TULSA, OK ·
OSHA Inspection: HOLLY REFINING & MARKETING - TULSA LLC
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of HOLLY REFINING & MARKETING - TULSA LLC in 1700 S. UNION, TULSA, OK 74107 (NAICS 324110). OSHA activity number 314927559.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HOLLY REFINING & MARKETING - TULSA LLC
- Site address
- 1700 S. UNION
- City
- TULSA
- State
- OK
- ZIP
- 74107
- Mailing
- P.O. BOX 21001, TULSA, OK 74121
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 324110
- SIC code (legacy)
- 2911
- Employees
- 360
- Ownership type
- A
Citations
15 citations on file for this inspection.
5(a)(1)
- Issued
- Mar 14, 2011
- Abate by
- Aug 30, 2011
- Penalty
- Initial $5,000 · Current $2,500 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fire hazards: The employer did not control ignition sources through proper bonding and grounding during manual operations with flammable liquids. On or about November 4, 2010, in the #2 Platformer Unit, the employer failed to ensure proper bonding and grounding during process operations at the Methanol and Chloride Injection Tanks: a) The employer did not ensure proper grounding of the 55-gallon drum of methanol used during the manual addition process to the Chloride Injection Tank. b) The employer did not ensure proper bonding between the employee, the plastic containers used to transfer the methanol, the 55-gallon drum of methanol, and the Chloride Injection Tank during manual addition of methanol to the Chloride Injection Tank. One feasible method of abatement for this hazard, among others, would be to ensure proper grounding and bonding of containers is done to ensure static discharge is eliminated.
Recent events (2)
- · I (S) $2500.00
- · Z (S) $5000.00
1910.38 D
- Issued
- Mar 14, 2011
- Abate by
- Oct 1, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.38(d): The employee alarm system did not use a distinctive signal for each purpose and comply with the requirements in 29 CFR 1910.165: On or about September 14, 2010, and at times prior thereto, the employer did not ensure a distinctive alarm system was in place to warn of fire, vapor release, or severe weather for Holly Refinery West, exposing employees to the hazards of fire, explosion, toxic vapor inhalation and flying debris during emergency events.cy
Recent events (2)
- · I (S) $3500.00
- · Z (S) $5000.00
1910.120 Q02 IX
- Issued
- Mar 14, 2011
- Abate by
- Oct 1, 2011
General-duty citation text
29 CFR 1910.120(q)(2)(ix): The emergency response plan did not address emergency alerting and response procedures: On or about September 14, 2010, and at times prior thereto, emergency alerting procedures addressed in both the Emergency Response Plan and the Incident Command Reference Manual for Holly Refinery West were not consistent, exposing employees to the hazards of fire, explosion, toxic vapor inhalation and flying debris during emergency events.cy
Recent events (2)
- · I (S)
- · Z (S)
1910.119 D03 II
- Issued
- Mar 14, 2011
- Abate by
- Apr 16, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(ii): The employer did not document that the equipment in the process complied with recognized and generally accepted good engineering practices (RAGAGEP): a) On or about September 14, 2010, and at times prior thereto, the employer did not document the positive-pressure ventilation system in the Crude Unit/Platformer Control Room complied with RAGAGEP such as NFPA 496 when the blast-rated doors on the west side of the control room were allowed to be used as a common entry/exit. The west doors were designed for use solely as an occupant Emergency Exit or to allow transport of large equipment. b) On or about September 14, 2010, and at times prior thereto, the employer did not comply with RAGAGEP such as, but not limited to, API 752, when they housed employees in inadequately protected structures such as, but not limited to, the Boiler House Control Room. This exposes employees to the hazards of explosion, fire, and toxic vapors. c) On or about September 14, 2010, and at times prior thereto, the employer did not document that relief systems associated with atmospheric blowdown drums in the Propane Deasphalting Unit, Methyl Ethyl Ketone Unit, Crude Distillation Unit and Lubes Extraction Unit complied with RAGAGEP, such as, but not limited to, API 521.
