GREENSBORO, NC ·
OSHA Inspection: EVENT COORDINATORS, INC.
Accident-driven inspection · Safety discipline
At a glance
On , OSHA opened an accident-driven safety inspection of EVENT COORDINATORS, INC. in 1921 W. LEE ST., GREENSBORO, NC 27403 (NAICS 713990). OSHA activity number 315609602.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- EVENT COORDINATORS, INC.
- Site address
- 1921 W. LEE ST.
- City
- GREENSBORO
- State
- NC
- ZIP
- 27403
- Mailing
- PO BOX 5589, AUGUSTA, GA 30916
What kind of inspection was it?
- Inspection type
- Accident-driven (A)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 713990
- SIC code (legacy)
- 7999
- Employees
- 50
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
15 citations on file for this inspection.
95012901
- Issued
- Sep 9, 2011
- Abate by
- Sep 14, 2011
- Penalty
- Initial $3,500 · Current $3,500
General-duty citation text
North Carolina General Statute95-129(1) of the Occupational Safety and Health Act of North Carolina: The employer did not furnish each of his employees conditions of employment and a place of employment free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a struck by hazard: a)job site- employees were using a 5/8" wire rope on a hydraulic winch hoist to disassemble a large Giant Seattle Wheel ( ferris wheel). The wire rope was attached to a thimble and hook and held in place with an aluminum swage fitting. The swage fitting failed allowing the sweeps of the Wheel to swing. The sweeps struck a walk board which was near the axle of the Wheel causing an employee to fall from walk board to the pavement 44 feet below and also struck a man basket on the equipment throwing the employee from the man basket to the pavement approximately 28 feet below on or about 5/16/11. Abatement Note: Among other methods, one feasible abatement method to correct this hazard is to consult the manufacturer of the wire rope cable system and use standard load charts to determine safe working limits of all components in the system. Components can be selected to insure that the safe working load is not exceeded.
95012901
- Issued
- Sep 9, 2011
- Abate by
- Sep 14, 2011
- Penalty
- Initial $3,500
General-duty citation text
North Carolina General Statute95-129(1) of the Occupational Safety and Health Act of North Carolina: The employer did not furnish each of his employees conditions of employment and a place of employment free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a struck by hazard: a)job site- employees were using a 5/8" wire rope on a hydraulic winch hoist to disassemble a large Giant Seattle Wheel ( ferris wheel). The wire rope cable was attached to a thimble and hook and held in place with a aluminum swage fitting. The wire rope cable had more than 3 broken wires in one strand and was distorted and would not lay flat, prior to or on 5/16/11. Abatement Note: Among other methods, one feasible abatement method to correct this hazard is to follow the manufacturer's instructions for wire rope cable inspections provided in section 8 of the Wheel's service manual and the recommendations for when to remove wire rope cable from service.
Recent events (2)
- · I (S)
- · Z (S) $3500.00
95012901
- Issued
- Sep 9, 2011
- Abate by
- Sep 14, 2011
- Penalty
- Initial $1,500
General-duty citation text
North Carolina General Statute95-129(1) of the Occupational Safety and Health Act of North Carolina: The employer did not furnish each of his employees conditions of employment and a place of employment free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a struck by hazard: a)job site- employees were using a Skyhoist boom truck to disassemble a large Giant Seattle Wheel ( ferris wheel). A hook had been attached to the wire rope of the boom truck using wire rope clips. Two of the three wire rope clips were installed improperly with the saddles of the clips on the dead rope side. Abatement Note: Among other methods, one feasible abatement method to correct this hazard is to follow ANSI B30.5-1968, Section 5-1.7.3- Reeving and install the wire rope saddles only on the live or long end of the wire rope cable.
Recent events (2)
- · I (S)
- · Z (S) $1500.00
1910.23 C01
- Issued
- Sep 9, 2011
- Abate by
- Sep 14, 2011
- Penalty
- Initial $3,500 · Current $2,625 Reduced
Recent events (2)
- · I (S) $2625.00
- · Z (S) $3500.00
1910.23 D01 III
- Issued
- Sep 9, 2011
- Abate by
- Sep 14, 2011
- Penalty
- Initial $900 · Current $675 Reduced
Recent events (2)
- · I (S) $675.00
- · Z (S) $900.00
1910.67 C02 V
- Issued
- Sep 9, 2011
- Abate by
- Sep 14, 2011
- Penalty
- Initial $2,500 · Current $1,875 Reduced
Recent events (2)
- · I (S) $1875.00
- · Z (S) $2500.00
1910.132 D01
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $3,500 · Current $2,625 Reduced
Recent events (2)
- · I (S) $2625.00
- · Z (S) $3500.00
1910.133 A01
- Issued
- Sep 9, 2011
- Abate by
- Sep 14, 2011
- Penalty
- Initial $900 · Current $675 Reduced
Recent events (2)
- · I (S) $675.00
- · Z (S) $900.00
1910.135 A01
- Issued
- Sep 9, 2011
- Abate by
- Sep 14, 2011
- Penalty
- Initial $1,500 · Current $1,125 Reduced
Recent events (2)
- · I (S) $1125.00
- · Z (S) $1500.00
1910.136 A
- Issued
- Sep 9, 2011
- Abate by
- Sep 14, 2011
- Penalty
- Initial $1,500 · Current $1,125 Reduced
Recent events (2)
- · I (S) $1125.00
- · Z (S) $1500.00
1910.147 C04 II
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $2,800 · Current $2,100 Reduced
Recent events (2)
- · I (S) $2100.00
- · Z (S) $2800.00
1910.147 C06 I
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
1910.180 H03 IB
- Issued
- Sep 9, 2011
- Abate by
- Sep 14, 2011
- Penalty
- Initial $1,500 · Current $1,125 Reduced
Recent events (2)
- · I (S) $1125.00
- · Z (S) $1500.00
1910.180 H04 II
- Issued
- Sep 9, 2011
- Abate by
- Sep 14, 2011
1910.1200 E01
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
More inspections in this industry (NAICS 713990)
More inspections in NC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 315609602.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.