COTTON VALLEY, LA —
OSHA Inspection: CALUMET LUBRICANTS CO., L.P.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CALUMET LUBRICANTS CO., L.P. in 1756 OLD HIGHWAY 7, COTTON VALLEY, LA 71018 (NAICS 324110). OSHA activity number 314767104.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CALUMET LUBRICANTS CO., L.P.
- Site address
- 1756 OLD HIGHWAY 7
- City
- COTTON VALLEY
- State
- LA
- ZIP
- 71018
- Mailing
- P. O. BOX 97, COTTON VALLEY, LA 71018
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 324110
- SIC code (legacy)
- 2911
- Employees
- 54
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
71 citations on file for this inspection.
1910.23 A02
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $5,000 · Current $1,500 Reduced
General-duty citation text
29 CFR 1910.23(a)(2): Ladderway floor opening(s) or platform(s) were not provide d with swinging gates or were not so offset that a person could not walk directl y into the opening: a) The employer does not ensure that every ladderway floor o pening or platform is guarded by a standard railing with the passage through the railing either provided with a swinging gate or so offset that a person cannot walk directly into the opening. An access ladder located on TWR- 401 was not equ ipped with a swing gate, chain, or so offset to prevent personnel from falling t hrough the opening. Measurements onsite showed an approximate distance of 11 fee t from the first platform to ground level. Additional higher level platforms on TWR-401 were also noted to not be equipped with a swing gate or chain. By not en suring every ladderway opening was protected, employees were exposed to fall hazards which can result i n serious injury or death. This may be a system-wide occurrence that requires ev aluation of all platforms and fixed ladders throughout the facility. This violat ion was observed on or about December 20, 2010. b) The employer does not ensure that every ladderway floor opening or platform is guarded by a standard railing with the passage through the railing either provided with a swinging gate or so offset that a person cannot walk directly into the opening. An access ladder loc ated on D- 508F was not equipped with a swing gate, chain, or so offset to preve nt personnel from falling through the opening. Measurements onsite showed an app roximate distance of 22 feet from the platform to ground level. By not ensuring every ladderway opening was protected, employees were exposed to fall hazards wh ich can result in serious injury or death. This may be a system- wide occurrence that requires evaluation of all platforms and fixed ladders throughout the facility. This violation was observed on or about December 20, 20 10. c) The employer does not ensure that every ladderway floor opening or platfo rm is guarded by a standard railing with the passage through the railing either provided with a swinging gate or so offset that a person cannot walk directly in to the opening. An access ladder located on TWR- 801 was not equipped with a swi ng gate, chain, or so offset to prevent personnel from falling through the openi ng. Height estimates onsite showed a distance greater than 30 feet from the plat form to ground level. By not ensuring every ladderway opening was protected, emp loyees were exposed to fall hazards which can result in serious injury or death. This may be a system- wide occurrence that requires evaluation of all platforms and fixed ladders throughout the facility. This violation was observed on or ab out December 20, 2010. d) The employer does not ensure that every ladderway floo r opening or platform is guarded by a standard railing with the passage through the railing either provided with a s winging gate or so offset that a person cannot walk directly into the opening. A n access ladder located on TWR- 802 was not equipped with a swing gate, chain, o r so offset to prevent personnel from falling through the opening. Measurements onsite showed an approximate distance of 15 feet from the platform to ground lev el. By not ensuring every ladderway opening was protected, employees were expose d to fall hazards which can result in serious injury or death. This may be a sys tem- wide occurrence that requires evaluation of all platforms and fixed ladders throughout the facility. This violation was observed on or about December 20, 2 010. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of th is citation, the employer must submit documentation showing that it is in compli ance with the standard,including the steps that it is taking to ensure that empl oyees are not being exposed to fall hazards.
Recent events (2)
- — F (S) $1500
- — Z (S) $5000
1910.23 C01
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.23(c)(1): Open sided floor(s) or platform(s), 4 feet or more above the adjacent floor or ground level, were not guarded by standard railings (or th e equivalent as specified in 29 CFR 1910.23(e)(3)(i) through (v), on all open si des.: The employer does not ensure all platforms 4 feet or more above adjacent f loor or ground level are guarded by a standard railing. A section of the midrail approximately 36 inches in length was missing from the overhead platform of the D-102 Crude Desalter creating a fall hazard of approximately (8) feet. This vio lation was observed on or about October 1, 2010. Pursuant to 29 CFR 1903.19, wit hin ten (10) calendar days of the abatement date, the employer must submit docum entation showing that it is in compliance with the standard, including describin g the steps that it is taking to ensure that employees are not being exposed to a fall hazard.
Recent events (1)
- — Z (S) $2500
1910.27 C01
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,500 · Current $2,500
General-duty citation text
29 CFR 1910.27(c)(1): The perpendicular distance from the center line of rungs t o the nearest permanent object on the climbing side of ladder(s) did not meet mi nimum clearance requirements: The employer does not ensure that the perpendicular distance from a fixed ladder to the nearest permanent object is 30". An exchanger fan next to the D-201 crude drum ladder was only 17" away, thus exposing employees to a stru ck by hazard. The violation was observed on or about October 1, 2010. Pursuant t o 29 CFR 1903.19, within (10) calendar days of the date of this citation, the em ployer must submit documentation showing that it is in compliance with the stand ard, including the steps that it is taking to ensure that employees are not bein g exposed to the fall struck by hazard.
Recent events (2)
- — F (S) $2500
- — Z (S) $1500
1910.27 D02
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $5,000 · Current $1,500 Reduced
General-duty citation text
29 CFR 1910.27(d)(2): Fixed ladder(s), used to ascend to heights exceeding 20 fe et and provided with cages or wells were not provided with a landing platform fo r each 30 feet of height or fraction thereof: a) The employer does not provide l anding platforms on fixed ladders that are used to ascend to heights exceeding 20 feet (except on chimneys). Landing platfo rms were not provided for each 30 feet of height or fraction thereof for a fixed ladder located on T-801. As measured onsite, the T-801 fixed ladder was estimat ed to reach heights greater than 50 feet without an offset landing platform. Alt hough the fixed ladder on T-801 was equipped with a "hinged rest platform", per OSHA letter of interpretation, dated 2/25/1983, it states 29 CFR 1910.27 (d)(2) does not allow the use of hinged rest platforms in lieu of landing platforms. By not providing landing platforms on fixed ladders exceeding 20 feet, employees w ere exposed to fall hazards. This may be a system-wide occurrence that would req uire the evaluation of all fixed ladders throughout the facility. b) The employe r does not provide landing platforms on fixed ladders that are used to ascend to heights exceeding 20 feet (except on chimneys). Landing platforms were not prov ided for each 30 feet of height or fraction thereof for a fixed ladder located on T-206. As me asured onsite, the T-206 fixed ladder was estimated to reach heights greater tha n 50 feet without an offset landing platform. Although the fixed ladder on T-206 was equipped with a "hinged rest platform", per OSHA letter of interpretation, dated 2/25/1983, it states 29 CFR 1910.27 (d)(2) does not allow the use of hinge d rest platforms in lieu of landing platforms. By not providing landing platform s on fixed ladders exceeding 20 feet, employees were exposed to fall hazards. Th is may be a system-wide occurrence that would require the evaluation of all fixe d ladders throughout the facility. Pursuant to 29 CFR 1903.19, within ten (10) c alendar days of the date of this citation, the employer must submit documentatio n showing that it is in compliance with the standard, including the steps that i t is taking to ensure that employees are protected from unsafe fixed ladders.
Recent events (2)
- — F (S) $1500
- — Z (S) $5000
1910.37 A03
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $2,500 · Current $5,000
General-duty citation text
29 CFR 1910.37(a)(3): The employer did not ensure each exit route was maintained free and unobstructed. The employer does not ensure that each exit and passagew ay is free from obstructions. A 6 inch flare line runs directly in front of the overhead passageway steps, creating a tripping hazard and obstructing the exit f rom the platform. This violation was observed on or about October 10, 2010 at th e D-102 Crude Desalter. Pursuant to 29 CFR 1903.19, within ten (10) calendar day s of the abatement date, the employer must submit documentation showing that it is compliance with the standard, including describing the steps that it is takin g to ensure that employees are not being exposed to this tripping hazard.
Recent events (2)
- — F (S) $5000
- — Z (S) $2500
1910.38 F03
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $2,500 · Current $2,500
Recent events (1)
- — Z (S) $2500
1910.101 B
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,500 · Current $1,500
General-duty citation text
29 CFR 1910.101(b): Section 3.4.4, Compressed Gas Association Pamphlet P-1965, a s adopted by 29 CFR 1910.101(b): Compressed gas cylinder(s) in use or in storage were not properly supported to prevent them from being knocked over: The employer does no t ensure that employees are protected from the hazard of being struck by compres sed gas cylinders in the event they are knocked over. One argon and two carbon d ioxide (CO2) cylinders were stored unsecured. This violation was observed on or about September 20, 2010 near the south wall of the maintenance shop. Pursuant t o 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with th e standard, including the steps that it is taking to ensure that employees are n ot being exposed to struck-by hazards during the movement and use of compressed gas cylinders.
Recent events (1)
- — Z (S) $1500
1910.253 B02 II
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.253(b)(2)(ii): Assigned storage spaces for cylinders were not locate d where cylinders could not be knocked over or damaged by passing or falling obj ects, or subject to tampering by unauthorized persons: a) The employer does not ensure that assigned storage spaces for cylinders were not located where cylinders could not be knocked over. This violation was observ ed on or about September 20, 2010, west of the pump shop where an oxygen cylinde r was not secured to prevent falling and exposing employees to a struck-by hazar d. b) The employer does not ensure that assigned storage spaces for cylinders we re not located where cylinders could not be knocked over. This violation was obs erved on or about September 20, 2010 at the compressed gas cylinder storage rack south of the maintenance shop where two acetylene cylinders were not secured to prevent falling and exposing employees to a struck-by hazard. Pursuant to 29 C. F.R. 1903.19, within ten (10) calendar days of the date of this citation, the em ployer must submit documentation showing that it is in compliance with the stand ard, including the steps that it is taking to ensure that employees are not being exp osed to struck-by hazards during the movement and use of compressed gas cylinder s.
Recent events (1)
- — Z (S) $0
1910.106 C04
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.106(c)(4): Piping systems shall be substantially supported and prote cted against physical damage and excessive stresses arising from settlement, vib ration, expansion, or contraction: The employer does not ensure that equipment i s fabricated in a suitable manner for the process application for which it will be used. Field inspection of PSV-307, located in the 300 unit, identified unrest rained discharge piping from PSV-307, through valve #2593, continuing downward toward the flare header. By not adequately supporting the PS V-307 discharge piping, a catastrophic piping failure may occur during a release . This violation was observed on or about December 20, 2010. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of this citation, the employe r must submit documentation showing that it is in compliance with the standard, including the steps that it is taking to ensure that employees are not being exp osed to highly hazardous chemicals.
Recent events (1)
- — Z (S) $7000
1910.119 D03 IB
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $2,500 · Current $7,000
Recent events (2)
- — F (S) $7000
- — Z (S) $2500
1910.119 D03 ID
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $2,500 · Current $7,000
General-duty citation text
29 CFR 1910.119(d)(3)(i)(D): Process safety information pertaining to the equipm ent did not include relief system design and design basis: The employer does not have written process safety information (PSI) pertaining to relief system desig n and design basis. The employer did not have complete written PSI related to PS V-701. As described in the 2001 Calumet Lubricants Flare Study, conducted by Jac ob and Associates LLC, PSV-701 was undersized and not adequate based upon the fi re case relief scenario. As stated under the "Zone 8" summary, finding 1, "Relie f valve PSV-701 needs to be changed; it is not adequate, the relief valve should be changed to a 1.5 x G x 2.5." Calculations in the relief study were based upon the larger "G" orifice size. Without a "G" o rifice, per the flare study, the valve is too small. In 2008, nearly 7 years aft er the flare study was completed, the employer responded to the change stating t he "valve never installed because it was determined adequate protection was avai lable with existing valve and equalization line to T-700." No MOC was conducted to assess and document the operating change of keeping the smaller valve in serv ice. No additional design data or calculations were provided to support keeping the older, smaller valve in service. No adjustment to the flare study was made t o show a smaller valve orifice was adequate. Field verification of PSV-701 indic ated a valve size "1 x E x 5" was currently present on D-700. Consequently, sinc e no evaluation was done, it is not known whether the PSI is accurate. This viol ation was documented on or about December 20, 2010. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in complianc e with the standard, including the steps that it is taking to ensure that employ ees are not being exposed to highly hazardous chemicals.
Recent events (2)
- — F (S) $7000
- — Z (S) $2500
1910.119 D03 IF
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $2,500 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i)(F): Process safety information pertaining to the equipm ent did not include the design codes and standards employed: The employer does n ot include in its Process Safety Information (PSI), the codes and standards used in the design of relief systems. Review of the Calumet Lubricants Company Flare Study, dated 12/04/2001, does not identify which codes and standards are implem ented and followed in the development of the 2001 Flare Study. This study, condu cted by Jacob and Associates LLC, makes no reference to API, ASME, or other appl icable standards used in the design and assessment of relief systems. Examples o f applicable design codes include, but are not limited to, API 520 Parts 1 and 2 , API 521, API 526, API 537, ASME BPVC Section 8, etc. As a result, Process Safety Information (PSI) is incomplete. Not maintaining codes an d standards used in the design of relief systems can prevent the employer from i dentifying, designing, and maintaining equipment within safe limits. This may be a system-wide occurrence that requires evaluation of all equipment throughout t he facility. This violation was documented on or about December 20. 2010. Pursua nt to 29 CFR 1903.19, within ten (10) calendar days of the date of this citation , the employer must submit documentation showing that it is in compliance with t he standard, including the steps that it is taking to ensure that employees are not being exposed to highly hazardous chemicals.
