ATHENS, AL —
OSHA Inspection: ROW MANUFACTURING
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ROW MANUFACTURING in 210 DURHAM DRIVE, ATHENS, AL 35611 (NAICS 333514). OSHA activity number 315509752.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ROW MANUFACTURING
- Site address
- 210 DURHAM DRIVE
- City
- ATHENS
- State
- AL
- ZIP
- 35611
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 333514
- SIC code (legacy)
- 3544
- Employees
- 15
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
13 citations on file for this inspection.
1910.23 C01
- Issued
- Sep 20, 2011
- Abate by
- Sep 28, 2011
- Penalty
- Initial $2,400 · Current $1,200 Reduced
Recent events (2)
- — I (S) $1200.00
- — Z (S) $2400.00
1910.212 A01
- Issued
- Sep 20, 2011
- Abate by
- Nov 15, 2011
- Penalty
- Initial $2,400 · Current $1,200 Reduced
Recent events (2)
- — I (S) $1200.00
- — Z (S) $2400.00
1910.212 B
- Issued
- Sep 20, 2011
- Abate by
- Nov 15, 2011
- Penalty
- Initial $2,400 · Current $1,200 Reduced
Recent events (2)
- — I (S) $1200.00
- — Z (S) $2400.00
1910.215 A04
- Issued
- Sep 20, 2011
- Abate by
- Sep 28, 2011
- Penalty
- Initial $2,400 · Current $1,200 Reduced
Recent events (2)
- — I (S) $1200.00
- — Z (S) $2400.00
1910.215 B09
- Issued
- Sep 20, 2011
- Abate by
- Sep 28, 2011
Recent events (2)
- — I (S)
- — Z (S)
1910.253 B04 III
- Issued
- Sep 20, 2011
- Abate by
- Sep 28, 2011
- Penalty
- Initial $2,400 · Current $1,200 Reduced
Recent events (2)
- — I (S) $1200.00
- — Z (S) $2400.00
1910.305 G02 III
- Issued
- Sep 20, 2011
- Abate by
- Sep 28, 2011
- Penalty
- Initial $2,400 · Current $1,200 Reduced
Recent events (2)
- — I (S) $1200.00
- — Z (S) $2400.00
1904.29 A
- Issued
- Sep 20, 2011
- Abate by
- Oct 14, 2011
Recent events (2)
- — I (O)
- — Z (O)
1910.22 D01
- Issued
- Sep 20, 2011
- Abate by
- Oct 25, 2011
Recent events (2)
- — I (O)
- — Z (O)
1910.147 C01
- Issued
- Sep 20, 2011
- Abate by
- Nov 30, 2011
Recent events (2)
- — I (O)
- — Z (O)
1910.157 G01
- Issued
- Sep 20, 2011
- Abate by
- Oct 25, 2011
Recent events (2)
- — I (O)
- — Z (O)
1910.178 L05
- Issued
- Sep 20, 2011
- Abate by
- Nov 15, 2011
Recent events (2)
- — I (O)
- — Z (O)
1910.1200 E01
- Issued
- Sep 20, 2011
- Abate by
- Nov 30, 2011
Recent events (2)
- — I (O)
- — Z (O)
More inspections at ROW Manufacturing
View ROW Manufacturing's full OSHA safety record →
More inspections in this industry (NAICS 333514)
More inspections in AL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 315509752.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.