BEAUMONT, TX ·
OSHA Inspection: E I DU PONT DE NEMOURS & CO INC (DUPONT BEAUMONT)
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of E I DU PONT DE NEMOURS & CO INC (DUPONT BEAUMONT) in STATE HWY 347, BEAUMONT, TX 77705 (NAICS 325188). OSHA activity number 315723312.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- E I DU PONT DE NEMOURS & CO INC (DUPONT BEAUMONT)
- Site address
- STATE HWY 347
- City
- BEAUMONT
- State
- TX
- ZIP
- 77705
- Mailing
- P. O. BOX 3269, BEAUMONT, TX 77704
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325188
- SIC code (legacy)
- 2819
- Employees
- 75
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
14 citations on file for this inspection.
1910.106 C04
- Issued
- May 1, 2012
- Abate by
- Jun 4, 2012
- Penalty
- Initial $7,000 · Current $3,500 Reduced
General-duty citation text
AVD:29 CFR 1910.106(c)(4) The employer failed to ensure Piping systems were substantially supported and protected against physical damage and excessive stresses arising from settlement, vibration, expansion, or contraction. a)This condition was most recently observed in the DHN Unit of the DuPont facility near the North Reactor where process pipe that carries flammable liquids was observed. The pipe was not properly supported and protected against physical damage and excessive stresses. b)This condition was most recently observed in the Aniline Unit of the DuPont facility where process pipe that carries flammable liquids was observed. The pipe was not properly supported and protected against physical damage and excessive stresses.
Recent events (2)
- · J (S) $3500.00
- · Z (S) $7000.00
1910.106 C05
- Issued
- May 1, 2012
- Abate by
- May 31, 2013
- Penalty
- Initial $5,000 · Current $2,500 Reduced
General-duty citation text
AVD:29 CFR 1910.106(c)(5) The employer failed ensure piping that is subject to external corrosion is painted or otherwise protected against corrosion. a)This condition was observed in the DHN Unitof the DuPont facility where process piping carrying flammable liquids was subjected to external corrosion and was not painted or protected against corrosion. Examples include: -Inlet spool to RV-J-0111, line #739 shown on P&ID B161019 -Inlet spool to RV-J-0110, line #705 shown on P&ID B161018 -Vacuum Jet System (7080-35) for purge column -Pipe spool A625 at nozzle on bottom of the Letdown Separator (7020-6) -Hydrogen line on upper level on Aniline Unit -Inlet spool to Letdown Tank (7020-04), line #256 shown on P&ID B161143 b)This condition was observed in the Aniline Unit of the DuPont facility where process piping carrying flammable liquids was subjected to external corrosion and was not painted or protected against corrosion. Examples include: -Purge/extraction piping attached to large diameter piping carrying benzene and nitrobenzene to the Quench Column. -Hot decanter vent line on 4th level of DHN coming off South #2 Reactor -Nitrogen piping on 4th level of DHN -Glass-lined pipe (line #7110-1-7) from North (#1) Reactor -Valve on top of North (#1) Reactor to 2PT2577 -Piping off top of South (#2) Reactor -Piping off bottom of North (#1) Reactor from the Cool Decanter -Process water line from the Cool Decanter
Recent events (2)
- · J (S) $2500.00
- · Z (S) $5000.00
1910.106 I03 II
- Issued
- May 1, 2012
- Abate by
- Jun 4, 2012
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.106(i)(3)(ii): Unfired vessels were not constructed in accordance with the Code for Unfired Pressure Vessels, Section VIII of the ASME Boiler and Pressure Vessel Code-1968: a)This condtion was observed at the, at E. I. du Pont de Nemours and Company, in Beaumont, TX, in the Aniline Unit where the employer did not ensure that the Purge Column was constructed in accordance with Section VIII of the ASME Boiler and Pressure Vessel Code, when the employer failed to ensure RV-J-0111 relieved to a safe location, exposing employees to a toxic material.
