
Recent events (2)
- — I (S) $875.00
- — Z (S) $1250.00
1910.178 L01 I
- Issued
- Abate by
- Penalty
- Initial $1250.00 · Current $875.00 Reduced
Recent events (2)
- — I (S) $875.00
- — Z (S) $1250.00
1910.178 Q01
- Issued
- Abate by
- Penalty
- Initial $1250.00 · Current $875.00 Reduced
Recent events (2)
- — I (S) $875.00
- — Z (S) $1250.00
More inspections at TECOGEN INC.
MANCHESTER, NH—2025-01-08
TECOGEN INC
View TECOGEN INC.'s full OSHA safety record →
More inspections in this industry (NAICS 335312)
COLUMBUS, IN—2026-06-18
CUMMINS CMEP
LONGMONT, CO—2026-06-15
STORED ENERGY SYSTEMS
THOMASTON, CT—2026-04-02
FAIRBANKS MORSE DEFENSE
SAN JUAN, PR—2026-03-17
RK POWER GENERATOR CORP
MUSKEGO, WI—2026-03-12
MTI MOTION, LLC
More inspections in MA
WORCESTER, MA—2026-07-10
QUINSIGAMOND COMMUNITY COLLEGE
FITCHBURG, MA—2026-07-10
KELLEY WOOD PRODUCTS, INC.
EVERETT, MA—2026-07-10
HORIZON RETAIL CONSTRUCTION INC
NORTON, MA—2026-07-09
DYNAMIC RESIDENTIAL ROOF MARKETING, LLC
NORTON, MA—2026-07-09
LM GENERAL CONSTRUCTION INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314731811.