Recent events (2)
- — F (S) $0
- — Z (S) $2500
1910.119 D03 II
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $21,000
General-duty citation text
29 CFR 1910.119(d)(3)(ii): The employer did not document that the equipment in t he process complied with recognized and generally accepted good engineering prac tices: a)The employer does not document that pressure safety valve PSV-217 compl ies with RAGAGEP. The total backpressure on this valve exceeds approximately 23% of the valve's set pressure. As per API 520, Part 1, backpressure on conventional valve s should not exceed 10 % of the set pressure. Documents provided by the employer shows PSV-217 with a set pressure of 85 psig, with a total backpressure of 20.0 0 psig under the fire case scenario. Increased backpressure can result in valves not performing as designed. This violation was documented on or about December 20, 2010. b)The employer does not document that pressure safety valve PSV-809 co mplies with RAGAGEP. The total backpressure on this valve exceeds approximately 11% of the valve's set pressure. As per API 520, Part 1, backpressure on convent ional valves should not exceed 10 % of the set pressure. Documents provided by t he employer shows PSV-809 with a set pressure of 90 psig, with a total backpress ure of 10.17 psig under the fire case scenario. Increased backpressure can resul t in valves not performing as designed. This violation was documented on or about December 20, 2010. c)The emp loyer does not document that pressure safety valve PSV-810 complies with RAGAGEP . The total backpressure on this valve exceeds approximately 16% of the valve's set pressure. As per API 520, Part 1, backpressure on conventional valves should not exceed 10 % of the set pressure. Documents provided by the employer shows P SV-810 with a set pressure of 90 psig, with a total backpressure of 15.27 psig u nder the fire case scenario. Increased backpressure can result in valves not per forming as designed. This violation was documented on or about December 20, 2010 . d)The employer does not document that pressure safety valve PSV-1001 complies with RAGAGEP. The total backpressure on this valve exceeds approximately 11% of the valve's set pressure. As per API 520, Part 1, backpressure on conventional v alves should not exceed 10 % of the set pressure. Documents provided by the empl oyer shows PSV-1001 with a set pressure of 75 psig, with a total backpressure of 8.48 psig under the fire case scenario. Increased backpressure can result in valves not performing as designed. This violation was documented on or about December 2 0, 2010. e)The employer does not document that pressure safety valve PSV-1002 co mplies with RAGAGEP. The total backpressure on this valve exceeds approximately 28% of the valve's set pressure. As per API 520, Part 1, backpressure on convent ional valves should not exceed 10 % of the set pressure. Documents provided by t he employer shows PSV-1002 with a set pressure of 50 psig, with a total backpres sure of 14.17 psig under the fire case scenario. Increased backpressure can resu lt in valves not performing as designed. This violation was documented on or abo ut December 20, 2010. f)The employer does not document that pressure safety valv e PSV-1003 complies with RAGAGEP. The total backpressure on this valve exceeds approximately 23% of the v alve's set pressure. As per API 520, Part 1, backpressure on conventional valves should not exceed 10 % of the set pressure. Documents provided by the employer s hows PSV-1003 with a set pressure of 75 psig, with a total backpressure of 17.45 psig under the fire case scenario. Increased backpressure can result in valves not performing as designed. This violation was documented on or about December 2 0, 2010. g)The employer does not document that pressure safety valve PSV-1004 co mplies with RAGAGEP. The total backpressure on this valve exceeds approximately 11% of the valve's set pressure. As per API 520, Part 1, backpressure on convent ional valves should not exceed 10 % of the set pressure. Documents provided by t he employer shows PSV-1004 with a set pressure of 75 psig, with a total backpres sure of 8.96 psig under the fire case scenario. Increased backpressure can resul t in valves not performing as designed. This violation was documented on or about December 20, 2010. h)Calumet does not comply with RAGAGEP, such as, but not limited to API 752, CCPS, and AI ChE/Dow Fire and Explosion Index; in allowing employees to occupy inadequately p rotected (i.e., not adequately protected by separation or building construction) structures which are exposed to explosion, fire, toxic material, corrosive mate rial, or high pressure hazards resulting from the release of highly hazardous ch emicals from process equipment, in the Hydrotreater, 100, 400, and 1100 Units Th e buildings located in unacceptable areas of the blast zone include the main off ice, laboratory, and truck loading building. i)The employer does not document th at process equipment complies with RAGAGEP. Pressure vessel D-101 was not re-rat ed in accordance with API 510. The vessel is stamped at 75 psig at 250 F and was re-rated to 75 psig at 650. The re-rating of D-210 was addressed by MOC 2010-60. The MOC only contains information addressing the m etallurgy of the materials used in the vessels; indicating that they do not lose their properties at the new design temperature of 650 F. However, other informa tion required by API 510 and other codes has not been addressed. j)The employer does not document that process equipment complies with RAGAGEP. Pressure vessel D-210 was not re-rated in accordance with API 510. The vessel is stamped at 80 p sig at 100 F and was re-rated to 80 psig at 650. The re-rating of D-210 was addr essed by MOC 2010-61. The MOC only contains information addressing the metallurg y of the materials used in the vessels; indicating that they do not lose their p roperties at the new design temperature of 650 F. However, other information req uired by API 510 and other codes has not been addressed. k)The employer does not develop safe work practices to provide for the control of hazards during operations such as lockout/tagout. Per Calumet Lubricants Co. policy "Lockout & Tagout of Equipment", dated 5/03/2010, Section 13 Car Sealing, Subsection 13.2, "Block valves upstream and downstream of PSV's require a car s eal or car seal open (CSO) tag." This policy does not require a car seal or phys ical locking barrier. Per ASME Boiler and Pressure Vessel Code, Division 1, it s tates, intervening valves are allowed only when administrative controls are prov ided to prevent unauthorized valve operation and the valves are provided with me chanical locking elements. Examples ofmechanical locking elements per ASME inclu de, but are not limited to, locks with or without chains, and plastic or metal s traps. By not fully developing safe work practices, employees were not provided with clear instructions about what methods must be used to isolate valves and/or equipment. This violation was documented on or about December 20, 2010. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of this ci tation, the employer must submit documentation showing that it is in compliance with the standard, including the steps that it is taking to ensure that employee s are not being exposed to highly hazardous chemicals.
Recent events (2)
- — F (S) $21000
- — Z (S) $7000
1910.119 E03 III
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(e)(3)(iii): The process hazard analysis did not address engineer ing and administrative controls applicable to the hazards and their interrelatio nships such as appropriate application of detection methodologies to provide ear ly warning of releases: a)The employer does not conduct a process hazard analysi s which addresses engineering and administrative controls (process monitoring an d control instrumentation with alarms and detection hardware such as hydrocarbon sensors) applicable to the hazards and their interrelationships with appropriat e application of detection methodologies; and is also appropriate for the comple xity of the process. Items such as alarms, pressure relief devices, flares, hydrocarbon sensors, emergency procedures, emer gency operating procedures, fire monitors were not addressed for many nodes in t he process hazard analysis. There are almost always consequences of interest for a change in a process parameter. For example: more flow into a vessel will usua lly generate more pressure in the vessel, more level in the vessel, or more flow out of the vessel. Also, reverse flow will usually be problem. Yet items such a s these were addressed in the Hazop as "No consequences of interest." This viola tion was documented on or about December 9, 2010 when it was noted that the 2007 What-if PHA for the 1100 Unit listed the consequences of the fire box being too hot as "Overheating the tubes with possible equipment damage, whereas the HAZOP PHA listed the consequence of the fire box being too hot as "No Consequences of interest." The HAZOP contained 14 nodes. One of them, Heater H11 01, was reanalyzed as a What-if. The other 13 nodes did not benefit from this ex panded approach. For them, most items are addressed as "No consequences of inter est." Examples: Node 3.3, Feed Line Out, had "No Consequences of Interest for al l items except leak/rupture. Node 5.2, Line in and Out Including Shell Side,, ha d "No Consequences of Interest for all items except leak/rupture. Node 9.2, Wate r Draw Line Out, had "No Consequences of Interest for all items except leak/rupt ure. b)The employer failed to ensure that the process safety information concern ing the technology of the process included a written evaluation of the consequen ces of deviations, including those affecting the safety and health of employees. A writ ten evaluation of the consequences of deviation is not available for pressure ve ssel E-403 A/B/C, 2.1 Line in Shell Side . The consequences of deviation lists " no consequence of interest" for would include circumstances which could result i n conditions such asmore flow, less flow, more pressure, and less pressure, the potential hazards of these consequences (equipment failure, release of hydrocarb ons, fire, explosion), and a list of the safeguards (e.g., alarms, operating pro cedures, training, pressure safety valves, flare system, blast-resistant buildin gs, etc.) available which protect employee safety and health. This may be a syst em-wide occurrence that requires the development and evaluation of all consequen ces of deviation throughout the facility. Pursuant to 29 CFR 1903.19, within ten (10)calendar days of the abatement date, the employer must submit an abatement plan describing the actions it is taking to ensure that the abovementioned possibilities are considered in all future Process Hazard Analyse s to protect employees.
Recent events (1)
- — Z (S) $7000
1910.119 E03 IV
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(e)(3)(iv): The process hazard analysis did not address the conse quences of failure of engineering and administrative controls: a) The employer d oes not ensure that the 400 Unit process hazard analysis (PHA), dated October 13 , 2009, addresses the consequences of failure of engineering and administrative controls. "Node 5: T-401 and associated piping", lists "no consequence of intere st" for items such as more flow, less flow, more pressure, and less pressure, wi th no possible causes, safeguards or recommendations listed. The consequences of failure from conditions such as high temperature, high pressure, low flow, high flow, reverse flow will result in administrative controls (i.e., alarms, implem entation of emergency operating procedures, manual closing of valves, training) and engineering controls (relief valves, rupture discs, flare system, automatic closing of valves) being put into effect. The consequences of failure of these controls are not inc luded in the PHA. More pressure and more flow can result in conditions leading t o catastrophic equipment failure and the potential release of hydrocarbons. By n ot evaluating the consequences of deviation, including those affecting the safet y and health of employees, the employer was deprived of critical information use d to ensure process stability and employee safety and health. This violation was documented on or about December 20, 2010. b) The employer does not ensure that the 400 Unit process hazard analysis (PHA), dated October 13, 2004, addresses th e consequences of failure of engineering and administrative controls. "Node 5.4: PSV to Flare", lists "no consequence of interest" for items such as more flow, reverse flow, and more pressure, with no possible causes, safeguards or recommen dations listed. The consequences of failure from conditions such as high tempera ture, high pressure, low flow, high flow, reverse flow will result in administra tive controls (i.e., alarms, implementation of emergency operating procedures, manual closing of valves, trai ning) and engineering controls (relief valves, rupture discs, flare system, auto matic closing of valves) being put into effect. The consequences of failure of t hese controls are not included in the PHA safeguards, or recommendations listed. More pressure and more flow can result in conditions leading to catastrophic eq uipment failure and the potential release of hydrocarbons. By not evaluating the consequences of deviation, including those affecting the safety and health of e mployees, the employer was deprived of critical information used to ensure proce ss stability and employee safety and health. This violation was documented on or about December 20, 2010. Pursuant to 29 CFR 1903.19, within ten (10) calendar d ays of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including the steps that it is taki ng to ensure that employees are not being exposed to highly hazardous chemicals.
Recent events (2)
- — F (S) $0
- — Z (S) $7000
1910.119 E03 V
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(e)(3)(v): The employer failed to perform a process hazard analys is of the appropriate complexity of the process which identified, evaluated, and controlled the hazards involved in facility siting The employer is not performi ng a process hazard analysis which is of the appropriate complexity for the proc ess and identifies, evaluates, and controls the hazards involved in facility sit ing. The employer violated this standard when it was noted that several key ques tions on the Process Hazard Analysis Facility Siting Checklists and Building Eva luation Forms completed in 2008 and 2009 were completed incorrectly, without bas is and consideration of a facility blast study. The facility siting checklist was completed without the benefit of a Facility Si ting Analysis report (completed September 10, 2010), which indicates blast overp ressures as high 14.7 psi, resulting in serious injuries and fatalities at the r efinery. This exposes employees to fire and explosion hazards. Pursuant to 29 CF R 1903.19, within ten (10) calendar days of the abatement date, the employer mus t submit an abatement plan describing the actions it is taking to ensure that th e abovementioned possibilities are considered in all future Process Hazard Analy ses to protect employees.
Recent events (2)
- — F (S) $0
- — Z (S) $7000
1910.119 E06
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(e)(6): The employer did not ensure after the initial process haz ard analysis that the process hazard analysis was updated and revalidated at lea st every five (5) years by a team meeting the requirements of 20 CFR 1910.119(e) (4) to assure that the process hazard analysis was consistent with the current p rocess: a)The employer does not consider in its 1100 Crude Unit PHA update/revalidation, the throughput increase and any potential effects the increase might have on th e adequacy of the current process, including the existing relief system. As prov ided by the employer, throughput design changes were made in 2002 for the 1100 C rude Unit to increase throughput to 3600 Barrels Per Day (BPD). The employer sta ted that in place of an MOC, a PHA would be conducted. Review of the 1100 Crude Unit PHA, dated 4/16/2002, did not identify where throughput was assessed. Data supporting evidence of evaluation, consultation with the refinery's engineering/ technical staff, and whether the existing/current engineering analysis of the re lief system is adequate for the new unit throughput is not in the PHA. Documents provided by the employer stated that "Calumet Lubricants Co. has reviewed the d esign to the piping associated with all Pressure Safety Valves (PSV's)...", but does not address throughput changes. A detailed review of the relief system and associated capacity is critical during any change to ensure th e current system can appropriately function with increased throughput. This viol ation was documented on or about December 20, 2010. b) The employer does not con sider in its 700 Unit PHA update/revalidation, the throughput increase and any p otential effects the increase might have on the adequacy of the current process, including the existing relief system. As provided by the employer, throughput d esign changes were made in 2003 for the 700 Unit to increase throughput to 5200 Barrels Per Day (BPD). The employer stated that in place of an MOC, a PHA would be conducted. Review of the 700 Unit PHA, dated 10/27/2004, does not identify wh ere throughput was assessed. Data supporting evidence of evaluation, consultatio n with the refinery's engineering/technical staff, and whether the existing/curr ent engineering analysis of the relief system is adequate for the new unit throu ghput is not in the PHA. Documents provided by the employer stated that "Calumet Lubricants C o. has reviewed the design to the piping associated with all Pressure Safety Val ves (PSV's)...", but does not address throughput changes. A detailed review of t he relief system and associated capacity is critical during any change to ensure the current system can appropriately function with increased throughput. This v iolation was documented on or about December 20. 2010. Pursuant to 29 CFR 1903.1 9, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, includ ing the steps that it is taking to ensure that employees are not being exposed t o highly hazardous chemicals.
Recent events (1)
- — Z (S) $7000
1910.119 F01
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(f)(1): The employer did not implement written operating procedur es that provide clear instructions for safely conducting activities involved in eac h covered process: This violation was documented on or about November 4, 2010 (u nless otherwise noted) when the following were noted: a)Approved shortcuts are t aken when performing Operating Procedure Rx-302 Shutdown/Startup Before / After Zinc Oxide Change-out procedure. According to the procedure, step 3.2.6 states " Repeat pressure up and bleed down three times", and step 3.3.1 states "Open nitr ogen flow ~ 25%." Operator interviews indicate that these deviations are not unu sual, and is not necessarily hazardous. The purpose of step 3.2.6 is to purge ox ygen from the equipment If the oxygen is low enough after a single purge there i s no reason to do more. The same goes for the nitrogen. Its purpose is to displa ce oxygen. 100% flow will do this faster than 25% flow. This is evidence that the abovementioned procedure is poorly written. If it said repeat step 3.2.6 until the oxygen concentration was below the maximum accepted value, there would be need to bypass steps. b)The employer failed to implement written operating procedures that provide clear instructions for safely conducting activ ities involved in each covered process consistent with the process safety inform ation. Review of the facility's "Inspection Procedure for Pressure Safety Valves and Rupture Disks", dated 3/20/2008, states that maintenance/inspection personn el are required to check "if block valves are present, (and) ensure that they ar e locked or car sealed open." Said policy requires block valves to be car sealed open. Multiple valves, including, but not limited to, valve #2598 (300 Unit) an d valve #2599 (300 Unit) were found to be in service and not car sealed open wit h a car seal or locking device. By not implementing written procedures, employees may be unaware of actual requirements and not take appropriate steps to ensure block valves are maintained in the open position. A s a result, valves could be inadvertently closed isolating relief devices. This violation was documented on or about December 20, 2010. This exposes employees t o fire and explosion hazards. Pursuant to 29 CFR 1903.19, within ten (10) calend ar days of the abatement date, the employer must submit an abatement plan descri bing the actions it is taking to ensure that procedures are well written and fol lowed properly.