Recent events (2)
- · J (S)
- · Z (S) $7000.00
1910.119 D03 II
- Issued
- May 1, 2012
- Abate by
- Jun 4, 2012
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(d)(3)(ii): The employer did not document that the equipment in the process complied with recognized and generally accepted good engineering practices: a)This condition was most recently observed, at the E. I. du Pont de Nemours and Company in Beaumont, TX when the employer failed to identify and examine that the loss of reflux could result in an overpressure condition on the Purge Column in accordance API Standard 521. b) This condition was most recently observed, at the E. I. du Pont de Nemours and Company in Beaumont, TX when the employer failed to identify and examine that liquid level above the level chamber could result in an overpressure condition on the Purge Column.on
Recent events (2)
- · J (S)
- · Z (S) $7000.00
1910.119 E01
- Issued
- May 1, 2012
- Abate by
- Jun 4, 2012
General-duty citation text
29 CFR 1910.119(e)(1): The process hazard analysis was not appropriate to the complexity of the process and did not identify, evaluate, and address the control of the hazards involved in the process. a)This condition was observed at the E. I. du Pont de Nemours and Company, in Beaumont, TX, where the employer did not ensure that the Process Hazard Analysis (PHA) was appropriate to the complexity of the process, and that the PHA identified, evaluated and addressed control of the hazard involved in the process when the employer failed to ensure that RV-J-0111 relieved to a safe location, therefore exposing employees to an atmosheric release of toxic material.c
Recent events (2)
- · J (S)
- · Z (S)
1910.119 F01
- Issued
- May 1, 2012
- Abate by
- May 4, 2012
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(f)(1): The employer's shall develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and shall address steps for initial startup: a)The condition was most recently observed at E. I. du Pont de Nemours and Company, in Beaumont, TX, the employer did not ensure that operating procedures used in the initial startup of the purge column, provided clear instructions which was used to bring the column up after a turnaround. The use of the procedure resulted in over pressuring the column and relieving carcinogens such as 4-ADP and Aniline into the atmosphere.
Recent events (2)
- · J (S)
- · Z (S) $7000.00
1910.119 F01 ID
- Issued
- May 1, 2012
- Abate by
- Jun 4, 2012
General-duty citation text
29 CFR 1910.119(f)(1)(i)(D): The employer's written operating procedures covering the steps for each operating phase did not address emergency shutdown including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown is executed in a safe and timely manner: a)This condition was most recently observed, at E. I. du Pont de Nemours and Company, in Beaumont, TX, in the Aniline Unit where the employer did not ensure that the operator on CCR#1 had emergency shutdown procedures to ensure that the responsibility of an emergency shutdown was executed in a safe and timely manner, during the incident on November 3, 2011.ber
Recent events (2)
- · J (S)
- · Z (S)
1910.119 G01 I
- Issued
- May 1, 2012
- Abate by
- Jun 4, 2012
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(g)(1)(i): The employer did not train each employee, before being involved inoperating a newly assigned process, in an overivew of the process and in the operating procedures as specified in 29 CFR 1910.119(f): a)This condition was most recently observed, at E. I. du Pont de Nemours and Company, in Beaumont, TX, in the Aniline Unit where the employer did not ensure that all board operators working on CCR#1, the Aniline Unit, were trained in the operating procedures before operating a newly assigned process.
Recent events (2)
- · J (S)
- · Z (S) $7000.00
1910.119 G03
- Issued
- May 1, 2012
- Abate by
- Jun 4, 2012
General-duty citation text
29 CFR 1910.119(g)(3): The employer did not prepare a means of verifying that the employee had received and understood the training required by 29 CFR 1910.119(g): a)This condition was most recently observed, at E. I. du Pont de Nemours and Company, in Beaumont, TX, in the Aniline Unit where the employer did not ensure that all board operators working on CCR#1, the Aniline Unit, had a prepared record verifying that each employee involved in operating a process a had received and understood the training required.
Recent events (2)
- · J (S)
- · Z (S)
1910.119 J04 I
- Issued
- May 1, 2012
- Abate by
- May 31, 2013
- Penalty
- Initial $7,000 · Current $3,000 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(i): Inspections and tests were not performed on process equipment to maintain its mechanical integrity: This condition was observed in the Aniline and DHN units of the DuPont facility in Beaumont, Texas, when the employer failed to inspect critical process equipment to identify deficiencies and have them corrected to assure the integrity of the process is maintained. Examples of deficiencies observed by the CSHO include: 1.Unsecured and/or unanchored piping supports, such as the support on the 3" cooling water crossoverline on the upper level of the Aniline Unit, which was found not securely anchored to the platform. 2.Damaged or inadequate piping supports, such as the pipe support o the 1" hot decanter vent line (J284) in the DHN, which was observed missing the clamping fastener/bolt and instead utilizing wire to keep it on the pipe. 3.Missing and/or damaged insulation on piping, such as the steamline on the upper level of the Aniline Unit that supplies steam for heat tracing, which was found not to be insulated and exposing operators to possible burns when they are conducting rounds through the area. 4.Missing piping components, such as the valve (P92C) on top of the North (#1) DHN Reactor, and the valve (SV577) on glass lined pipe 7110-1-7 of the DHN Unit. Both valves could not be operated because they were missing their handles. 5.Damaged piping components, such as external surface pitting observed on the body of the vacuum jet system at the purge column of the Aniline Unit, or broken steam trace lines. 6.Degraded coatings, such as missing, cracked or spalled paint on piping and vessels and equipment identification markers. 7.Severe and unarrested external corrosion on process piping and vessels, such as the bottom nozzle of the Letdown Separator (7020-06) and pipe spool A625 in the Aniline Unit. 8.Leaks in the heat trace system on several levels of the DHN Unit, including several areas where steam and condensate were spraying heavily into walkways that operators uses for access to equipment.