Recent events (2)
- · I (S) $3500.00
- · Z (S) $5000.00
1910.119 E05
- Issued
- Mar 14, 2011
- Abate by
- Dec 31, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.119(e)(5): The employer did not establish a system to promptly address process hazard analysis (PHA) team findings and recommendations; assure the recommendations are resolved in a timely manner and the resolution is documented; document what actions are to be taken; complete actions as soon as possible; develop a written schedule of when these actions are to be completed; communicate the actions to operating, maintenance and other employees whose work assignments are in the process and who may be affected by the recommendations or actions: On or about September 14, 2010, and at times prior thereto, the employer did not resolve the 2007 #2 Platformer Unit PHA Revalidation finding and action item to design a system to eliminate the practice of manual addition of perchloroethylene to the Chloride Injection Tank.tion
Recent events (2)
- · I (S) $3500.00
- · Z (S) $5000.00
1910.119 F01
- Issued
- Mar 14, 2011
- Abate by
- Dec 31, 2011
- Penalty
- Initial $5,000 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(f)(1): The employer did not develop and implement written operating procedures that provided clear instructions for safely conducting activities involved in each covered process consistent with process safety information: On or about September 14, 2010, and at times prior thereto, the employer did not fully develop detailed written operating procedures. Procedures did not identify all steps necessary to perform the procedures and/or did not identify by name, call number, control board identifier or other means the valves, pumps, controllers, and connections referenced in the procedures. These procedures, among others, were deficient: a) OPLT602.DOC, Unifiner Shutdown b) OPLT606.DOC, Depentanizer Tower Shutdown c) OBS602.DOC, Butane Splitter Shutdown d) OPLT105.DOC, Operate and Maintain Chemical Injection Systemson
Recent events (2)
- · I (O) $2500.00
- · Z (S) $5000.00
1910.119 F03
- Issued
- Mar 14, 2011
- Abate by
- Mar 17, 2011
General-duty citation text
29 CFR 1910.119(f)(3): The operating procedures were not reviewed as often as necessary to assure that they reflect current operating practice, including changes that result from changes in process chemicals, technology, and equipment, or changes to facilities: On or about September 14, 2010, and at times prior thereto, the Unit Description Manual for the Platformer Unit did not reflect current operating practice; Section 1.1.2 incorrectly identified 1,1,1 Trichloroethylene as a chemical used in the platformer reactor section. IN THE ALTERNATIVE: 29 CFR 1910.119(d)(1): Process safety information pertaining to the hazards of the highly hazardous chemicals in the process did not consist of the elements specified in 29 CFR 1910.119 (d)(1)(i) through (vii).h
Recent events (2)
- · I (O)
- · Z (S)
1910.119 H02 IV
- Issued
- Mar 14, 2011
- Abate by
- Aug 31, 2011
- Penalty
- Initial $5,000 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(h)(2)(iv): The employer did not ensure contract employees follow the host employer's safe work practice when entering, exiting, or working in the covered process areas: The employer did not ensure contractors are properly signed in/out of the process areas to allow effective personnel accounting and emergency evacuation/rescue procedures. a)On December 10, 2010, four contractor employees signed in and entered the Unifiner process area, but failed to sign out of the process area. b)On December 8, 2010, three contractor employees failed to sign in when entering the #8 cooling tower. c)On December 8, 2010, two contractor employees signed in and entered the #2 Platformer, but failed to sign out of the process area.
Recent events (2)
- · I (O) $2500.00
- · Z (S) $5000.00
1910.119 J02
- Issued
- Mar 14, 2011
- Abate by
- Apr 16, 2011
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: On or about September 14, 2010, and at times prior thereto, the employer did not establish and/or implement written procedures for the on-going mechanical integrity of equipment such as, but not limited to: a)The mechanical integrity program procedures for pressure vessels and for process piping did not clearly set the specific number and locations of thickness measurement locations (TMLs) for each of its pressure vessels and sections of piping. b)The employer's mechanical integrity procedure did not address anomalous inspection data such as increasing TML values for pressure vessels including, but not limited to: 1) #2 Platformer Unit: TRPV12 374 Depentanizer (Rerun) Tower 2) #2 Platformer Unit: R-PV2 374 Reactor2 3) Unifiner Unit: E-104D 373 Reactor Product Condenser 4) Unifiner Unit: R-HV3 373 Unifining Reactor 5) Butane Splitter Unit: D-AV20383 Depropanizer Charge Drumge
Recent events (2)
- · I (S) $5000.00
- · Z (S) $5000.00
1910.119 J04 III
- Issued
- Mar 14, 2011
- Abate by
- Apr 16, 2011
- Penalty