Recent events (2)
- — F (S) $0
- — Z (S) $7000
1910.119 F01 II
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
1910.119(f)(1)(ii): The employer did not develop and implement written operating procedures that address operating limits, consequences of deviation from those lomits, and/or methods for correcting deviations from the operating limits: This violation was observed on or about October 6, 2010 when it was noted that operating limits are not addressed in the following operating procedures. a)Solv ent Section Emergency Operations procedure dated 8/20/2010 Item 3.1.6 directs op erators to "Maintain Reflux rate on FIC-806 to T-803." It does not say what the rate is or what it should be, or how to correct the rate if it's wrong, or list consequences of deviation. FIC-806, the reflux flow controller, is listed in the Solvent Unit Alarm Response Table, but the Normal Operating Range is defined as "proportional to charge rate." Since it doesn't say what the proportion is, the re is no way of knowing what the normal value is. The alarm set points for this parameter are available in the DCS, but alarm set points are not necessarily the same as operating limits. Item 3.1.9 directs operators to "Maintain Reflux rate on T-207, T801, and T 802 at normal rates." It does not say what the rate is or what it should be, or how to correct the rate if it's wrong, or list consequences of deviation. The Solvent U nit Alarm Response Table, lists the Normal Operating Range for reflux rate for T -802, but not the others." The alarm set points for this parameter are available in the DCS, but alarm set points are not necessarily the same as operating limi ts. Item 3.1.13 directs operators to "Hold Level in T-202 and maintain normal re flux rate." It does not say what the level should be, what the normal reflux rat e is, how to correct either if it's wrong, or list consequences of deviation. Th e Solvent Unit Alarm Response Table, lists the Normal Operating Range for T-202 level, but not reflux rate." The alarm set points for this parameter are availab le in the DCS, but alarm set points are not necessarily the same as operating li mits. Item 3.1.17 contains a NOTE that requires the operator to "Watch the reflu x rate and hold at normal rate." It does not say what the normal reflux rate is, h ow to correct either if it's wrong, or list consequences of deviation. FIC-806, the reflux flow controller, is listed in the Solvent Unit Alarm Response Table, but the Normal Operating Range is defined as "proportional to charge rate." Sinc e it doesn't say what the proportion is, there is no way of knowing what the nor mal value is. The alarm set points for this parameter are available in the DCS, but alarm set points are not necessarily the same as operating limits. Item 3.1. 18 directs operators to "Hold Level in T-800 and maintain normal reflux rate." I t does not say what the level should be, what the normal reflux rate is, how to correct either if it's wrong, or list consequences of deviation. LIC-800, the T- 800 level controller is listed in the Solvent Unit Alarm Response Table, but the re is no listing for a Reflux rate controller or any information on what the reflux rate shouldbe. The alarm set points for this parameter are available in the DCS, but alarm set points are not necessarily the same as operating limits. Item 3.1.23 c ontains a NOTE that requires the operator to "Watch the pressure on T- 600. Make -up gas may have to be added to hold positive pressure." It does not indicate ho w much positive pressure is desirable vs. how much is too much, how to correct e ither if it's wrong, or list consequences of negative pressure. This information is not in the Solvent Unit Alarm Response Table. The alarm set points for this parameter are available in the DCS, but alarm set points are not necessarily the same as operating limits. Item 3.5.5 directs the operator to "Monitor T-800 ope rations - adjust reboiler heat input. It does not say what parameter(s) T-800 sh ould be monitored, what the normal parameters are, how to correct what's wrong, or list consequences of deviation. It also doesn't say how much adjustment is required/allowed, how to correct what 's wrong, or list consequences of deviation. This information is not in the Solv ent Unit Alarm Response Table. The alarm set points for this parameter are avail able in the DCS, but alarm set points are not necessarily the same as operating limits. Item 3.6.2 directs the operator to "Increase T-803 O/H production - moni tor FIC-814. It does not say how much of an increase is required/ allowed in the O/H production nor what to monitor FIC-814 for. There are no consequences of de viation or steps to correct them. FIC-814 is not listed in the Solvent Unit Alar m Response Table. The alarm set points for this parameter are available in the D CS, but alarm set points are not necessarily the same as operating limits. Item 3.8.4 states "Monitor T-803 flash-in temperature." There is no indication in either the procedure or the Solvents Alarm Response Tables of what the pressu re should be. There are no consequences of deviation or steps to correct them. T he alarm set points for this parameter are available in the DCS, but alarm set p oints are not necessarily the same as operating limits. Item 3.9.3, Item 3.10.2, and Item 3.11.2 state "Decrease hot oil flow to R-800 as applicable." There is nothing in the procedure or the Solvents Alarm Response Table that indicates wha t "as applicable" means. The alarm set points for this parameter are available i n the DCS, but alarm set points are not necessarily the same as operating limits . Item 3.19.2 states "Reduce reboiler heat input." There is nothing to indicate how much to reduce it. There is no indication in either the procedure or the Sol vents Alarm Response Tables of what the pressure should be. There are no consequences of deviation or steps to correct them. The alarm set points for this parameter a re available in the DCS, but alarm set points are not necessarily the same as op erating limits. Item 3.21.2 states "Decrease heat input to tower bottom." There is nothing toindicate how much to reduce it. There is no indication in either th e procedure or the Solvents Alarm Response Tables of what the pressure should be . There are no consequences of deviation or steps to correct them. The alarm set points for this parameter are available in the DCS, but alarm set points are no t necessarily the same as operating limits. Item 3.27.2 states "Decrease heat in put to tower bottom." There is nothing to indicate how much to reduce it. There is no indication in either the procedure or the Solvents Alarm Response Tables of what the pressure should be. There are no cons equences of deviation or steps to correct them. The alarm set points for this pa rameter are available in the DCS, but alarm set points are not necessarily the s ame as operating limits. Item 3.28.2 states "Reduce reboiler heat input." There is nothing to indicate how much to reduce it. There is no indication in either t he procedure or the Solvents Alarm Response Tables of what the pressure should b e. There are no consequences of deviation or steps to correct them. The alarm se t points for this parameter are available in the DCS, but alarm set points are n ot necessarily the same as operating limits. b)Hydrotreater Unit Emergency Opera tions procedure dated 11/04/2009 Item 5.4 of Section 5, Leak in Process Line or Vessel, directs the operator to "Shut down the heater." There is guidance for how to do this in Section 4, He ater Tube Failure, but there is no reference to lead the operator to Section 4. Item 18.6 of Section 18, Loss of Recycle Hydrogen Compressor, directs the operat or to "Shut down the heater." There is guidance for how to do this in Section 4, Heater Tube Failure, but there is no reference to lead the operator to Section 4. Items 4.8, 5.3, and 6.6 of the procedure, direct the operator to "Control pre ssure with HY-320." There is no indication in either the procedure or the Hydro- Treater Alarm Response Tables of what the pressure should be. Item 14.1 requires the operator to decrease the heater outlet to control RX-304 inlet temperature. There is a NOTE in this step that describes how to calculate the new setpoint. Item 13.2 also requires the operator to decrease the heater outlet to control RX-304 inlet temperature, but there is no note giving guidance for calculating t he new setpoint. c)100 Unit Emergency Operations procedure dated 8/24/10 Step 3. 7.2 says "Monitor Stripper levels. Adjust LCV as necessary." It does not say wha t the levels should be and there are no LCVs at all listed in the 100 Unit Alarm Response Tables. The alarm set points for this parameter are available in the D CS, but alarm set points are not necessarily the same as operating limits.This e xposes employees to fire and explosion hazards. Pursuant to 29 CFR 1903.19, with in ten (10) calendar days of the abatement date, the employer must submit an aba tement plan describing the actions it is taking to ensure that operating procedu res include normal operating limits for the operating parameters associated with the procedure.
Recent events (2)
- — F (S) $0
- — Z (S) $7000
1910.119 H02 VI
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,500 · Current $7,000
General-duty citation text
29 CFR 1910.119(h)(2)(vi): The employer did not maintain a contract employee inj ury and illness log related to contractor's work in process areas: The employer does not maintain OSHA 300 injury and illness logs for contractors working in the refine ry process areas. This violation was documented on or about September 22, 2010. Pursuant to 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with th e standard, including the steps that it is taking to ensure that contractor safe ty and illness information is maintained.
Recent events (2)
- — F (O) $7000
- — Z (S) $1500
1910.119 J02
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish and implement written proc edures to maintain the on-going mechanical integrity of process equipment: a)The employer does not establish and implement written procedures to ensure the on-g oing integrity of process equipment. Specifically PSV-306 and PSV-1403 had the w rong spring. The mechanical integrity program does not include procedures which would prevent the installation of pressure safety valves which contain incorrect parts. During a review of Pressure Safety Valves (PSV), PSV-306 and PSV-403 were identi fied as containing incorrect parts, specifically PSV-306 had the wrong spring. A s a result, both valves failed a leak test. Calumet Lubricants Co. "Mechanical I ntegrity Requirements", dated 12/03/2008, contains subsections related to inspec tion and testing of PSVs, but does not address procedures for ensuring that corr ect internal components are installed in all PSVs. The result is deficient equip ment was in service within the refinery. Incorrect internal parts in PSV can res ult in the PSV not functioning as designed which could result in catastrophic eq uipment failures. b)The employer does not establish and implement adequate writt en procedures. Mechanical The mechanical integrity program does not include proc edures which would prevent the installation of pressure safety valves containing the wrong parts. During CSHO a review of Pressure Safety Valves (PSV's) covered by the Mechanical Integr ity Program, PSV-507 and PSV-512 were identified as containing incorrect parts, specifically the wrong upper washer, spring, lower washer, and disc holder. Alth ough the Calumet Lubricants Co. "Mechanical Integrity Requirements", dated 12/03 /2008, contains subsections related to inspection and testing of PSV's and ruptu re disks, the policies and procedures do not contain procedures for ensuring tha t correct internal components are installed in all PSV's. As a result, PSV's are in service with incorrect internal components. By not establishing and implemen ting a comprehensive mechanical integrity program, deficient equipment was in se rvice within refining units. Incorrect internal parts in PSV's can result in the PSV not functioning as designed. Such an event can lead to catastrophic equipme nt failures. c)The employer is not implementing adequate procedures to ensure the on-going in tegrity of process equipment. The employer's written Mechanical Integrity proced ure 3.2(g) states "Run nut to 1" of stud shows past the nut." This procedure has not been implemented in the 1100 Unit resulting in the presence of "short bolts " in the following process equipment. Line 2" HL-1100-027-1A1A on the LCV-1123 c ircuit on the flange connecting the Valtek Valve to the line. Line 4" HL-1100-01 7-1A1A on the TCV-1100B circuit on the flange connecting the Valtek Valve to the line. Line 4" HL-1100-017-1A1A on the LCV-1123 circuit on the flange connecting the horizontally-orientated Valtek Valve to the line.Line 2" HL-1100-024-A2-1-2 on the FCV-1114 circuit on the flange connecting the vertically-orientated Valt ek Valve to the line. Line 3" HL-1100-023-A2-1-2 on the 1102 circuit on the flan ge connecting the vertically-orientated Valtek Valve to the line. "Short Bolts" are bolts that are not in accordance with Mechanical Integrity Pro gram 3.2(g), "Run nut to 1" of stud shows past the nut". This violation was obse rved on or about October 01, 2010. d)The employer does not establish and impleme nt written procedures to ensure the identification and resolution of anomalous i nspection data as part of its on-going mechanical integrity program. The followi ng anomalous data was identified: Piping Circuits Missing, incorrectly recorded or incorrect location of TML ports: C-001, C- 001A, C-003, C-004, C-006, C-008, C-011, C-012, C-013, C-016, C-018, C- 024, C-025, C-030, C-031, C-032, C-034, C- 037, C-038, C-039, C-040, 11-004, 11-016; 400-12, 400-18, 400-19, 400-20, 400-21 1100-1, 1100-1A, 1100-3, 1100-13, 1100-15, 1100-18, 1100-19, 1100-23 TML ports are missing on the insulated portion of the piping. HT018, HT009, 400-005, 400-0 21, 400-022, 400-033 UT data not recorded on the pipe or in the database: C-001, C-001A, C-004, C- 03 0, C-037. Incorrectly recorded UT data: C-016, C-018, C-028 No isometric drawing or incorrect isometric (different than 2000 isometric) drawing, or TML points m issing on the drawing C-004, C-005/005A, C-007, C- 010, C-011, C-013, C-014, C-0 15, C-016, C-018, C-023, C-031, C-032, C-033, C-034, C-037, C-038, 11-004, 11-01 6; 400-011, 400-20, 1100-02, 1100-3, 1100- 5, 1100-15, 1100-20 Thickness Measure ment Locations not tested 11-001 -two of five established TML have UT data 11-00 4 -one of six established TML has UT data. 11-016 -one of two established TMLs h as UT data. 400-20 -eight of twenty TML established have UT data. 400-21 -six of thirty-eight TML established have UT data. 400-22 -one of twenty-five TML estab lished has UT data. 400-23 -two of nineteen TML established have UT data. 400-24 -no UT data has been collected for this circuit.400-24 -no UT data has be en collected for this circuit. 400-25 -only six of twenty-three TML established have UT data. 400-32 -only six of twenty-eight TML established have UT data. 400 -33 -No UT data has been collected for this circuit. Thickness Monitoring Locati ons which are not reproducible D-1001: The pressure vessel has been painted so t he current TML are not reproducible. D-210: The pressure vessel has been painted so the current TML are not reproducible. R-401: Only one inspection was conduct ed between 1995 and 2008 and the 2008 inspection has different TML points than t he July 1995 UT inspection. Thickness measurements that increase over time UT te st data is entered into the UlraPipe system. When the thickness of pipe is found to be larger than the previous measurement; the UltraPipe program enters an "RR " notation adjacent to the test result to notify the user that the value is a potential error (metal pipe cannot grow in thickness). It is then incumbent upon the user to resolve this value (i.e., re-take the meas urement, calibrate the equipment, establish a new baseline, etc.). Calumet has n ot implemented a written program to resolve thickness monitoring results that ar e greater than those obtained during the previous inspection. e)Calumet is not i mplementing a program to ensure appropriate corrosion rates are established for piping in accordance with the Calumet "Inspection Procedure for Piping Systems". Section 5.2 requires that "initially the ultrasonic thickness measurements shal l be repeated every two years to confirm the corrosion rate. For most of the pip ing vessels in Units 100, 400, and 1100, the thickness monitoring inspections ar e not conducted every two years in accordance with the program. This is particul arly critical for this facility since in many instances they cannot reproduce ol d TML or the old TML have been abandoned and replaced with new TML; and hence no corrosion rate have been established for many piping circuits. No baseline UT data was collected and no corrosion rates have been established for piping circuit such as but not lim ited to the following. 11-001 H-1101 to T-1101 11-004 P-1101 A/B Discharge to T- 1101 11-016 D-1101 Relief FH-1 to FH-20400-008 f)Calumet has not established and implemented a written program that ensures that historical UT measurements whic h are at or beyond their retirement date are resolved or reconciled. Piping and pressure vessels operated beyond their thickness retirement date have a greater chance of rupture resulting in flammable vapor clouds and the potential for fire and explosion. TC-1 Crude Tower (T-101) 1994 Alltech Inspection Report TML pointInspection Date Expected Life (years)TML Retire Date N-221/944.14 years2/98 S-21/941.36 years5/9 5 Crude Unit Piping 1994 Alltech Inspection Report TML pointInspection DateExpec ted Life (years)TML Retire Date C016-1501/940 years1/94 C016-1701/940 years1/94 Naphtha Piping 1990 Walter Rossler Company Inspection Report Naptha Piping Circu its- Naptha 01 to Naptha-051 Calumet Inspection Program D-210: TML is beyond its retirement date of April 28, 2010. D-102: TML is beyond its retirement date of April 28, 2010. There is a November 2005 recommendation by the Calumet inspectio n team to replace D- 102 (aka-Desalter). RX-301: TML point #18 has exceeded its calculated retirement date. RX-302: TML point #19 has exceeded its calculated retirement date, 5/2/20 09. g)Calumet did not comply with RAGAGEP, such as but not limited to NFPA 496, by failing to implement a preventative maintenance schedule/ program for the pos itive pressure control system located in the refinery control room. During this inspection OSHA found the positive pressure control system present in the refine ry control room was not operational and there is no preventative maintenance pro gram in place which addresses this equipment. Indicators (functional magnehelic gauge and audible alarm) of a functioning positive pressure control system were not operational. Pressurization is used to keep a positive pressure in a buildin g for the purpose of keeping harmful or hazardous vapors from entering.Pursuant to 29 CFR 1903.19, within ten (10) calen dar days of the date of this citation, the employer must submit documentation sh owing that it is in compliance with the standard, including the steps that it is taking to ensure that employees are not being exposed to highly hazardous chemi cals.