Recent events (2)
- · J (S) $3000.00
- · Z (S) $7000.00
1910.119 J05
- Issued
- May 1, 2012
- Abate by
- Jun 4, 2012
General-duty citation text
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits [as defined by process information in 29 CFR 1910.119(d)] before further use or in a safe and timely manner: a)This condition was most recently observed in the Aniline and DHN process areas of the DuPont facility in Beaumont, Texas when the employer operated deficient process equipment without taking necessary means to assure safe operation. Deficiencies present included defective heat tracing, steam leaks in areas where operators are required to enter and do work, and corrosion-damaged equipment. Examples of deficient conditions include: 1.Heavy steam and condensate sprays from damaged steam tracing in walk/pathway areas that are required by operators to access equipment in the DHN and Aniline production areas. 2.Damaged heat trace system with open ends blowing steam into walkway areas and causing external corrosion on piping and other process equipment. 3.Severely corrosion-damaged ducting in fresh air system of DHN ECR. 4.The Letdown Separator (7020-06) vessel head, nozzle, and associated piping (spool A625) integrity is questionable due to heavy external corrosion. b)This condition was most recently observed in piping in the Aniline and DHN process areas of the DuPont facility in Beaumont, Texas, when the employer operated deficient process piping systems without taking necessary means to assure safe operation. Deficiencies included valves with missing handles, piping systems with uncontrolled external corrosion, and open-ended process piping.
Recent events (2)
- · J (S)
- · Z (S)
5(a)(1)
- Issued
- May 1, 2012
- Abate by
- Dec 31, 2013
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(j)(6)(iii): The employer did not assure that maintenance materials, spare parts and equipment were suitable for the process application for which they were used: a)This condition was most recently observed at E. I. du Pont de Nemours and Company, in Beaumont, TX, in the Aniline Unit, where the employer did not ensure that maintenance materials, spare parts and equipment were suitable for the process when the incorrect gasket was installed on the steam jet nozzle of a PSM critical vacuum jet and as a result, the Purge Column in the Aniline Unit over pressurize and relieve it's contents to atmosphere.
Recent events (2)
- · J (S) $7000.00
- · Z (S) $7000.00
1910.212 A01
- Issued
- May 1, 2012
- Abate by
- May 4, 2012
- Penalty
- Initial $4,000 · Current $2,000 Reduced
General-duty citation text
29 CFR 1910.212(a)(1): Machine guarding was not provided to protect operator(s) and other employees from hazard(s) created by rotating parts. a)The condition was most recently observed at the E. I. du Pont de Nemours and Company, in Beaumont, TX, when the employer did not adequately provide guarding on a rotating shaft located on the motor of an Ingersoll-Rand gas expander in the AOP Unit.der
Recent events (2)
- · J (S) $2000.00
- · Z (S) $4000.00
1910.119 D
- Issued
- May 1, 2012
- Abate by
- Jun 4, 2012
General-duty citation text
29 CFR 1910.119(d): The employer did not develop a written compilation of process safety information on hazardous chemicals in the process, the technology of the process, and the equipment in the process before conducting the process hazard analysis: a)This condition was most recently observed at the E. I. du Pont de Nemours and Company in Beaumont, TX, in the Aniline Unit, when the employer did not complete a compilation written process safety information before conducting the 2009 Process Hazard Analysis, when the FAA# on the Purge Column was not consistent throughout Process Safety Information. b)This condition was most recently observed at the E. I. du Pont de Nemours and Company, in Beaumont, TX, in the Aniline Unit, when the employer did not complete a compilation written process safety information before conducting the 2009 Process Hazard Analysis, when the P&ID B161019 did not reflect the correct set pressure for RV-J-0111.
Recent events (2)
- · J (O)
- · Z (O)
More inspections in this industry (NAICS 325188)
More inspections in TX