Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: HYPER ALLOYS INC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of HYPER ALLOYS INC in 29153 GROESBECK HWY, ROSEVILLE, MI 48066 (NAICS 332322). OSHA activity number 315398735.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Hyper Alloys INC — free Get an email when a new federal OSHA severe-injury report for Hyper Alloys INC is published. One employer, no account, unsubscribe in one click.
Establishment
HYPER ALLOYS INC
Site address
29153 GROESBECK HWY
City
ROSEVILLE
State
MI
ZIP
48066
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332322
SIC code (legacy)
3444
Employees
22
Ownership type
A
Industry flags
Manufacturing safety.

9 citations on file for this inspection.

4081003403

Serious 3 instances 3 exposed
Issued
Aug 22, 2013
Abate by
Sep 24, 2013
Penalty
Initial $250 · Current $125 Reduced
Recent events (2)
  • — I (S) $125.00
  • — Z (S) $250.00

4081003405

Serious 3 instances 3 exposed
Issued
Aug 22, 2013
Abate by
Sep 24, 2013
Penalty
Initial $250 · Current $125 Reduced
Recent events (2)
  • — I (S) $125.00
  • — Z (S) $250.00

4081244802

Serious 2 instances 1 exposed
Issued
Aug 22, 2013
Abate by
Aug 22, 2013
Penalty
Initial $250 · Current $100 Reduced
Recent events (2)
  • — I (S) $100.00
  • — Z (S) $250.00

4081261702

Serious 1 instance 2 exposed
Issued
Aug 22, 2013
Abate by
Sep 24, 2013
Penalty
Initial $250 · Current $125 Reduced
Recent events (2)
  • — I (S) $125.00
  • — Z (S) $250.00

4081263101

Serious 1 instance 2 exposed
Issued
Aug 22, 2013
Abate by
Sep 24, 2013
Penalty
Initial $250 · Current $125 Reduced
Recent events (2)
  • — I (S) $125.00
  • — Z (S) $250.00

4081263501 B

Serious 1 instance 1 exposed
Issued
Aug 22, 2013
Abate by
Sep 24, 2013
Penalty
Initial $200 · Current $100 Reduced
Recent events (2)
  • — I (S) $100.00
  • — Z (S) $200.00

4081264102

Serious 2 instances 1 exposed
Issued
Aug 22, 2013
Abate by
Sep 24, 2013
Penalty
Initial $200 · Current $100 Reduced
Recent events (2)
  • — I (S) $100.00
  • — Z (S) $200.00

1910.303 G01

Other-than-serious 1 instance 2 exposed
Issued
Aug 22, 2013
Abate by
Sep 24, 2013

4081496501

Other-than-serious 1 instance 1 exposed
Issued
Aug 22, 2013
Abate by
Sep 24, 2013

View Hyper Alloys INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 315398735.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.