Recent events (1)
- — Z (S) $7000
1910.119 J04 I
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(j)(4)(i): Inspections and tests were not performed on process eq uipment to maintain its mechanical integrity: a)The employer did not require Cha rter Chambers, LLC to perform inspections and tests on process equipment to main tain its mechanical integrity. As per the "Pressure Relief Valve Test & Inspecti on Report", dated 1/26/2010, PSV-2(900) was not subjected to an "as received pop test." As a result, the pop test was not performed. This violation was document ed on or about December 20, 2010. b)The employer did not require Charter Chambers, LLC to perform inspections and tests on process equipment to maintain its mechanical integrity. As per the "Pre ssure Relief Valve Test & Inspection Report", dated 8/24/2010, PSV-1403 was not subjected to an "as received pop test." As a result, the pop test was not perfor med. This violation was documented on or about December 20, 2010. c)The employer did not require Charter Chambers, LLC to perform inspections and tests on proce ss equipment to maintain its mechanical integrity. As per the "Pressure Relief V alve Test & Inspection Report", dated 8/24/2010, PSV-1404 was not subjected to a n "as received pop test." As a result, the pop test was not performed. This viol ation was documented on or about December 20, 2010. d)The employer is not conduc ting inspection and testing of underground piping systems. Calumet failed to complete visual and UT piping inspections for any of its under ground piping systems as specified by consensus standards, such as but not limit ed to API 570. API 570 recommends a visual inspection of Class I and Class II pi ping every 5 years, and UT testing of Class I piping every 5 years and Class II piping every 10 years. Calumet did not inspect underground piping until OSHA was onsite. The following underground piping circuits did not have a visual inspect ion within the specified time frame: 1. D1501 to P1501 A/B flare drum liquid to pump 2. D1506 to sump at truck loading dock (piping was not coated and wrapped 3 . D1505 to P1517 knockout drum adjacent to treater to pump suction. The employer violated this standard on or about October 9, 2010, when it was determined that Calumet Lubricants failed to conduct inspectionss and testing of its undergroun d piping. e)The employer is not conducting inspection and testing of insulated piping. Cal umet failed to complete piping inspections for any of the insulated piping as sp ecified by consensus standards, such as but not limited to API 570. The employer has not effectively implemented its mechanical integrity program, Section 9.3 a nd 14, Corrosion Under Insulation (CUI). During this, inspection it was determin ed that Calumet did not conduct corrosion under insulation (CUI) inspections for all piping circuits located in the 100, 400, and 1100 Units. The employer viola ted this standard on or about October 9, 2010, when it was determined that Calum et Lubricants failed to conduct inspectionss and testing of its insulated piping . f)The employer is not conducting inspection and testing of deadleg piping. Cal umet failed to complete piping inspection and testing for deadleg piping, as spe cified by consensus standards, such as but not limited to API 570. The employer has not effectively implemented its mechanical integrity program, Section 3.1(b), 9.2, and 14, "Dead legs". During this, inspection it was determined that Calumet did not conduct in spections of deadleg piping for piping circuits located in the 100, 400, and 110 0 Units. Deadleg piping was identified on piping circuits such as, but limited t o the following: 400-001, 400-004, 400-005, 400-006, 400-009, 400-010, 400-013, 400-022, 400-023, 400-028,400-031, 400-032, 400-033. The employer violated this standard on or about October 9, 2010, when it was determined that Calumet Lubric ants failed to conduct inspectionss and testing of its deadleg piping. g)The emp loyer did not ensure that critical valves were inspected at a frequency consiste nt with applicable manufacturers' recommendations and good engineering practices. T he employer violated this standard on or about January 5, 2011 when an investiga tion discovered there was no documentation to indicate the following critical va lves were inspected or tested: FSV-113(900), FSV-114(900), FSV-115(900), FSV-307 (900), FSV- 309(900), FSV-310(900), FSV-311(900), and VGV 1402. The employer vio lated this standard on or about October 9, 2010, when in response to a request f or documents Calumet Lubricants-Cotton Valley did not provide information relate d to the inspection of its underground piping or piping is insulated at the refi nery. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of t his citation, the employer must submit documentation showing that it is in compl iance with the standard, including the steps that it is taking to ensure that em ployees are not being exposed to highly hazardous chemicals. The employer must include in the abatemen t plan information describing the actions it is taking to ensure that an asbesto s survey will be completed. The violation must be abated no later than 60 days f rom the receipt of this citation.
Recent events (1)
- — Z (S) $7000
1910.119 J04 II
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
1910.119(j)(4)(ii): The inspections and testing procedures did not follow recogn ized and generally accepted good engineering practices: a.The employer's inspect ions and testing procedures for collecting thickness measurements do not follow recognized and generally accepted good engineering practices such as API 510 (20 06), Section 5.6.2.1; which specifies that the thickness for all major component s (shells, heads, cone sections) and a representative sample of vessel nozzles s hould be measured and recorded. Calumet is not performing the proper inspections on the following pressure vessels: 1. T-802: Ultrasonic thickness (UT) measurem ents have not been performed. 2. T-101: UT measurements have not been performed. 3. E-302: UT measurements hav e not been performed. 4. T-401: UT measurements have not been performed. 5. RX-3 02: UT measurements have not been performed. 6. RX-305: UT measurements have not been performed. 7. D-302: UT measurements have not been performed. 8. E-301A: U T measurements have not been performed. b.The employer's inspections and testing procedures for classifying piping systems containing flammable liquids and gase s do not follow recognized and generally accepted good engineering practices suc h as API 570. API 570 classifies piping which contains C3, C4, and C5 liquids an d gases as Class 1 piping. Calumet Lubricant's inspection records classify all piping in the 400 Unit as Class II p iping. Examples of piping circuits, which should be classified as Class I becaus e they contain methane, ethane, C3, C4, or C5 liquids and gases are, such as but not limited to the following: 1. 400-08; D-210 Vent to PSV-217 Class II 2" and 3" Piping 2. 400-09; D-210 Vapors Class II 1" Piping 3. 400-10; T-401 Overhead t o E-401 Class II 6" Piping 4. 400-11; T-401 Overhead to D-401 Class II 6" Piping 5. 400-12; Reflux to T-401 Class II 2" and 3" Piping 6. 400-13; P401A/B Dischar ge Class II 1" and 2" Piping 7. 400-14; D-401 to P401A/B Suction Class II 3" Pip ing 8. 400-15; E-401 to D-401 Class II 4" Piping 9. 400-16; Makeup Gas to T-401 Class II 1" Piping 10. 400-17; D-401 Vapor to Fue l Drum Class II 2" Piping 11. 400-18; T-401 to R401SS Class II 6" Piping 12. 400 -19; R401SS to T-401 Class II 10" Piping 13. 400-20; T-401 Outlet to LCV-401 Loo p Class II 2" and 3" Piping 14. 400-21; T-401 Outlet to E-404 TS Class II 4" Pip ing Calumet is not correctly classifying piping located in the 400 Unit. API 570 recommends UT inspection of Class I piping every 5 years and Class II piping ev ery 10 years. Therefore, incorrectly classifying piping circuits will result in longer periods between inspection cycles; potentially resulting in a catastrophi c event should a pipe become too thin and rupture. c.The employer is not conducting audits of its internal inspection program to de termine if it is meeting the requirements of the inspection code. During this in spection, deficiencies such as: missing or incorrect TML locations, missing or i ncorrectly entered TML values, TML that are not reproducible, and inaccurate iso metric drawings were identified. API 570, Section 5.13 indicates that an interna l audit be conducted periodically to determine the following: 1. The requirement s and principles of this inspection code API 570 are being met; 2. All-owner use r responsibilities are being properly discharged; 3. Intervalsand extent of insp ections are adequate for covered piping systems; 4. All general types of inspect ions and surveillance are being adequately applied; 5. Inspection data analysis, evaluation, and recording are adequate; 6. All repairs, re-ratings, and alterations comply with this code. d.The employe r's inspection and testing procedures for its Risk Based Inspection (RBI)Program is not in accordance with API 580 (2009). The Calumet Lubricants RBI program do es not include or consider the following: 1. As per API 580, Section 16, RBI ass essments should be team-based and include a team leader, inspector, corrosion sp ecialist, process specialist, operations personnel, maintenance personnel, safet y and environmental manager, and management; 2. As per API 580 Section 7 the RBI assessment should have clear goals and objectives; 3. As per API 580, Section 6 .6.2 is a logical and structured process for planning and evaluating inspection activities for pressure equipment; 4. As per API 580, Section 7.3.4 the first st ep in the application of RBI is screening of entire process units to rank relative risk. The screening points ou t areas that are higher in priority and suggests which process to begin with; 5. As per API 580 an RBI plan should be completed. The Calumet Lubricants RBI prog ram has not been incorporated into, delineated or included in the Calumet Mechan ical Integrity/Quality Assurance Manual. Calumet Lubricants does not have an RBI program meeting the criteria of API 580. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentatio n showing that it is in compliance with the standard, including the steps that i t is taking to ensure that all inspection and testing procedures follow recogniz ed and generally accepted good engineering practices:g
Recent events (2)
- — F (S) $0
- — Z (S) $7000
1910.119 J04 III
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
1910.1910.119(j)(4)(iii): The frequency of inspections and tests of process equi pment conducted by the employer is not consistent with good engineering practice s. This violation was observed on or about October 4, 2010 when in response to a re quest for documents; Calumet Lubricants, Cotton Valley Louisiana, provided infor mation related to the inspection of its piping and pressure vessels at the refin ery. a)Calumet is not completing visual inspections of its pressure vessels loca ted in Units 100, 300, 400, 800, and 1100 within the timeframes specified by con sensus standards, such as but not limited, to API 510. API 510 recommends a visu al inspection of all pressure vessels a minimum of every 5 years and a UT/intern al inspection at least every 10 years. The following pressure vessels have not b een inspected in accordance with RAGAGEP, such as but not limited to API 510. Ca lumet is not completing inspections of pressure vessels as required by the equip ment manufacturer. Pressure Vessels Unit 400 Pressure Vessels 1.T-401: Thickness measurements (UT-u ltrasonic thickness) A UT inspection was not performed by the required date of S eptember 15, 2010 for two TML (6" and 1" nozzle) in accordance with API 510 and the UltraPipe assessment calculated by Calumet. 2.FB-403: was manufactured in 19 99. There is no baseline UT information available for FB-403 and no UT data has ever been collected. Corrosion rates have not been calculated as per Calumet Lub ricants, Sections 5.1 and 5.2, Frequency of Inspections, and in accordance with API 510. A UT inspection was not performed by the required date of September 201 0. Moore model 5400 fans: The required manufacturer's inspections have not been performed to include an annual inspection of the system pressure, nuts and bolts , resilient mounts, and blade tips. Cooling Products, Inc.: The required manufac turer's inspections have not been performed to include: once each month the pitc h and angle and setting of the fan blades should be carefully checked; once ever y 60 days the motor bearings should be checked and lubricated if necessary. 3.R-40 1: was manufactured in 1954. A UT inspection was not performed every ten years i n accordance with API 510 and theUltraPipe assessment calculated by Calumet Lubr icants. Only one inspection was conducted between 1995 and 2008 and the 2008 ins pection has different TML points than the July 1995 UT inspection. No corrosion rate has been calculated as in accordance with API 510. 4.D-210: The manufacture date for D-210 is unknown and this pressure vessel was put into service by Calu met prior to 1995. A UT inspection was not performed for two specific TMLs by th e required dates of June 6, 2009 and June 28, 2010 in accordance with API 510 an d the UltraPipe assessment calculated by Calumet Lubricants. One TML is beyond i ts retirement date of April 28, 2010. Unit 100 Pressure Vessels 1.T-101: The man ufacture date for T-101 is unknown. Previous internal inspection and UT inspecti on were conducted in 2005. Corrosion rates have not been calculated as per Calum et Lubricants, Sections 5.1 and 5.2, Frequency of Inspections, and in accordance with API 510. A UT inspection w as not performed for four specific TMLs by the required date of November 29, 200 8 in accordance with API 510 and the UltraPipe assessment calculated by Calumet Lubricants. No inspections have been conducted in accordance with the API 510 ti meframe requirements for the nozzles and man-ways. 2.D-102: was manufactured in 1926. A UT inspection was not performed by the required dates of July 25, 2007, March 17, 2008 and November 6, 2008 for twelve TMLs in accordance with API 510 a nd the calculated UltraPipe assessment conducted by Calumet Lubricants. One TML is beyond its retirement date of April 28, 2010. There is a November 2005 recomm endation by the Calumet inspection team to replace D-102 (aka-Desalter). 3.E-102 : A UT inspection was not performed for six TMLs by the required date of Novembe r 20, 2010 in accordance with API 510. Unit 800 Pressure Vessels 1.T-801: was ma nufactured in 1956. There is no baseline UT information available for T-801 and the design maximum allowable working pressure (MAWP) of the vessel is not known. The previous internal inspection and UT inspections were conducted in 2005. Corrosion rates have not b een calculated as per Calumet Lubricants, Sections 5.1 and 5.2, Frequency of Ins pections, and in accordance with API 510. A UT inspection was not performed by t he required date of February 15, 2010. 2.D-301: The manufacture date for D-301 i s unknown but was put into service by Calumet prior to 1997. There is no baselin e UT or external visual inspection information available for D-301. The previous internal inspection was conducted in 2008 and UT inspection was conducted in 20 03. A UT inspection was not performed by the required date of July 24, 2010 in a ccordance with the inspection dates calculated by UltraPipe and the RBI assessme nt conducted by Calumet. 3.E-301A: The last UT inspection was conducted in June 2003. Only 7 of 18 TML were actually tested; missing UT data on the shell. A UT inspection was not performed by the required date of June 1, 2010 in accordance with the inspection dates calculated by UltraPipe and the RBI assessment conduct ed by Calumet. 4.E-302A: was manufactured in 1953. The last UT inspection was co nducted in July 2003 and this is the only recorded UT inspection. Only 10 of 18 TML were actually tested; and UT data is missing on the shell. A UT inspection w as not performed by the required date of July 23, 2010 in accordance with the in spection dates calculated by UltraPipe and the RBI assessment conducted by Calumet. 5.E-302B: was manufacture d in 1953. A UT inspection was not performed for specific TML by the required da te of June 1, 2009 or July 24, 2010 in accordance with the inspection dates calc ulated by UltraPipe and the RBI assessment conducted by Calumet. 6.RX-301: UT in spections were not performed for specific TML by the required dates of November 7, 2008, September 28, 2009, and April 30, 2010 in accordance with the inspectio n dates calculated by UltraPipe and the RBI assessment conducted by Calumet. RX- 301 is missing UT data on the shell, top head and bottom head. TML point #18 has exceeded its calculated retirement date. 7.RX-302: UT inspections were not perf ormed for specific TML by the required dates of November 7, 2008 and January 9, 2009 in accordance with the inspection dates calculated by UltraPipe and the RBI assessment conducted by Calumet. RX-302 is missing UT data on the shell, top he ad, 10" outlet, and 1.5" drain. TML point #19 has exceeded its calculated retire ment date, 5/2/2009. 8.RX-305: UT inspections were not performed by the required dates of November 7, 2008 and March 24, 2010 in accordance with the inspection dates calculated by UltraPipe and the RBI assessment conducted by Cal umet. RX-305 is missing UT data on the shell, top head and bottom head. 9.D-302: was manufactured in 1958. UT inspection was not performed by the required date of July 23, 2010 in accordance with the inspection dates calculated by UltraPipe by Calumet. UT data is missing on the shell, the bottom/top and head. External visual inspection of D-302 has been not conducted every five years and an intern al visual has not been performed every ten years. 10.FB-302, FB-303, FB203B: hav e not had an external visual inspection every five years as is required by API 5 10, 6.4. 11.E-302A: was manufactured in 1953 and the only record of inspection i s in 2003. A UT inspection was not performed by the required date of July 23, 20 10, in accordance with the inspection dates calculated by UltraPipe and used by Calumet Lubricants. 12.V-103: has not had an external visual inspection every fi ve years as is required by API 510, 6.4. Relief System Pressure Vessels 1.D-1501(knockout drum): was manufactured in 1947. D-1501 has not had an externa l visual inspection every five years as is required by API 510, 6.4. There has b een no UT inspection on this vessel since August 1984; hence, no internal or thi ckness measurement inspections have been conducted in the past ten years. 