- Initial $5,000 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment to maintain its mechanical integrity was not consistent with applicable manufacturers' recommendations and good engineering practices, or more frequently determined to be necessary by prior operating experience: On or about September 14, 2010, and at times prior thereto, the employer's mechanical integrity inspection process for pressure vessels did not adhere to RAGAGEPs such as API 510 - "Pressure Vessel Inspection Code: Maintenance Inspection, Rating, Repair, and Alteration" on the frequency of inspection of thickness measuring locations (TMLs) for pressure vessels including, but not limited to: a) #2 Platformer Unit: TRPV12 374 Depentanizer (Rerun) Tower b) #2 Platformer Unit: R-PV2 374 Reactor2 c) Unifiner Unit: E-104D 373 Reactor Product Condenser d) Unifiner Unit: R-HV3 373 Unifining Reactorng
Recent events (2)
- · I (O) $2500.00
- · Z (S) $5000.00
1910.119 L01
- Issued
- Mar 14, 2011
- Abate by
- Aug 31, 2011
- Penalty
- Initial $5,000 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(l)(1): The employer did not establish and implement written procedures to manage changes to process chemicals, technology, equipment, and procedures and, changes to facilities that affect a covered process: a)#2 Platformer, Unifiner and Butane Splitter Units: On or about September 14, 2010, and at times prior thereto, the employer did not implement management of change procedures for increasing the charge to the units. b)#2 Platformer: On or about November 3, 2010, the employer did not implement management of change procedures for the hand addition of methanol to the Chloride Injection Tank.tion
Recent events (2)
- · I (S) $2500.00
- · Z (S) $5000.00
1910.119 L04
- Issued
- Mar 14, 2011
- Abate by
- Apr 16, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.119(l)(4): A change covered by 29 CFR 1910.119(l) resulted in a change in the process safety information required by 29 CFR 1910.119(d) and the process information was not updated: On or about September 14, 2010, and at times prior thereto, the employer did not update #2 Platformer piping and instrument diagrams (P&IDs). P&ID MF-45075 depicting the Chloride Injection Tank and Methanol Injection Tank and associated piping and equipment was not concurrent with actual field conditions.
Recent events (2)
- · I (S) $3500.00
- · Z (S) $5000.00
1910.119 M01
- Issued
- Mar 14, 2011
- Abate by
- Apr 16, 2011
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.119(m)(1): The employer did not investigate each incident which resulted in, or could reasonably have resulted in a catastrophic release of highly hazardous chemical in the workplace: On or about September 14, 2010, and at times prior thereto, the employer did not include information about the causal factors, contributing circumstances, recommendations, response to findings, or corrective actions in the investigation of the following incidents: a)Butane Splitter Unit: On May 7, 2008, a hole was found in the flare line off the West KOH scrubber when blowing down sample point. b)#2 Platformer: On August 14, 2007, the 30" flare line had a small consistent drip from the flange area; approximately one-half gallon spilled to the ground. c)Butane Splitter Unit: On December 11, 2006, the 30" flare line on the levee between the Coker flare and the #2 Platformer flare developed a new leak; approximately 15 gallons spill to the ground.
Recent events (2)
- · I (S)
- · Z (S) $5000.00
1910.119 O04
- Issued
- Mar 14, 2011
- Abate by
- Dec 31, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.119(o)(4): The employer did not promptly determine and document an appropriate response to each of the findings of the compliance audit, and document that deficiencies have been corrected: On or about September 14, 2010, and at times prior thereto, compliance audit items were not corrected and documented. Action Item 1 identified in the 2009 PSM Audit was not fully corrected and documented for the Butane Splitter Unit.ter
Recent events (2)
- · I (S) $3500.00
- · Z (S) $5000.00
1910.132 D01 I
- Issued
- Mar 14, 2011
- Abate by
- Jun 30, 2011
- Penalty
- Initial $2,500 · Current $1,750 Reduced
General-duty citation text
29 CFR 1910.132(d)(1)(i): The employer did not select and have each affected employee use the types of personal protective equipment that would protect the affected employee from the hazards identified in the hazard assessment: In the #2 Platformer Unit, the employer did not ensure employees used appropriate personal protective equipment such as chemically-resistant gloves and faceshields: a) On or about September 14, 2010, and at times prior thereto, for employees manually adding perchloroethylene to the injection tank. b) On or about November 4, 2010, and at times prior thereto, for employees manually adding methanol to the injection tank.tion
Recent events (2)
- · I (O) $1750.00
- · Z (S) $2500.00
More inspections at Holly Refining & Marketing - Tulsa LLC
View Holly Refining & Marketing - Tulsa LLC's full OSHA safety record →
More inspections in this industry (NAICS 324110)
More inspections in OK
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314927559.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.