RICHLAND, MS —
OSHA Inspection: AZZ INC DBA AZZ GALVANIZING SERVICES
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of AZZ INC DBA AZZ GALVANIZING SERVICES in 125 AZTEC DRIVE, RICHLAND, MS 39218 (NAICS 332812). OSHA activity number 315306365.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- AZZ INC DBA AZZ GALVANIZING SERVICES
- Site address
- 125 AZTEC DRIVE
- City
- RICHLAND
- State
- MS
- ZIP
- 39218
- Mailing
- 125 ASTEC DRIVE, RICHLAND, MS 39218
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332812
- SIC code (legacy)
- 3479
- Employees
- 27
- Ownership type
- A
Citations
22 citations on file for this inspection.
5(a)(1)
- Issued
- May 31, 2012
- Abate by
- Dec 3, 2012
- Penalty
- Initial $5,500 · Current $4,000 Reduced
General-duty citation text
Section 5(a)(1) of Public Law 91-596, the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees, in that: employees were exposed to struck-by hazards due to damaged below-the- hook lifting devices and to a lifting device not marked. (a)On or about December 22, 2011 in the rack-up area at the beginning of the dip tank line, below-the-hook bent and damaged lifting devices were not removed from service for repair or replacement. (b)On or about December 22, 2011 between the dip tanks and the kettle containing melted zinc, the Dross Scope was not marked with an ID listing but not limited to the following: - Manufacturer's name and address - Serial number of the device - Lifter weight if over 100 lbs (45 kg) - Cold current (amps when applicable) - Rated voltage (if applicable) - Rated load [as described in par. 20-1.2.1(a)] - ASME BTH-1 Design Category - ASME BTH-1 Service Class Among others, one feasible and useful method to correct the hazards is to follow the requirements found in American Society of Mechanical Engineers (ASME) stand ASME B30.20- 2006 for inspection, removal from service, repair, and/or replacement and for proper inspection and marking of the below the hook lifting devices.
Recent events (2)
- — I (S) $4000.00
- — Z (S) $5500.00
5(a)(1)
- Issued
- May 31, 2012
- Abate by
- Aug 6, 2012
- Penalty
- Initial $4,400 · Current $3,000 Reduced
General-duty citation text
Section 5(a)(1) of Public Law 91-596, the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees, in that: employees were exposed to burns. (a)On or about December 22, 2011 along the aisle in front of the dip tanks, employees were exposed to burns from contacting the supply steam line or the steam return line. Among others, one feasible and useful method to correct the hazard is to install a barrier over the steam lines. Reference ASTM standard C 105503 (Re-approved 2009).
Recent events (2)
- — I (S) $3000.00
- — Z (S) $4400.00
1910.22 A01
- Issued
- May 31, 2012
- Abate by
- Jun 26, 2012
- Penalty
- Initial $4,400 · Current $3,000 Reduced
Recent events (2)
- — I (S) $3000.00
- — Z (S) $4400.00
1910.22 A02
- Issued
- May 31, 2012
- Abate by
- Jul 17, 2012
Recent events (2)
- — I (S)
- — Z (S)
1910.132 A
- Issued
- May 31, 2012
- Abate by
- Jun 5, 2012
- Penalty
- Initial $3,300 · Current $1,500 Reduced
Recent events (2)
- — I (S) $1500.00
- — Z (S) $3300.00
1910.146 C02
- Issued
- May 31, 2012
- Abate by
- Jun 5, 2012
- Penalty
- Initial $4,400 · Current $1,000 Reduced
Recent events (2)
- — I (O) $1000.00
- — Z (S) $4400.00
1910.147 C06 I
- Issued
- May 31, 2012
- Abate by
- Jul 17, 2012
- Penalty
- Initial $4,400 · Current $2,000 Reduced
Recent events (2)
- — I (O) $2000.00
- — Z (S) $4400.00
1910.178 P01
- Issued
- May 31, 2012
- Abate by
- Jun 5, 2012
- Penalty
- Initial $4,400 · Current $2,500 Reduced
Recent events (2)
- — I (S) $2500.00
- — Z (S) $4400.00
1910.179 B05
- Issued
- May 31, 2012
- Abate by
- Jun 26, 2012
- Penalty
- Initial $5,500 · Current $2,000 Reduced
Recent events (2)
- — I (O) $2000.00
- — Z (S) $5500.00
1910.179 H04
- Issued
- May 31, 2012
- Abate by
- Jun 26, 2012
- Penalty
- Initial $7,000 · Current $2,500 Reduced
Recent events (2)
- — I (S) $2500.00
- — Z (S) $7000.00
1910.179 J02
- Issued
- May 31, 2012
- Abate by
- Jun 26, 2012
1910.179 L03 III
- Issued
- May 31, 2012
- Abate by
- Jun 26, 2012
1910.253 A03
- Issued
- May 31, 2012
- Abate by
- Jun 5, 2012
- Penalty
- Initial $3,300
Recent events (2)
- — I (O)
- — Z (S) $3300.00
1910.254 D08
- Issued
- May 31, 2012
- Abate by
- Jun 5, 2012
- Penalty
- Initial $4,400 · Current $1,000 Reduced
Recent events (2)
- — I (O) $1000.00
- — Z (S) $4400.00
1910.303 F01
- Issued
- May 31, 2012
- Abate by
- Jun 5, 2012
- Penalty
- Initial $3,300
Recent events (2)
- — I (O)
- — Z (S) $3300.00
1910.303 G02 I
- Issued
- May 31, 2012
- Abate by
- Jun 5, 2012
- Penalty
- Initial $4,400 · Current $3,000 Reduced
Recent events (2)
- — I (S) $3000.00
- — Z (S) $4400.00
1910.305 G01 IVA
- Issued
- May 31, 2012
- Abate by
- Jun 5, 2012
- Penalty
- Initial $3,300 · Current $3,000 Reduced
Recent events (2)
- — I (S) $3000.00
- — Z (S) $3300.00
1910.334 A04
- Issued
- May 31, 2012
- Abate by
- Jun 5, 2012
- Penalty
- Initial $5,500 · Current $3,000 Reduced
Recent events (2)
- — I (S) $3000.00
- — Z (S) $5500.00
1910.37 B02
- Issued
- May 31, 2012
- Abate by
- Jun 5, 2012
1910.303 B02
- Issued
- May 31, 2012
- Abate by
- Jun 5, 2012
1910.305 G01 IVB
- Issued
- May 31, 2012
- Abate by
- Jun 5, 2012
1910.305 G01 IVC
- Issued
- May 31, 2012
- Abate by
- Jun 5, 2012
More inspections at AZZ INC DBA AZZ Galvanizing Services
View AZZ INC DBA AZZ Galvanizing Services's full OSHA safety record →
More inspections in this industry (NAICS 332812)
More inspections in MS
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 315306365.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.