2.D-15 05 (knockout drum): was manufactured in 1970. D-1505 has not had an external vis ual inspection every five years as is required by API 510, 6.4. There has been n o UT inspection on this vessel since August 1976; hence, no internal or thicknes s measurement inspections have been conducted in the past ten years. b)Calumet i s not completing visual inspections of its piping systems located in the 100, 40 0, 1100, Treater and hydrotreater units within the timeframes specified by conse nsus standards, such as but not limited to, API 570. API 570 indicates that a vi sual inspection of Class I and Class II piping be performed every 5 years. API 5 70 also states that thickness measurements be performed every 5 years for Class I piping and every 10 years for Class II piping. The following piping circuits d id not have a visual and/or thickness measurements in accordance with API 570. Hydrotre ater Unit-Piping Circuits 1.HT030 Compressed gas HRG to E303 Class II 6"Piping: Thickness measurements- UT (UT-ultrasonic thickness) inspections were not perfor med by the required date of June 1, 2010 in accordance with UltraPipe and the RB I assessment calculated by Calumet. Calumet hasnot performed a visual inspection of this piping circuit every five years as is required by API 510, Table 6-1. 2 .HT030A Compressed gas HRG to FB-301 Class II 6"Piping: UT inspections were not performed by the required date of June 1, 2010 in accordance with the RBI assess ment conducted by Calumet. Calumet has not performed a visual inspection of this piping circuit every five years as is required by API 510, Table 6-1. 3.HT029 C ompressed gas RX304 to RX305 Class II 6" Piping: UT inspections were not perform ed by the required date of June 1, 2010 in accordance with the RBI assessment co nducted by Calumet. TMLs have not been established for TML points 1, 2, 6, and 7 . Calumet has not performed a visual inspection of this piping circuit every fiv e years as is required by API 510, Table 6-1. 4.HT019 RX-305 Bottoms to D-301 Class II 4 " and 6" Piping: UT inspections were not performed by the required date of June 1, 2010 in accordance with the RBI assessment conducted by Calumet. Calumet has not performed a visual inspection of this piping circuit every five years as is required by API 510, Table 6-1. 5.HT018 Compressed gas E302 to FB-301 Class II 4 " Piping: UT inspections were not performed by the required date of June 1, 2010 in accordance with the RBI assessment conducted by Calumet. Calumet has not per formed a visual inspection of this piping circuit every five years as is require d by API 510, Table 6-1. TML ports are missing on the insulated portion of the p iping. 6.HT015 D301-D303 Class II 3" Piping: UT inspections were not performed b y the required date of 6/1/10 in accordance with the RBI assessment conducted by Calumet. Calumet has not performed a visual inspection of this piping circuit e very five years as is required by API 510, Table 6-1. 7.HT009 E304- H301 Class I I 3" Piping: UT inspections were not performed by the required date of June 1, 2 010 in accordance with the RBI assessment conducted by Calumet. Calumet has not performed a visual inspecti on of this piping circuit every five years as is required by API 510, Table 6-1. TML ports are missing on the insulated portion of the piping. 8.HT007A HT-006-E 304C Class II 2" Piping: UT inspections were not performed by the required date of June 1, 2010 in accordance with the RBI assessment conducted by Calumet. Calu met has not performed a visual inspection of this piping circuit every five year s as is required byAPI 510, Table 6-1. 9.HT007 P301A/B-E301D Class II 3" Piping: UT inspections were not performed by the required date of June 1, 2010 in accor dance with the RBI assessment conducted by Calumet. Calumet has not performed a visual inspection of this piping circuit every five years as is required by API 510, Table 6-1. 10.HT004 D301-P-304A/B Class II 3" Piping: UT inspections were n ot performed by the required date of June 1, 2010 in accordance with the RBI ass essment conducted by Calumet. Calumet has not performed a visual inspection of t his piping circuit every five years as is required by API 510, Table 6-1. 11.HT003A P-304A/B Discharge-D304 Class II 3" Piping: UT inspections were not pe rformed by the required date of June 1, 2010 in accordance with the RBI assessme nt conducted by Calumet. Calumet has not performed a visual inspection of this p iping circuit every five years as is required by API 510, Table 6-1. 12.HT002A P 304A/B-E-302A/B Class II 3" Piping: UT inspections were not performed by the req uired date of 6/1/10 in accordance with the RBI assessment conducted by Calumet. Calumet has not performed a visual inspection of this piping circuit every five years as is required by API 510, Table 6-1. Treater Unit Piping 1.T-050 caustic from D509D-D-509B/C Class II 3/4" Piping: UT inspections were not performed by the required date of March 10, 2009 in accordance with the UltraPipe assessment conducted by Calumet. 2.T-051 caustic from D509A-D-509D Class II 2" Piping: UT i nspections were not performed by the required date of March 10, 2009 in accordan ce with the UltraPipe assessment conducted by Calumet. 400 Unit Piping Calumet has not performed a visual inspection of piping circuits 400-01 to 400-3 3 every five years as is required by API 570, Table 6-1. The following piping ci rcuits were not inspected: 1.400-01; D-210 to Tank 41 Class II Piping 2.400-02; D-210-Tank 41 Class II 2" Piping 3.400-03; D-210-T-800 Class II 1.5" Piping 4.40 0-04; D-210 from D101/1101 Class II 2" and 3" Piping 5.400-05; D-210 to P204A/B Class II 2" and 3" Piping 6.400-06; P204A/B Discharge to H-202 Class II 2" Pipin g 7.400-07; 2"-HL-400-004-1A1A Class II 2" Piping 8.400-08; D-210 Vent to PSV-21 7 Class II 2" and 3" Piping 9.400-09; D-210 Vapors Class II 1" Piping 10.400-10; T-401 Overhead to E-401 Class II 6" Piping:Calumet has not performed a visual inspection of this piping circuit every five years as is requ ired by API 570, Table 6-1. Also, baseline UT data was not collected on an injec tion point (which was leaking) and UT inspections of injection points on this pi peline circuit were not collected every three years in accordance with API 570, Table 6-1. 11.400-11; T-401 Overhead to D-401 Class II 6" Piping 12.400-12; Refl ux to T-401 Class II 2" and 3" Piping 13.400-13; P401A/B Discharge Class II 1" a nd 2" Piping 14.400-14; D-401 to P401A/B Suction Class II 3" Piping 15.400-15; E -401 to D-401 Class II 4" Piping 16.400-16; Makeup Gas to T-401 Class II 1" Pipi ng 17.400-17; D-401 Vapor to Fuel Drum Class II 2" Piping 18.400-18; T-401 to R4 01SS Class II 6" Piping 19.400-19; R401SS to T-401 Class II 10" Piping 20.400-20; T-401 Outlet to LCV-401 Loop Class II 2" and 3" Piping:Calumet has no t performed a visual inspection of this piping circuit every five years as is re quired by API 570, Table 6-1. Also, only eight of twenty TMLs established has UT data; therefore UT measurements are not collected in accordance with API 570. 2 1.400-21; T-401 Outlet to E-404 TS Class II 4" Piping:Calumet has notperformed a visual inspection of this piping circuit every five years as is required by API 510, Table 6-1. Also, only six of thirty-eight TMLs established has UT data; th erefore UT measurements are not collected in accordance with API 570. 22.400-22; T-401 to E-403A/B/C Class II 3", 4" and 6" Piping:Calumet has not performed a v isual inspection of this piping circuit every five years as is required by API 5 10, Table 6-1. Also, only one of twenty- five TMLs established has UT data; ther efore UT measurements are not collected in accordance with API 570. 23.400-23; T -401 Outlet to E-403A/B/C Class II 3" Piping:Calumet has not performed a visual inspection of this piping circuit every five years as is required by API 510, Ta ble 6-1. Also, only two of nineteen TMLs established has UT data; therefore UT m easurements are not collected in accordance with API 570. 24.400-24; E-403A/B/C to E-404 Class II 3" Piping:Ca lumet has not performed a visual inspection of this piping circuit every five ye ars as is required by API 510, Table 6-1. Also, no UT data has been collected fo r this circuit; therefore UT measurements are not collected in accordance with A PI 570. 25.400-25; E-403A/B/C to E-404 Class II 3" Piping:Calumet has not perfor med a visual inspection of this piping circuit every five years as is required b y API 510, Table 6-1. Also, only six of twenty-three TMLs established has UT dat a; therefore UT measurements are not collected in accordance with API 570. 26.40 0-26; E-404 to Inlet/Outlet Class II 3" Piping 27.400-27; E-404 to Inlet/Outlet Class II 3" Piping 28.400-28; FB-403 Outlet to Manifold Class II 3" Piping 29.40 0-29; FB-403 Outlet to Manifold Class II 3" Piping 30.400-30; FB-403 Outlet to M anifold Class II 2" Piping 31.400-31; E-204 Bypass to T-401 Class II 3"and "4 Piping 32.400-32; E-204 SS In /Out Class II 3"and 4" Piping:Calumet has not performed a visual inspection of t his piping circuit every five years as is required by API 570, Table 6-1. Also, only six of twenty-eight TMLs established has UT data; therefore UT measurements are not collected in accordance with API 570.33.400-33; H202 Hot Oil to T-401 C lass II 4" Piping:Calumet has not performed a visual inspection of this piping c ircuit every five years as is required by API 570, Table 6-1. Also, no UT data h as been collected for this circuit; therefore UT measurements are not collected in accordance with API 570. 100 Unit Piping Calumet has not performed a visual i nspection of piping circuit C-001 to C- 004; C-007 to C-020; and C-022 to C-040 every five years as is required by API 570, Table 6-1. The following piping circ uits were not inspected: Some UT inspections conducted provided UT data which wa s either anomalous or unreliable. These TMLs are then placed in a 5-10 year cycl e without retesting to determine an accurate reading. Consequently, the data col lected for these TML do not meet the frequency of testing requirements in accordance wi th API 570. 1.C-001 P-101 A/B to E-101A Class II 4" Piping 2.C-001A E-101 A/B to E-102 Class II 4" Piping 3.C-002 E-101A Shell side to E-101B Shell side Class I I 12" Piping 4.C-003 T-101 to E-101A/B Class II 12" Piping:Baseline UT data was not collected on injection points and UT inspections of injection points on this pipeline circuit were not collected every three years in accordance with API 57 0, Table 6-1. A UT inspection was not performed for TML 6 by the required date o f 11/16/2005 in accordance with API 570 and the calculated UltraPipe assessment conducted by Calumet. 5.C-004 H-101 to T-101 Class II 4" and 8" Piping:Calumet h as not performed a visual inspection of this piping circuit every five years as is required by API 570, Table 6-1. A UT inspection was not performed for TML 4 b y the required date of 11/17/2005 in accordance with API 570 and the calculated UltraPipe assessment conducted by Calumet. 6.C-007 E-102 to T-101/B Class II 2" Piping 7.C-008 T-101C to T-101 Class II 4" Piping:Calumet has not performed a visual inspection of this piping circuit ever y five years as is required by API 570, Table 6-1. A UT inspection was not perfo rmed for TML 4 by the required date of 11/14/2005 in accordance with API 570 and the calculated UltraPipe assessment conducted by Calumet. 8.C-009 T-101B to T-1 01 Class II 4" Piping:Calumet has not performed a visual inspection of this pipi ng circuit every five years as is required by API 570, Table 6-1. 9.C-010 T-101A to T-101 Class II 4" Piping:Calumet has not performed a visual inspection of th is piping circuit every five years as is required by API 570, Table 6-1. 10.C-01 1 T-101C to E-105 Shell side Class II 2" Piping:Calumet has not performed a visu al inspection of this piping circuit every five years as is required by API 570, Table 6-1. 11.C-012 T-101 to T-101C Class II 3" Piping:Calumet has not performe d a visual inspection of this piping circuit every five years as is required by API 570, Table 6-1. A UT inspection was not performed for TML 1,7,8 by the required date of 11/14/2005. 12.C-013 T-101 to T-101A Class II 3" P iping:Calumet has not performed a visual inspection of this piping circuit every five years as is required by API 570, Table 6-1. A UT inspection was not perfor med for TML 1, 4, 5 by the required date of 11/14/2005. 13.C-014 T-101 to T-101B Class II 3" Piping:Calumet has not performed a visual inspection of this piping circuit every five years as is required by API 570, Table 6-1. A UT inspection was not performed for TML 1, 2, 3 by the required date of 11/14/2005. 14.C-015 T -101A to FB-101 Class II 3" Piping 15.C-016 P-101 Discharge to Tank 39 Class II 2" Piping 16.C-017 FB-7 to P-101A Class II 2" Piping 17.C-018 E-102 Shell side t o FB-7 Class II 2" Piping 18.C-019 FB-101B-1/2 to P-106 Class II 2" Piping:Calum et has not performed a visual inspection of this piping circuit every five years as is required by API 570, Table 6-1. 19.C-020 E-105 Shell side to FB-101C Class II 2" Piping:Calumet has not performe d a visual inspection of this piping circuit every five years as is required by API 570, Table 6-1. 20.C-022 P-101C Discharge to Tank 39 Class II 2" Piping:Calu met has not performed a visual inspection of this piping circuit every five year s as is required by API 570, Table 6-1..21. C-023 Natural Gas to H-101 3"and 4" Class II 2" Piping 22.C-024 H-101 Heater Inlet from E-707 and E-715 Class II 6" Piping: Calumet has not performed a visual inspection of this piping circuit eve ry five years as is required by API 570, Table 6-1. 23.C-025 FB-101C Fin Fan to D-103 and 29 Tank Class II 2" Piping 24.C-026 P101-B to 39 and 29 Tanks Class II 2" Piping 25.C-027 D-101 and P-104A/B Class II 4" and 6" Piping:Calumet has not performed a visual inspection of this piping circuit every five years as is req uired by API 570, Table 6-1. 26.C-028 P-104A/B Discharge Class II 4" Piping:Calu met has not performed a visual inspection of this piping circuit every five years as is requ ired by API 570, Table 6-1. 27.C-029 P-104A/B to T-101 Reflux Class II 4" Piping 28.C-030 E-105 to D-102 Desalter Class II 4" Piping 29.C-031 D-101 to Fuel Gas Class II 2" Piping:Calumet has not performed a visual inspection of this piping circuit every five years as is required by API 570, Table 6-1. A UT inspection w as not performed for TML 1, and 2 by the required date of 11/14/2005. No UT insp ection has been performed for TML 4, 5, 6, 7 in accordance with API 570. 30.C-03 2 T-101 to P-103 A/B Suction Class II 4" Piping:Calumet has not performed a visu al inspection of this piping circuit every five years as is required by API 570, Table 6-1. 31.C-033 P-103 A/B Discharge to D-700 Class II 3" Piping:Calumet has not performed a visual inspection of this piping circuit every five years as is required by API 570, Table 6-1. A UT inspection was not performed for TML 1, an d 2 by the required date of 11/14/2005. 32.C-034 P-103 A/B Discharge Class II 3" Piping:Calumet has not performed a visual inspection of this piping circuit every five years as is requ ired by API 570, Table 6-1. A UT inspection was not performed for TML 3 and 4 by the required date of 11/14/2005. 34.C-035 FB-101 to D-101 and E-103 Class II 6" Piping 35.C-036 D-102 to 700 Charge Drum Class II 6" Piping:Calumet has not per formed a visual inspection of this piping circuit every five years asis required by API 570, Table 6-1. A UT inspection was not performed for TML 2 by the requi red date of 11/14/2005 and TML 4 by the required date 1/18/2009. 36.C-037 D-102 to E-102 and E-105 Class II 4" Piping:Calumet has not performed a visual inspect ion of this piping circuit every five years as is required by API 570, Table 6-1 . A UT inspection was not performed for TML 1 and 3 by the required date of 11/1 4/2005. 37.C-038 E-105 to D-102 Class II 4" Piping:Calumet has not performed a v isual inspection of this piping circuit every five years as is required by API 5 70, Table 6-1. 38.C-039 Crude Pumparound from SK-37 to SK-37:Calumet has not per formed a visual inspection of this piping circuit every five years as is required by API 570, Table 6-1. 39.C-040 E-102 to E-105 Class II 4" Piping 4" 1100 Unit Piping Calumet has not performed a visual inspection of piping circui t 1100-01 to 1100-26 every five years as is required by API 570, Table 6-1. The following piping circuits were not inspected: 1.11-001 H-1101 to T-1101 Class II 6" Piping:Calumet has not performed a visual inspection of this piping circuit every five years as is required by API 510, Table 6-1. Only two of five establis hed TMLs has UT data; therefore UT measurements have not been collected every 10 years in accordance with API 570 and the Calumet RBI assessment. No baseline UT data was collected and no corrosion rate for this piping circuit has been estab lished in accordance with API 570, Section 7.1.2. TML ports are missing on the i nsulated portion of the piping. 2.11-001A H-1101 Outlet to T-1101 Class II 6" Pi ping 3.11-002 T-1101 to T-1102 Class II 8" Piping 4.11-003 P-1101 A/B Suction from T-1102 Class II 8" Piping 5.11-004 P-1101 A/B D ischarge to T-1101 Class II 8" Piping:Calumet has not performed a visual inspect ion of this piping circuit every five years as is required by API 570, Table 6-1 . Only one of six established TMLs has UT data; therefore UT measurements have n ot been collected every 10 years in accordance with API 570 and the Calumet RBI assessment. No baseline UT data was collected and no corrosionrate has been esta blished for the TMLs not tested in accordance with API 570, Section 7.1.2. TML p orts are not accurately reflected on the isometric drawing. 6.11-005 T-1102 Over head to E-1102 Class II 4" and 8" Piping 7.11-006 T-1102 to D-1102 Class II 4" a nd 8" Piping 8.11-007 Feed to T-1102A from T-1102 Class II 3" Piping 9.11-008 T- 1102A from T-1102 Class II 3" Piping 10.11-009 T-1102A to E-1102 Class II 2" Pip ing 11.11-011 T-1101 Bottom Outlet Class II 2" Piping 12.11-012 H-1101 Inlet from E- 707 Class II 3" Piping 13.11-013 FB-1101 & E-1101 to D-1101 Class II 4" Piping 1 4.11-014 FB-1101 Outlet to TCV-110A Class II 4" Piping 15.11-015 E-1101 Outlet t o FB-1101 Class II 4" Piping 16.11-016 D-1101 Relief Class II 2" Piping:Calumet has not performed a visual inspection of this piping circuit every five years as is required by API 510, Table 6-1. Only one of two established TMLs has UT data ; therefore UT measurements have not been collected every 10 years in accordance with API 570 and the Calumet RBI assessment. No baseline UT data was collected and no corrosion rate has been established for the TMLs not tested in accordance with API 570, Section 7.1.2. TML ports are not accurately reflected on the isom etric drawing. 17.11-017 P-1102 A/B Suction Class II 2" and 3"Piping 18.11-018 F B-1102 Outlet to Storage Class II 2" Piping 19.11-019 FB-1102 Outlet to Storage Class II 2" Piping 20.11-020 D-1101 Outlet t o Blue Drum 1 Class II 1" Piping 21.11-021 Inlet to E-1101 Class II 4" Piping 22 .11-022 E-1101 Tube Side to E-1102 Class II 4" Piping 23.11-023 E-1102 Inlet Tub e Side Class II 4" Piping24.11-024 E-1102 to FB-1103 Class II 4" Piping 25.11-02 5 FB-1103 to Storage Class II 2" Piping 26.11-026 H-203 Inlet/Outlet Class II 2" Piping Relief System Piping Circuits 1.Calumet has not performed a visual inspe ction or UT inspection of the flare system piping circuits FH-1 to FH-20 as is r equired by API 570, Table 6-1. Pursuant to 29 CFR 1903.19(d), within 10 days, th e employer must submit an abatement plan describing the actions it is taking to ensure that an a visual inspection i s completed. The violation must be abated no later than 60 days from the receipt of this citation.
