ROSE BUD, AR ·
OSHA Inspection: CALDWELL MILLING COMPANY, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CALDWELL MILLING COMPANY, INC. in 504 HWY.5 SOUTH, ROSE BUD, AR 72137 (NAICS 311119). OSHA activity number 315554410.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CALDWELL MILLING COMPANY, INC.
- Site address
- 504 HWY.5 SOUTH
- City
- ROSE BUD
- State
- AR
- ZIP
- 72137
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (N)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 311119
- SIC code (legacy)
- 2048
- Employees
- 61
- Ownership type
- Private (A)
Citations
18 citations on file for this inspection.
5(a)(1)
- Issued
- Oct 18, 2011
- Abate by
- Dec 14, 2011
- Penalty
- Initial $3,600 · Current $1,800 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: At the truck shop on or about June 22, 2011 and prior thereto, schedule 40 PVC pipe was used to transport compressed air in the shop to air up tires. This condition exposed employees to the hazard of being struck by plastic shards in the event of a pipe failure or rupture. Among other methods, feasible and acceptable means to correct the hazard include: (1) encasing the PVC and PVC pipe fittings in shatter resistant materials, e.g. metal pipes, wooden boxed conduit lined with fiberglass, steel box conduits, (2) remove the PVC pipe and PVC fittings, and install plastic pipes and pipe fittings (ABS), as specified in ANSI/ASME B31.8-1986, Gas Transmission and Distribution Piping Systems Standard and ASTM D1785-86, Standard Specification for Polyvinyl Chloride Plastic Pipe, Schedules 40, 80 and 120 and ASTM D2513-86a, Standard Specification for Thermoplastic Gas Pressure Piping Systems, (3) remove the PVC pipes and PVC pipe fittings and install metal pipe and fittings.
Recent events (2)
- · I (S) $1800.00
- · Z (S) $3600.00
1910.23 A05
- Issued
- Oct 18, 2011
- Abate by
- Oct 28, 2011
- Penalty
- Initial $3,600 · Current $1,800 Reduced
Recent events (2)
- · I (S) $1800.00
- · Z (S) $3600.00
1910.23 C01
- Issued
- Oct 18, 2011
- Abate by
- Nov 14, 2011
- Penalty
- Initial $4,500 · Current $2,200 Reduced
Recent events (2)
- · I (S) $2200.00
- · Z (S) $4500.00
1910.132 A
- Issued
- Oct 18, 2011
- Abate by
- Oct 28, 2011
- Penalty
- Initial $3,600 · Current $3,600
Recent events (2)
- · I (S) $3600.00
- · Z (S) $3600.00
1910.133 A01
- Issued
- Oct 18, 2011
- Abate by
- Oct 28, 2011
- Penalty
- Initial $3,600 · Current $3,600
Recent events (2)
- · I (S) $3600.00
- · Z (S) $3600.00
1910.178 L02 II
- Issued
- Oct 18, 2011
- Abate by
- Dec 14, 2011
- Penalty
- Initial $4,500 · Current $2,200 Reduced
Recent events (2)
- · I (S) $2200.00
- · Z (S) $4500.00
1910.219 D01
- Issued
- Oct 18, 2011
- Abate by
- Oct 28, 2011
- Penalty
- Initial $3,600 · Current $1,800 Reduced
Recent events (2)
- · I (S) $1800.00
- · Z (S) $3600.00
1910.219 E01 I
- Issued
- Oct 18, 2011
- Abate by
- Oct 28, 2011
Recent events (2)
- · I (S)
- · Z (S)
1910.305 G02 III
- Issued
- Oct 18, 2011
- Abate by
- Oct 28, 2011
- Penalty
- Initial $4,500 · Current $2,200 Reduced
Recent events (2)
- · I (S) $2200.00
- · Z (S) $4500.00
1910.132 A
- Issued
- Oct 18, 2011
- Abate by
- Oct 28, 2011
- Penalty
- Current $3,000
Recent events (3)
- · Q $3600.00
- · I (S) $3000.00
- · Z (S) $3600.00
1910.133 A01
- Issued
- Oct 18, 2011
- Abate by
- Oct 28, 2011
Recent events (3)
- · Q $3600.00
- · I (S)
- · Z (S) $3600.00
1904.29 A
- Issued
- Oct 18, 2011
- Abate by
- Nov 4, 2011
- Penalty
- Initial $900
Recent events (2)
- · I (O)
- · Z (O) $900.00
1904.29 B01
- Issued
- Oct 18, 2011
- Abate by
- Nov 4, 2011
Recent events (2)
- · I (O)
- · Z (O)
1910.132 E
- Issued
- Oct 18, 2011
- Abate by
- Oct 28, 2011
Recent events (2)
- · I (O)
- · Z (O)
1910.169 B03 III
- Issued
- Oct 18, 2011
- Abate by
- Oct 28, 2011
Recent events (2)
- · I (O)
- · Z (O)
1910.272 M03
- Issued
- Oct 18, 2011
- Abate by
- Oct 28, 2011
Recent events (2)
- · I (O)
- · Z (O)
1910.305 B01 I
- Issued
- Oct 18, 2011
- Abate by
- Oct 28, 2011
Recent events (2)
- · I (O)
- · Z (O)
1910.305 B02 I
- Issued
- Oct 18, 2011
- Abate by
- Oct 28, 2011
Recent events (2)
- · I (O)
- · Z (O)
More inspections in this industry (NAICS 311119)
More inspections in AR
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 315554410.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.