OSHA Inspection: BILLED OUT CONSTRUCTION, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BILLED OUT CONSTRUCTION, INC. in BUILDING 8 KENAN LOOP, JACKSONVILLE, NC 28546 (NAICS 238130). OSHA activity number 315449959.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Billed OUT Construction, INC. — free Get an email when a new federal OSHA severe-injury report for Billed OUT Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
BUILDING 8 KENAN LOOP
City
JACKSONVILLE
State
NC
ZIP
28546
Mailing
198 JONES ST, CEDAR POINT, NC 28584
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
SIC code (legacy)
1751
Employees
14
Ownership type
A
Industry flags
Construction safety.

11 citations on file for this inspection.

95012901

Serious 1 instance 2 exposed
Issued
Mar 2, 2012
Abate by
Mar 7, 2012
Penalty
Initial $1,400 · Current $1,050 Reduced
North Carolina General Statute 95-129(1) of the Occupational Safety and
Health Act of North Carolina:  The
employer did not furnish each of his employees conditions of employment
and a place of employment free from
recognized hazards that were causing or likely to cause death or serious
physical harm to employees in that
employees were exposed to falls from elevation and struck by hazards:
a)job site - 2 employees were working within the truss web to install
trusses and decking at a peak
height of 22 feet and an eve height of 16 feet above the ground.  The
trusses were not stabilized
against roll/collapse in that they had not been provided with proper
restraint/bracing for the top
chord, web member plane, or bottom chord.
ABATEMENT NOTE:
1)Among other methods, one feasible and acceptable abatement method to
correct these hazards is
to provide and install diagonal and/or lateral bracing to the top chord,
web member plane, or
bottom chord. .  This can be accomplished by following the instructions in
The Truss
Installation and Temporary Bracing of the Truss Plate Institute that were
provided by the truss
manufacturer and were available on the job site or have a professional
engineer design a
temporary bracing system.  This diagonal bracing would stabilize and
strengthen the truss
system to permit workers to be on or inside the web to complete the
installation.  An
explanation of the use of diagonal/lateral bracing is also included in OPN
109B, which was
provided by the CSHO.
Reference:Hazards recognized and addressed in the industry standard
Commentary and Recommendations
for Handling, Installing, and Bracing Metal Connected Wood Trusses by
Truss Plate Institute
(HIB091) and the Truss Installation and Temporary Bracing by Truss Plate
Institute (BCSI-B1,
2, and 3).
Recent events (2)
  • — I (S) $1050.00
  • — Z (S) $1400.00

1926.501 C

Serious 1 instance 2 exposed
Issued
Mar 2, 2012
Abate by
Mar 7, 2012
Penalty
Initial $300 · Current $225 Reduced
Recent events (2)
  • — I (S) $225.00
  • — Z (S) $300.00

1926.502 D15

Serious 1 instance 2 exposed
Issued
Mar 2, 2012
Abate by
Mar 7, 2012
Penalty
Initial $1,400 · Current $1,050 Reduced
Recent events (2)
  • — I (S) $1050.00
  • — Z (S) $1400.00

1926.501 B13

Serious 1 instance 1 exposed
Issued
Mar 2, 2012
Abate by
Mar 7, 2012
Recent events (2)
  • — I (S)
  • — Z (S)

1926.20 B02

Serious 1 instance 2 exposed
Issued
Mar 2, 2012
Abate by
Apr 18, 2012
Recent events (2)
  • — I (S)
  • — Z (S)

1926.503 A02

Serious 1 instance 14 exposed
Issued
Mar 2, 2012
Abate by
Apr 18, 2012
Penalty
Initial $1,400 · Current $1,050 Reduced
Recent events (2)
  • — I (S) $1050.00
  • — Z (S) $1400.00

1926.503 B01

Serious 1 instance 14 exposed
Issued
Mar 2, 2012
Abate by
Apr 18, 2012
Recent events (2)
  • — I (S)
  • — Z (S)

1926.150 C01 I

Other-than-serious 2 instances 6 exposed
Issued
Mar 2, 2012
Abate by
Mar 7, 2012
Recent events (2)
  • — I (O)
  • — Z (O)

1910.1200 E01

Other-than-serious 1 instance 6 exposed
Issued
Mar 2, 2012
Abate by
Apr 18, 2012
Penalty
Initial $150 · Current $113 Reduced
Recent events (2)
  • — I (O) $113.00
  • — Z (O) $150.00

1910.1200 G01

Other-than-serious 1 instance 6 exposed
Issued
Mar 2, 2012
Abate by
Mar 7, 2012
Recent events (2)
  • — I (O)
  • — Z (O)

1910.1200 H01

Other-than-serious 1 instance 6 exposed
Issued
Mar 2, 2012
Abate by
Mar 28, 2012
Recent events (2)
  • — I (O)
  • — Z (O)

View Billed OUT Construction, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 315449959.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.