Recent events (2)
- — F (S) $0
- — Z (S) $7000
1910.119 J05
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment th at were outside acceptable limits (as defined by process information in 29 CFR 1 910.119(d) before further use or in a safe and timely manner: a)The employer doe s not correct deficiencies in equipment that are outside acceptable limits (defi ned by the process safety information in paragraph (d) of this section) before f urther use or in a safe and timely manner when necessary means are taken to assu re safe operation. As described in the 2001 Calumet Lubricants Flare Study, cond ucted by Jacob and Associates LLC, the "Tower T-803 Fin Fan Failure" scenario in dicated that PSV-809, protecting T-803, set at 90 psig, size 4 x P x 6, would re lieve at the rate of 68933 lbs/hr. The current flare system in service onsite is designed for a maximum flow of 50,695 lbs/hr. As a result, should T-803 experience a fin fan failure (loss of cooling), the potential relieving flow would overpower the existing flare. As per P&ID SOL-A- 021A, PSV-809 is currently in service with a consolidated valve, style 1905PC-2, size 4 x P x 6, serial number TM03316. By n ot correcting deficiencies in equipment that are outside acceptable limits befor e further use or in a safe and timely manner, employees are exposed to potential equipment failures which can result in serious injury or death. This may be a s ystem-wide occurrence which would require the re-evaluation of all PSV's and fla re equipment design throughout the facility. This violation was documented on or about December 20, 2010. b)The employer does not correct deficiencies in equipm ent that are outside acceptable limits (defined by the process safety information in paragraph (d) of this section) bef ore further use or in a safe and timely manner when necessary means are taken to assure safe operation. As described in the 2001 Calumet Lubricants Flare Study, conducted by Jacob and Associates LLC, the "Tower T-700 Fin Fan Failure" scenar io indicated that PSV-702, protecting T-700, set at 115 psig, size 4 x M x 6, wo uld relieve at the rate of 117753 lbs/hr. The current flare system in service on site is designed for a maximum flow of 50,695 lbs/hr. As a result, should T-700 experience a fin fan failure (loss of cooling), the potential relieving flow wou ld overpower the existing flare. As per P&ID 700-A-003, PSV-702 is currently in service with a consolidated valve, style 1905MT-1, size 4 x M x 6, serial number TG-58158. By not correcting deficiencies in equipment that are outside acceptab le limits before further use or in a safe and timely manner, employees are expos ed to potential equipment failures which can result in serious injury or death. This may be a system-wide occurrence which would require the re -evaluation of all PSV's and flare equipment design throughout the facility. Thi s violation was documented on or about December 20, 2010. c)The employer does no t correct deficiencies in equipment that are outside acceptable limits (defined by the process safety information in paragraph (d) of this section) before furth er use or in a safe and timely manner when necessary means are taken to assure s afe operation. As described in the 2001 Calumet Lubricants Flare Study, conducte d by Jacob and Associates LLC, PSV-701 was undersized and not adequate based upo n the fire case relief scenario. As stated under the "Zone 8" summary, finding 1 , "Relief valve PSV-701 needs to be changed; it is not adequate, the relief valv e should be changed to a 1.5 x G x 2.5." Calculations in the relief study were b ased upon the larger"G" orifice size. Without a "G" orifice, per the flare study , the valve is too small. In 2008, nearly 7 years after the flare study was comple ted, the employer responded to the change stating the "valve never installed bec ause it was determined adequate protection was available with existing valve and equalization line to T-700." No additional design data or calculations were pro vided to support keeping the older, smaller valve in service. No adjustment to t he flare study was made to show a smaller valve orifice was adequate. Field veri fication of PSV-701 indicated a valve size "1 x E x 5" was currently present on D-700. By not correcting deficiencies in equipment that are outside acceptable l imits before further use or in a safe and timely manner, employees are exposed t o potential equipment failures which can result in serious injury or death. This may be a system- wide occurrence which would require the re-evaluation of all P SV's and flare equipment design throughout the facility. This violation was docu mented on or about December 20, 2010. d)Calumet is not ensuring that employees occupy buildings (containing cont rol equipment) which are adequately protected (i.e., adequately protected by sep aration or building construction) thereby exposing them to explosion, fire, toxi c material, corrosive material, or high pressure hazards resulting from the rele ase of highly hazardous chemicals from process equipment, in the 100, 400, and 1 100 Units. The building located in an unacceptable blast zone area is the facili ty control room. The control room is subject to potential overpressures of 14.7 psi. This building also does not comply with current RAGAGEP, such as but not li mited to API 752. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of t he date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including the steps that it is taking to en sure that employees are not being exposed to highly hazardous chemicals.
Recent events (2)
- — F (S) $0
- — Z (S) $7000
1910.119 J06 III
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(j)(6)(iii): The employer did not assure that maintenance materia ls, spare parts and equipment were suitable for the process application for whic h they were used: The employer does not ensure that all equipment is suitable fo r the process application. Six of the flanges in the 1100 Unit are not rated to hold the maximum pressure of the process. The design pressure and temperature of the following circuits exceeded the flange rating according to ASME B16.5. a.On drawing 11-018-1.00-8.00 the design pressure and temperature of the circuit is 145 psig and 650 degrees Fahrenheit. The flanges are rated at 150 psig. Accordin g to ASME B16.5, a flange rated to 150 psi at the above temperature can only wit hstand 125 psig. thus exceeding the design pressure of 145 psig. b.On drawing 11 -013-1.00-7.00 the design pressure and temperature of the circuit is 145 psig and 650 degrees Fahrenheit. The flanges are rated at 150 psig. Accordin g to ASME B16.5, a flange rated to 150 psi at the above temperature can only wit hstand 125 psig. thus exceeding the design pressure of 145 psig. c.On drawing 11 -017-1.00-8.00 the design pressure and temperature of the circuit is 145 psig an d 650 degrees Fahrenheit. The flanges are rated at 150 psig. According to ASME B 16.5, a flange rated to 150 psi at the above temperature can only withstand 125 psig. thus exceeding the design pressure of 145 psig. d.On drawing 11-020-1.00-1 .00 the design pressure and temperature of the circuit is 145 psig and 650 degre es Fahrenheit. The flanges are rated at 150 psig. According to ASME B16.5, a fla nge rated to 150 psi at the above temperature can only withstand 125 psig. thus exceeding the design pressure of 145 psig. e.On drawing 11-019-1.00-6.00 the des ign pressure and temperature of the circuit is 145 psig and 650 degrees Fahrenhe it. The flanges are rated at 150 psig. According to ASME B16.5, a flange rated to 150 psi at the above temperature can only withs tand 125 psig. thus exceeding the design pressure of 145 psig. f.On drawing 11-0 11A-1.00-9.00 the design pressure and temperature of the circuit is 145 psig and 650 degrees Fahrenheit. The flanges are rated at 150 psig. According to ASME B1 6.5, a flange rated to 150 psi at the above temperature can only withstand 125 p sig. thus exceeding the design pressure of 145 psig. The lower rated flanges cre ate an explosion hazard. This violation was noted on or about September 23, 2010 . Pursuant to 29 CFR 1903.19, within 10 working days of the date of the citation , the employer must submit documentation proving that it is in compliance with t he standard, including the steps that it is taking to ensure that employees are not being exposed to the explosion hazard.on
Recent events (2)
- — F (S) $0
- — Z (S) $7000
1910.119 L01
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 C.F.R. 1910.119(l)(1) The employer did not establish and implement written pr ocedures to manage changes (except for "replacements in kind") to process chemic als, technology, equipment, and procedures; and, changes to facilities that affect a covered process: a)The employer does not establish and implement written procedu res when there are changes in process equipment. Calumet did not establish writt en procedures to manage change when they operated a pressure vessel T-101 (leaki ng light hydrocarbons) which had a small hole present at the top of the vessel; and then continued to operate the pressure vessel with a temporary weld patch. C rude Tower, T-101 is designed to operate as-built, and any change from the origi nal design (operating the Tower with a hole and/or operating the tower with a te mporary patch is a change from original design. Crude Tower, T-101 is designed t o operate as-built, and any change from the original design (operating the Tower with a hole and/or operating the tower with a temporary patch is a change from original design. The unit was operated with light hydrocarbons being released for at least two da ys. This exposes employees to fire and explosion hazards. The violation was docu mented on or about October 28, 2010. b)The employer does not complete MOCs for a throughput increase and any potential effects the increase might have on the ad equacy of the current process, including the existing relief system. As provided by the employer, throughput design changes were made in 2002 for the 1100 Crude Unit to increase throughput to 3600 Barrels Per Day (BPD). The employer stated that in place of an MOC, a PHA would be conducted. Review of the 1100 Crude Unit PHA, dated 4/16/2002, did not identify where throughput was assessed, nor was a n MOC conducted. Data supporting evidence of evaluation, consultation with the r efinery's engineering/technical staff, and whether the existing/current engineer ing analysis of the relief system is adequate for the new unit throughput is not in the PHA and not in an MOC. A detailed revi ew of the relief system and associated capacity is critical during any change to ensure the current system can appropriately function with increased throughput. This violation was documented on or about December 20, 2010. Pursuant to 29 C. F. R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it is in compliance with the standard, including describing the steps it is taking to ensure MOCs are conducted for all changes (except for "replacements in kind") to process chemicals, technology, equipment, and procedures; and, changes to facilities that affect a covered process.
Recent events (1)
- — Z (S) $7000
1910.119 L02 II
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(l)(2)(ii): The written procedures to manage changes did not assu re that the impact of the change on safety and health was addressed prior to any change: a) The employer does not address all potential safety and health impacts of the change in the MOC procedure prior to the change. Review of MOC #2005-03, to allo w the hydrotreater throughput to increase to 5100 BPD, does not include the asse ssment of pressure relief systems. Per the MOC 2005-03 summary sheet, "PSV/Safet y Systems/Shutdowns" is not checked off on the list and no supporting documentat ion was provided demonstrating a review. No notes or indications on the MOC form show that the relief system was assessed and determined to be sufficient with t he throughput increase. By not fully evaluating all potential safety and health impacts, the employer was potentially deprived of critical information used to d etermine if the change is safe. This violation was documented on or about Decemb er 20, 2010. b) The employer does not address all potential safety and health im pacts of the change in the MOC procedure prior to the change. Review of MOC #200 2-13, 100/700 Unit feed train, does not include the assessment of pressure relief systems. Per documents provided, this MOC was conducted as a result of a throughput increase to 12000 BPD in the 100/700 Unit. Per the MOC 2002-13 summary sheet, "PSV/Safety Systems/ Shutdowns" is not checked off on the list and no supporting documentation was pr ovided demonstrating a review. No notes or indications on the MOC form show that the relief system was assessed and determined to be sufficient with the through put increase. By not fully evaluating all potential safety and health impacts, t he employer was potentially deprived of critical information used to determine i f the change is safe. This violation was documented on or about December 20, 201 0. c) The employer does not address all potential safety and health impacts of t he change in the MOC procedure prior to the change. Review of MOC #2002-49, T-70 0 Diesel Recovery Project, does not include the assessment of pressure relief sy stems. Per documents provided, this MOC was conducted as part of a redesign to enable Calumet Cotton Valley to recover diesel put of the resid bottoms. Per the MOC 2002-49 summary sheet, "PSV /Safety Systems/Shutdowns" is not checked off on the list and no supporting docu mentation was provided demonstrating a review. No notes or indications on the MO C form show that the relief system was assessed and determined to be sufficient with the throughput increase. By not fully evaluating all potential safety and h ealth impacts, the employer was potentially deprived of critical information use d to determine if the change is safe. This violation was documented on or about December 20, 2010. d) The employer does not address all potential safety and hea lth impacts of the change in the MOC procedure prior to the change. Review of MO C #2005-04, Solvents Unit Capacity Increase to 5100 BPD, does not include the as sessment of pressure relief systems. Per documents provided, this MOC was conduc ted as part of a redesign to increase throughput in the Solvents Unit to 5100 BPD. Per the MOC 2005-04 summary sheet, "PSV/Safety Sy stems/Shutdowns" is not checked off on the list and no supporting documentation was provided demonstrating a review. No notes or indications on the MOC form sho w that the relief system was assessed and determined to be sufficient with the t hroughput increase. By not fully evaluating all potential safety and health impa cts, the employer was potentially deprived ofcritical information used to determ ine if the change is safe. This violation was documented on or about December 20 , 2010. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in com pliance with the standard, including the steps that it is taking to ensure that ensure that management of change documentation is completed and employees are no t being exposed to highly hazardous chemicals.
Recent events (2)
- — F (S) $0
- — Z (S) $7000
1910.119 M01
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(m)(1): The employer did not investigate each incident which resulted in, or could reasonably have resulted in a catastrophic release of high ly hazardous chemical in the workplace: The employer does not investigate each i ncident which could reasonably have resulted in a catastrophic release of a high ly hazardous chemical in the workplace. Calumet Lubricants did not conduct an in cident investigation of an incident which occurred on May 4, 2010, involving pre ssure vessel, T-101 (tower). The tower was shut down due to a hydrocarbon leak, caused by a small hole in the metal at the top of the vessel. No incident report was completed for this incident. The materials at the top of the tower included light hydrocarbons, which are highly flammable; exposing employees to fire and explosion hazards. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit an abatement plan describing the actions it is taking to en sure that all incidents are investigated.
Recent events (1)
- — Z (S) $7000
1910.119 O04
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $5,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(o)(4): The employer did not promptly determine and document an a ppropriate response to each of the findings of the compliance audit, and documen t that deficiencies have been corrected: Calumet does not promptly determine and document an appropriate response to recommendations contained in their complian ce audits. a.The May 23, 1998; September 28, 1998; August 15, 2005; and December 8, 2008, Compliance Audits include recommendations to address compliance audit findings in a timely manner. This audit item has not been resolved as some recom mendations are still not resloved. Recommendations from the compliance audits to : "develop consequences of deviations and steps to correct for all critical limi ts and a recommendation to address lockout /tagout procedures that do not meet a ll requirements"; have not been addressed or the correction was not documented. b.T he September 28, 1998, Compliance Audit includes a recommendation to "develop co nsequences of deviations and steps to correct for all defined critical operating limits. Calumet has still not listed the consequences of deviation and steps to correct deviations for all operational parameters. Recommendations from a compl iance audit indicate the Facility's Process Safety Management program has defici encies that require correction. These deficiencies can lead to catastrophic even ts which would expose employees to fire and explosion hazards. Pursuant to 29 CF R 1903.19, within ten (10) calendar days of the abatement date, the employer mus t submit an abatement plan describing the actions it is taking to ensure that th ey promptly determine and document an appropriate response to each of the findin gs of the compliance audit, and document that deficiencies have been corrected.
Recent events (2)
- — F (O) $7000
- — Z (S) $5000
1910.134 F02
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,500 · Current $7,000
General-duty citation text
29 CFR 1910.134(f)(2): The employer failed to ensure that employees using a tigh t-fitting facepiece respirator were fit tested prior to initial use of the respi rator, whenever a different respirator facepiece (size, style, model, or make) i s used, and at least annually thereafter: The employer does not ensure that empl oyee(s) required to use half-face respirators are fit tested at least annually. The employer does not reschedule employee(s) who fail their annual fit test. Thi s violation was documented on or about September 22, 2010. Pursuant to 29 CFR 19 03.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, in cluding the steps that it is taking to ensure that employees are not being expos ed to the hazard of inhaling airborne contaminants.
Recent events (2)
- — F (O) $7000
- — Z (S) $1500
1910.134 F05
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(f)(5): The employer did not ensure that employees using a tight- fitting facepiece respirator pass a qualitative fit test (QLFT) or a quantitativ e fit test (QNFT) that meets the guidelines contained in Appendix A of the standard: The employer does not en sure employee(s) who are required to use half-face respirators are clean shaven. Paragraph nine of mandatory Appendix A of the standard prohibits fit tests on t hose employee(s) with facial hair. The employer allowed four respirator users wi th facial hair to be fit tested and use respiratory protection in the refinery. This violation was documented on or about September 22, 2010. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of this citation, the employ er must submit documentation showing that it is in compliance with the standard, including the steps that it is taking to ensure that employees are not being ex posed to the hazard of inhaling airborne contaminants.
Recent events (2)
- — F (O) $0
- — Z (S) $0
1910.134 H03 IB
- Issued
- Mar 14, 2011
- Abate by
- Mar 27, 2011
- Penalty
- Initial $2,500 · Current $7,000
General-duty citation text
29 CFR 1910.134(h)(3)(i)(B): The employer did not ensure that emergency use resp irators were inspected at least monthly: Calumet is not inspecting the following emergency use respirators located in the control room on a monthly basis: Emergency escape respirators: MSA-1 LT29073 ISI-2 L13509 MSA-3 LT29029 MSA-4 LT29022 MSA-5 LT29021 North-6 LT05169 ISI Prin ceton L13206 This violation was observed on or about December 6, 2010, when in r esponse to a request for documents, Calumet Lubricants Co. at Cotton Valley fail ed to provide written documents that indicated that monthly inspections of its emergency use respirators were being p erformed. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in c ompliance with the standard, including the steps that it is taking to ensure tha t employees are being protected from respiratory hazards.ory
Recent events (2)
- — F (S) $7000
- — Z (S) $2500
1910.134 H03 III
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(h)(3)(iii): The employer did not ensure that all self-contained breathing apparatus were inspected monthly with a determination made that the re gulator and warning device functioned properly: Calumet is not inspecting the se lf-contained breathing apparatus located in the control room on a monthly basis to include a check to determine that the regulator and warning devices function properly. Calumet is not inspecting the Scott Carbon HP-60 (OP43695 and OP43748) self- contained breathing apparatus with the SKA PAK 2216 (Y212458) escape bott le on a monthly basis. This violation was observed on or about December 6, 2010 when in response to a request for documents Calumet Lubricants-Cotton Valley did not provide wri tten documents certifying that any such an monthly inspection was being performe d. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in complian ce with the standard, including the steps that it is taking to ensure that emplo yees are not being exposed to respiratory hazards.ory
Recent events (1)
- — Z (S) $0
1910.146 C01
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $2,500 · Current $1,500 Reduced
General-duty citation text
29 CFR 1910.146(c)(1): The employer did not evaluate the workplace to determine if any spaces were permit-required confined spaces: Calumet Lubricants does not perform an evaluation, location by location, of areas to determine the number an d location of all confined spaces in the refinery. This violation was documented on or about September 22, 2010. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of this ci tation, the employer must submit documentation showing that it is in compliance with the standard, including the steps that it is taking to ensure that employee s are not being exposed to the hazards of confined space entry.
Recent events (2)
- — F (S) $1500
- — Z (S) $2500
1910.146 C02
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.146(c)(2): The employer did not inform exposed employees, by posting danger signs or by any other equally effective means, of the existence and loca tion of and the danger posed by the permit spaces: Calumet Lubricants does not i nform exposed employees of the existence, location and dangers posed by permit s paces by posting warning signs at all permit-required confined spaces in the ref inery or use any other effective means to alert employees to the dangers posed b y the permit- required spaces. This violation was documented on September 22, 20 10. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of thi s citation, the employer must submit documentation showing that it is in compliance with the sta ndard, including the steps that it is taking to ensure that employees are not be ing exposed to the hazards of confined space.ed
Recent events (1)
- — Z (S) $0
1910.146 K01 I
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $5,000 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.146(k)(1)(i): The employer did not correctly evaluate a prospective rescuer's ability to respond in a timely manner, considering the hazard(s) ident ified: The employer does not ensure that designated rescue personnel can respond in a timely manner. Rescue personnel are not required to remain on site the ent ire time confined space entry operations are in progress. Rescue personnel also are not required to have emergency breathing air and/or retrieval devices set up during entry of permit-required confined spaces. This violation was documented on or about September 22, 2010. Pursuant to 29 CFR 1903.19, within ten (10) cale ndar days of the date of this citation, the employer must submit documentation s howing that it is in compliance with the standard, including the steps that it i s taking to ensure that employees are not being exposed to the hazards of confined space entry.
Recent events (2)
- — F (S) $2500
- — Z (S) $5000
1910.146 K03 I
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.146(k)(3)(i): Each authorized entrant did not use a chest or full bo dy harness, with a retrieval line attached at the center of the entrant's back n ear shoulder level, or above the entrant's head: The employer does not ensure ad equate retrieval systems are used in the refinery to facilitate non-entry rescue . The employer does not enforce the use of safety harnesses with attached retrie val line on all entrants to permit-required confined spaces. This violation was documented on or about September 22, 2010. Pursuant to 29 CFR 1903.19, within te n (10) calendar days of the date of this citation, the employer must submit docu mentation showing that it is in compliance with the standard, including the step s that it is taking to ensure that employees are not being exposed to the hazard s of confined space entry.
Recent events (1)
- — Z (S) $0
1910.147 C05 I
- Issued
- Mar 14, 2011
- Abate by
- Mar 27, 2011
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.147(c)(5)(i): Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardware were not provided by the employer for isolating, se curing, or blocking of machines or equipment from energy sources: The employer d oes not ensure that all authorized employees are provided with lockout devices w hen isolating refinery equipment from potential energy sources. Contract mainten ance workers are not issued individual locks. These maintenance workers regularl y perform servicing and maintenance of locked out refinery equipment. This viola tion was documented on September 17, 2010. Pursuant to 29 CFR 1903.19, within te n (10) calendar days of the date of this citation, the employer must submit docu mentation showing that it is in compliance with the standard, including the step s that it is taking to ensure that employees are not being exposed to potential sources of hazardous energy.
Recent events (2)
- — F (S) $5000
- — Z (S) $5000
1910.147 C06 I
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: The employer does not ensu re that periodic inspections of each energy control procedure are conducted at l east annually by an authorized employee. The refinery contains numerous vessels and pieces of equipment, all with different specific energy control procedures, that require a separate periodic inspection. The periodic inspections were not c onducted annually by an authorized employee to ensure that the procedure and the requirements of the standard are being followed. This violation was documented on September 22, 2010. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in complianc e with the standard, including the steps that it is taking to ensure that employ ees are not being exposed to potential sources of hazardous energy.
Recent events (2)
- — F (S) $2500
- — Z (S) $2500
1910.147 C07 I
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.147(c)(7)(i): Employee training did not include all of the elements listed under items (a) through (c) of this section: The employer does not ensure that the same level of training is provided to all authorized employees perform ing servicing or maintenance of machines or equipment. Contract maintenance empl oyees who perform servicing or maintenance of machines or equipment do not recei ve training in energy control procedures. This violation was documented on or ab out September 17, 2010. Pursuant to 29 CFR 1903.19, within ten (10) calendar day s of the date of this citation, the employer must submit documentation showing t hat it is in compliance with the standard, including the steps that it is taking to ensure that employees are not being exp osed to potential sources of hazardous energy.
Recent events (2)
- — F (S) $2500
- — Z (S) $2500
1910.147 F03 I
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.147(f)(3)(i): A procedure was not utilized to afford the employees a level of protection equivalent to that provided by the implementation of a pers onal lockout or tagout device when servicing and/or maintenance was performed by a crew, craf t, department, or other group: The employer does not ensure that there is a proc edure in place that affords an equal level of protection for all members of a cr ew, craft, department or other group when performing servicing or maintenance of machines or equipment. Regular maintenance employees (maintenance A) routinely perform servicing and maintenance of locked out refinery equipment under one loc k. When a lockout is performed involving more than one maintenance A employee, c ontract maintenance employee and/or outside contractor employee only a single ma intenance lock is used to protect them from the unexpected energization or start up of the machinery or equipment. This violation was documented on or about Sep tember 22, 2010. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of th e date of this citation, the employer must submit documemtation showing that it is in complianc e with the standard, including the steps that it is taking to ensure that employ ees are not being exposed to potential sources of hazardous energy.
Recent events (1)
- — Z (S) $5000
1910.147 F04
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(f)(4): During shift or personnel changes, specific procedures we re not utilized to ensure the continuity of lockout or tagout protection, includ ing a provision for the orderly transfer of lockout or tagout devices between of f-going and oncoming employees, to minimize exposure to hazards from the unexpec ted energization, or start-up of the machine or equipment, or the release of sto red energy: The employer does not ensure that there are adequate written procedu res in place for shift or personnel changes while lockout operations are being p erformed. No provision is made for the orderly transfer of lockout protection be tween off-going and oncoming employees or for employees leaving the refinery whi le lockout operations are in progress. No provision is made for oncoming employees to verify that machinery or equipment has been effectivel y de- energized. This violation was documented on or about September 22, 2010. P ursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of this cit ation, the employer must submit documentation showing that it is in compliance w ith the standard, including the steps that it is taking to ensure that emplouees are not being exposed to potential sources of hazardous energy.
Recent events (1)
- — Z (S) $0
1910.179 B05
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $5,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.179(b)(5): The rated load of crane(s) was not plainly marked on each side of the crane: The employer does not ensure that overhead cranes are plainl y marked with the rated load. The five-ton overhead crane in the maintenance sho p was not plainly marked with its rated load. This violation was observed on Sep tember 20, 2010. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of th e date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including the steps that it is taking to ens ure that employees are not being exposed to struck-by hazards while operating th e overhead crane.ad
Recent events (2)
- — F (S) $0
- — Z (S) $5000
1910.179 J02 III
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.179(j)(2)(iii): Monthly inspections of hooks, with signed reports, w ere not performed: a) The employer does not ensure that crane hooks are inspecte d, and the inspection certified, on a monthly basis. A five ton overhead crane in the maintenance shop was used to move large pieces and/or equipment to work on. This violation was d ocumented on or about September 20, 2010. b) The employer does not ensure that c rane hooks are inspected, and the inspection certified, on a monthly basis. A on e ton Duff Lynx overhead crane in the pump shop was used to position pumps being repaired. This violation was documented on or about September 20, 2010. c) The employer does not ensure that crane hooks are inspected, and the inspection cert ified, on a monthly basis. A one ton Dayton overhead crane in the outside storag e area was used to move stored materials. This violation was documented on or ab out September 20, 2010 in the maintenance yard. Pursuant to 29 C.F.R. 1903.19, w ithin ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in comp liance with the standard, including the steps that it is taking to ensure that e mployees are not being exposed to struck-by hazards while operating the overhead crane.
Recent events (2)
- — F (S) $0
- — Z (S) $0
1910.179 J02 IV
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.179(j)(2)(iv): Monthly inspections of hoist chains, with signed repo rts, were not performed: a) The employer does not ensure that crane hoist chains are inspected on a monthly basis. A five-ton overhead crane in the maintenance shop was used to move large pieces and/or equipment to work on. This violation w as documented on September 20, 2010. b) The employer does not ensure that crane hoist chains are inspected on a monthly basis. A one ton Duff Lynx overhead cran e in the pump shop was used to position pumps being repaired. This violation was documented on or about September 20, 2010. c) The employer does not ensure that crane hoist chains are inspected on a monthly basis. A one ton Dayton overhead crane in the outside storage area was used to move stored materials. This violation was documented on or about September 20, 2 010 in the maintenance yard. Pursuant to 29 C.F.R. 1903.19, within ten (10) cale ndar days of the date of this citation, the employer must submit documentation s howing that it is in compliance with the standard, including the steps that it i s taking to ensure that employees are not being exposed to struck-by hazards whi le operating the overhead crane.
Recent events (1)
- — Z (S) $0
1910.212 A05
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.212(a)(5): Fan blades, where the periphery of the blades was less th an seven feet above the floor or working level, were unguarded or had guards wit h openings larger than one- half inch: The employer does not ensure that the wal l ventilation fan has a guard over the fan blades. The fan was approximately 3 f oot by 3 foot and 5 feet off the floor at the bottom edge of the fan. The fan wa s totally unguarded inside the building and from the outside the fan blades are protected by a metal mesh with openings ranging from 2 inches by 6 inches to 4 i nches by 6 inches. This violation was observed on or about September 20, 2010 on the south wall of the maintenance shop. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in complian ce with the standard, including the steps that it is taking to ensure that emplo yees are not exposed to the hazard of being struck by unguarded fan blades.
Recent events (1)
- — Z (S) $2500
1910.219 D01
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified at 29 CFR 1910.219(m) & (o): The employer does not ensure employees are protecte d from contact with unguarded pulleys. The unguarded pulley was on a motor power ing a wall-mounted ventilation fan. Employee(s) were exposed to a caught-between hazard. This violation was observed on or about September 20, 2010. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including the steps that it is taking to ensure that employees are not being exposed to unguarded pulleys.
Recent events (1)
- — Z (S) $0
1910.219 E03 I
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.219(e)(3)(i): Vertical belt(s) were not enclosed by guard(s) conform ing to the requirements specified in 29 CFR 1910.219(m) and (o): The employer do es not ensure that employees are protected from contact with unguarded belts. Th e unguarded belt was on a motor powering a wall-mounted ventilation fan. This co ndition exposed employees to a caught-between hazard. This violation was observe d on or about September 20, 2010. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentat ion showing that it is in compliance with the standard, including the steps that it is taking to ensure that employees are not being exposed to unguarded belts.
Recent events (1)
- — Z (S) $0
1910.219 B01
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.219(b)(1): Flywheel(s) with parts seven feet or less above floor(s) or platform(s) were not guarded in accordance with the requirements specified in 29 CFR 1910.219(b)(1)(i) through (b)(1)(iv): The employer does not ensure that employees are protected from an inadequately guarded flywheel. An Ingersol Rand backup recycle compressor (C-301), located on the west side of the hydrotreater, had a 3" X 13" opening on the inside portion of the expanded metal guard. This condition exposed employee to the hazard of c oming in contact with rotating parts. This violation was observed on or about Se ptember 20, 2010. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days o f the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including the steps that it is taking to ensure that employees are not being exposed to the hazards associated with rota ting parts.ng
Recent events (2)
- — F (S) $2500
- — Z (S) $2500
1910.242 B
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,500 · Current $1,500
General-duty citation text
29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.: The employer does not ensure that compressed air used fo r cleaning purposes has been reduced to less than 30 psi. An air nozzle rated at 140 psi was used to clean off stock when the drill press is in operation. Emplo yee(s) were exposed to the hazard of having metal shavings blown into their eyes . This violation was observed on or about September 20, 2010 on the north side o f the maintenance shop. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showin g that it is in compliance with the standard, including the steps that it is tak ing to ensure that compressed air is not used for cleaning purposes unless reduc ed to less than 30 p.s.i. and then only with effective chip guarding and persona l protective equipment.
Recent events (2)
- — F (S) $1500
- — Z (S) $1500
1910.307 C01
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $2,500 · Current $0 Reduced
General-duty citation text
29 CFR 1910.307(c)(1): Equipment, wiring methods, and installation of equipment in hazardous (classified) locations were not intrinsically safe, approved for the hazardous ( classified) location, or safe for the hazardous (classified) location(s): Such a s but not limited to: a) The employer does not ensure all equipment is approved for hazardous locations. Electric motors used in the plant were not classified a s Class I Div II motors. The motor P-103A Toshiba Model Number B0252FLG3BMHJ01 w as not a Class I Div II motor. P-103A was located in the 100 unit which the empl oyer has designated a Class I Div II location. b) The employer does not ensure a ll equipment is approved for hazardous locations. Electric motors used in the pl ant were not classified as Class I Div motors, P-401A Marathon Model Number 6VF2 15TTFS400 was not a Class I Div II motor. The motor P-401A was located in the 40 0 unit which the employer has designated a Class I Div II location. The unclassi fied motors create an explosion and fire hazard. The hazard was observed on or about September 23, 2010. Pursuant to 29 CFR 1903.19(d), within (10) calendar da ys of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including the steps it is taking to ensure that employees are not being exposed to the explosion hazard.on
Recent events (2)
- — F (S) $0
- — Z (S) $2500
1910.1001 J02 I
- Issued
- Mar 14, 2011
- Abate by
- Apr 28, 2011
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.1001(j)(2)(i): The employer did not determine the presence, location , and quantity of ACM and/or PACM at the work site: Calumet has not completed an asbestos survey to identify the presence, location and quantity of all asbestos -containing materials. The employer violated this standard on or about September 14, 2010 when in respo nse to a request for documents Calumet failed to provide an asbestos survey of t he facility. No written records were provided indicating what insulating and bui lding materials contain asbestos, the percentage of asbestos present, the locati on of these materials, and the quantity of asbestos-containing materials. Pursua nt to 29 CFR 1903.19, within ten (10) calendar days of the date of this citation , the employer must submit documentation showing that it is in compliance with t he standard, including the steps that it is taking to ensure that employees are not being exposed to airborne asbestos fibers.
Recent events (2)
- — F (S) $2500
- — Z (S) $2500
1910.1001 J04 I
- Issued
- Mar 14, 2011
- Abate by
- Apr 28, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1001(j)(4)(i): The employer does not affix warning labels to all raw materials, mixtures, scrap, waste, debris, and other products containing asbest os fibers, or to their containers. When a building owner or employer identifies previously installed ACM and/or PACM, labels or signs shall be affixed or posted so that employees will be notif ied of what materials contain ACM and/or PACM. Calumet Lubricants has not attach ed warning labels to thermal system insulation on all piping and vessels. Some p ressure vessels have been attached labels, but other pressure vessels and piping are not labeled. The employer violated this standard on or about September 14, 2010 at Calumet Lubricants-Cotton Valley where piping insulated with asbestos wa s not labeled. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including the steps that it is taking to ensur e that employees are not being exposed to airborne asbestos fibers.
Recent events (1)
- — Z (S) $0
1910.1028 E03 IV
- Issued
- Mar 14, 2011
- Abate by
- Apr 28, 2011
- Penalty
- Initial $1,500 · Current $1,500
General-duty citation text
29 CFR 1910.1028(e)(3)(iv): Monitoring for the STEL was not repeated as necessar y to evaluate exposures of employees subject to short term exposures: The employer does not conduct benzene STEL sampling during refinery operations where tanks a re opened, filled, unloaded or gauged or where process equipment is opened. Main tenance employees break pipelines, fix valve and flange leaks, respond to proces s spills, and enter confined spaces without benzene sampling being conducted. Th e employer violated this standard on or about September 14, 2010, at Calumet Lub ricants Co., located in Cotton Valley, Louisiana. Upon request, the employer fai led to provide documents indicating the existence of a comprehensive benzene mon itoring program for employees performing maintenance activities. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of this citation, the emp lyer must submit documentation showing that it is in compliance with the standar d, including the steps that it is taking to ensure that employees receive appropriate benzene monitoring.
Recent events (1)
- — Z (S) $1500
1910.1200 E01 I
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,500 · Current $0 Reduced
General-duty citation text
29 CFR 1910.1200(e)(1)(i): The written hazard communication program did not incl ude a list of the hazardous chemicals known to be present using an identity that was referenced on the appropriate material safety data sheet: The employer does not ensure the hazardous chemicals list contains all the hazardous chemicals lo cated in the refinery. The list of chemicals missing from the list includes, but is not limited to, argon, welding rods and all the Nalco treatment chemicals. T his violation was documented on or about September 21, 2010. Pursuant to 29 C.F. R. 1903.19, within ten (10) calendar days of the date of this citation, the empl oyer must submit documentation showing that it is in compliance with the standar d, including the steps that it is taking to ensure the hazardous chemicals list is updated to reflect all the hazardous chemicals entering the refinery.
Recent events (2)
- — F (S) $0
- — Z (S) $1500
1910.1200 F05 I
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(f)(5)(i): The employer did not ensure that each container of hazardous chemicals in the workplace was labeled, tagged or marked with the i dentity of the hazardous chemical(s) contained therein: a) The employer does not ensure that containers of hazardous chemicals are labeled with the contents. An unlableld parts washer in the pump shop contains a cleaning solvent. This viola tion was observed on or about September 20, 2010. b) The employer does not ensur e that containers of hazardous chemicals are clearly labeled as to content. Four 55 gallon drums in the old warehouse were not clearly labeled. Two of the drums were upside down and on one drum the contents were handwritten. This violation was observed on or about September 20, 2010. Pursuant to 29 C.F.R. 1903.19, with in ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including the steps that it is taking to ensure that employees are not being exp osed to hazardous chemicals.
Recent events (2)
- — F (O) $0
- — Z (S) $0
1910.1200 G02 III
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(g)(2)(iii): Each material safety data sheet did not contain the physical hazards of the hazardous chemical, including the potential for fire, e xplosion, and reactivity: The employer violated this standard on or about Decemb er 3, 2010 when it was noted that the Calumet MSDS for Product Hydrogen includes conflicting and incorrect flammability information. The writing says "Explosion Hazard. Highly Flammable Gas," but the NFPA diamond graphic has a zero in the f ire hazard block. This exposes employees to fire and explosion hazards. Pursuant to 29 CFR 1903.19(d), within 10 days of the abatement date, the employer must s ubmit an abatement plan describing the actions it is taking to ensure that the M aterial Safety Data Sheets accurately indicate the hazards of the chemical they reference.
Recent events (2)
- — F (O) $0
- — Z (S) $0
1904.29 B01
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,000 · Current $1,000
General-duty citation text
29 CFR 1904.29(b)(1): A Log of recordable work-related injuries and illnesses (O SHA Form 300 or equivalent), was not completed in the detail as required by the regulation: At Calumet Lubricants Co., Cotton Valley, LA; On or about September 22, 2010, the Log of Work-Related Injuries and Illnesses (OSHA Form 300 or equiv alent) was not completed as required by the regulation. a)Section B: "Employee's Name" was not filled out for the only two entries on the OSHA 300 Log for the y ear 2009. b)Section E: "Where the event occurred" was not filled out for one entry and was not completely in detail for the second entry on the OSHA 300 Log for the year 2009. This violation was documented on or about September 22, 2010. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, t he employer must submit documentation showing that it is in compliance with the standard, including the steps that it is taking to ensure employee injuries are properly recorded on the OSHA 300 Injury and Illness Log.
Recent events (1)
- — Z (O) $1000
1904.32 B03
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,000 · Current $1,000
General-duty citation text
29 CFR 1904.32(b)(3): The Summary of Work-Related Injuries and Illnesses (OSHA F orm 300A or equivalent) was not properly certified: At Calumet Lubricants Co., C otton Valley, LA; On or about September 22, 2010, the Summary of Work-Related In juries and Illnesses (OSHA Form 300A) for the year 2009 was not signed and prope rly certified as being true, accurate and complete by a company executive. This violation was documented on or about September 22,2010. Pursuant to 29 C.F. R. 1903.19, within ten (10) calendar days of the date of this citation, the empl oyer must submit documentation showing that it is in compliance with the standar d, including the steps that it is taking to ensure that OSHA forms are properly completed and certified.
Recent events (1)
- — Z (O) $1000
1910.106 G08
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.106(g)(8): Conspicuous and legible signs prohibiting smoking were no t posted within sight or customer service area(s): a) The employer does not ensu re that "no smoking" signs are posted in the diesel refueling area. This violati on was observed on or about 9-20-2010 in the maintenance yard where employees re fuel vehicles and equipment from a 500 gallon diesel tank. b) The employer does not ensure that "no smoking" signs are posted in the diesel refueling area. This violation was observed on or about 9-21-2010 west of the warehouse where em ployees refuel vehicles and equipment from a 2500 gallon diesel tank. Pursuant t o 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with th e standard, including the steps that it is taking to ensure that employees are n ot being exposed to the hazards of fire.ds
Recent events (1)
- — Z (O) $0
1910.157 E02
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.157(e)(2): Portable fire extinguishers were not visually inspected a t least monthly: The employer violated this on or about September 27, 2010 when a fire extinguisher outside the main entrance to the Administration Building was observed to have not been inspected since the month of July. This exposed emplo yees to fire and explosion hazards. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation show ing that it has completed monthly fire extinguisher inspections for all fire extinguishers on its property.hers
Recent events (1)
- — Z (O) $0
1910.157 E03
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.157(e)(3): The employer did not assure that portable fire extinguish ers are subjected to an annual maintenance check. The employer violated this on or about January 12, 2011 when a fire extinguisher in the hall of the conference room area upstairs in the Administration Building was observed to have not been inspected since November of 2009. This exposed employees to fire and explosion hazards. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatem ent date, the employer must submit documentation showing that it has completed a nnual maintenance checks for all fire extinguishers on its property.hers
Recent events (1)
- — Z (O) $0
1910.212 A01
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,000 · Current $1,000
General-duty citation text
29 CFR 1910.212(a)(1): One or more methods of machine guarding were not provided to protect operator(s) and other employees from the hazard(s) created by point of operation and/or rotating parts: The employer does not provide a guard over t he rotating chuck of a Clausing Colchester 17" metal lathe. The lathe is used on metal piping. This violation wa s observed on or about September 20, 2010 on the north wall of the maintenance s hop. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in com pliance with the standard, including steps that it is taking to ensure that empl oyees are not being exposed to the hazard of being struck by caught by rotating parts.
Recent events (1)
- — Z (O) $1000
1910.212 A03 II
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,000 · Current $1,000
General-duty citation text
29 CFR 1910.212(a)(3)(ii): The point of operation of machines whose operation ex poses employees to injury, was not guarded. a) The employer does not provide a g uard over the rotating drill bit of an Allen-Bradley (A-B) drill press, model no . 6790-3, serial no. 33414. The drill press was used to cut holes in metal stock . This violation was observed on or about September 20, 2010 on the north side o f the maintenance shop. b) The employer does not provide a guard over the rotating drill bit of a Wilton drill press. The drill press was used to drill holes in metal plates. This viol ation was observed on or about September 20, 2010 on the north wall of the pump shop. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date o f this citation, the employer must submit documentation showing that it is in co mpliance with the standard, including steps that it is taking to ensure that emp loyees are not being exposed to point of operation hazards.
Recent events (1)
- — Z (O) $1000
1910.215 A04
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.215(a)(4): Work rest(s) on grinding machinery were not adjusted clos ely to the wheel with a maximum opening of one eighth inch: The employer does no t ensure employees are protected from an inadequately guarded grinder. A Baldor 3HP pedestal grinder, serial no. 375, had a work rest that was one inch from the abrasive wheel. The grinder waOOOOOOOOVs used to remove rough edges from cut me tal and angle iron. This violation was observed on or about September 20, 2010 on the east wall of the maintenance shop. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit do cumentation showing that it is in compliance with the standard, including the st eps that it is taking to ensure that employees are not being exposed to struck-b y hazards.
Recent events (1)
- — Z (O) $0
1910.215 B09
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.215(b)(9): The distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the to p exceeded one fourth inch: The employer does not ensure employees are protected from an inadequately guarded grinder. A Baldor 3HP pedestal grinder, serial no. 375, had a tongue guard that was 1 1/4 inch from the abrasive wheel. The grinde r was used to remove rough edges from cut metal and/or angle iron. This violatio n was observed on or about September 20, 2010 on the east wall of the maintenanc e shop. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date o f this citation, the employer must submit documentation showing that it is in co mpliance with the standard, including the steps that it is taking to ensure that employees are not being exposed to struck-by hazards.
Recent events (1)
- — Z (O) $0
1910.303 B02
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,000 · Current $1,000
General-duty citation text
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or in stalled in accordance with instructions included in the listing or labeling: The employer does not ensure listed or labeled electrical equipment is used in acco rdance with manufacturer's instructions. A Surge Master power strip was permanen tly attached to a metal work table as a power source for work tools. This violat ion was observed on or about September 20, 2010 in the maintenance shop. Pursuan t to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citati on, the employer must submit documentation showing that it is in compliance with the standard, including the steps that it is taking to ensure that employees are not being exposed to electrical hazards.al
Recent events (1)
- — Z (O) $1000
1910.304 G05
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,000 · Current $1,000
General-duty citation text
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosur es was not permanent and continuous: a) The employer does not ensure adequate pa th to ground for electrical equipment. A ground prong was missing from a 30 inch pedestal fan. This violation was observed on or about September 22, 2010 in the maintenance shop. b) The employer does not ensure adequate path to ground for e lectrical equipment. A ground prong was missing from a 4 foot by 4 foot portable box fan. This violation was observed on or about September 22, 2010 in the main tenance shop. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of th e date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including the steps that it is taking to ensure that employees are not being exp osed to electrical hazards.
Recent events (1)
- — Z (O) $1000
1910.305 B01 II
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,000 · Current $1,000
General-duty citation text
29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed: The employer does not ensure electrical fittings are eff ectively closed. An electrical fitting for a 480 volt transformer had an opening approximately 2 inches by 4 inches, exposing the inner conductors. This violati on was observed on or about September 21, 2010 on the north side of the laborato ry building. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it i s in compliance with the standard, including the steps that it is taking to ensu re that employees are not being exposed to electrical hazards.
Recent events (1)
- — Z (O) $1000
1910.305 B02 I
- Issued
- Mar 14, 2011
- Abate by
- Mar 31, 2011
- Penalty
- Initial $1,000 · Current $1,000
General-duty citation text
29 CFR 1910.305(b)(2)(i): In completed installations, each outlet box shall have a cover, faceplate, or fixture canopy identified for the purpose. a) The employer does not ensure electrical outlets have cover plates. An uncover ed 110 volt duplex outlet was attached to a metal work table as a power source f or work tools. This violation was observed on or about September 20, 2010 in the maintenance shop. b) The employer does not ensure electrical junction boxes hav e cover plates. An uncovered 110 volt junction box was attached to the north wal l of the insulation shop adjacent to the air conditioner. This violation was obs erved on or about September 20, 2010. c) The employer does not ensure electrical outlets have cover plates. An uncovered 220 volt duplex outlet was used to powe r the wall mounted air conditioner. This violation was observed on or about Sept ember 21, 2010 on the north wall of the instrument shop. Pursuant to 29 C.F.R. 1 903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including steps that it is taking to ensure that employees are not bei ng exposed to electrical hazards.
Recent events (1)
- — Z (O) $1000
More inspections at Calumet Lubricants CO., L.P.
View Calumet Lubricants CO., L.P.'s full OSHA safety record →
More inspections in this industry (NAICS 324110)
More inspections in LA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314767104.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.