NEDERLAND, TX —
OSHA Inspection: PANDORA METHANOL LLC
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of PANDORA METHANOL LLC in 6570 TWIN CITY HIGHWAY, NEDERLAND, TX 77627 (NAICS 325199). OSHA activity number 315723965.
Where did this inspection happen?
- Establishment
- PANDORA METHANOL LLC
- Site address
- 6570 TWIN CITY HIGHWAY
- City
- NEDERLAND
- State
- TX
- ZIP
- 77627
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325199
- SIC code (legacy)
- 2869
- Employees
- 72
- Ownership type
- A
Citations
8 citations on file for this inspection.
1910.119 D03 IB
- Issued
- Abate by
- Penalty
- Initial $4900.00 · Current $3430.00 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): The employer did not complete a compilation of written process safety information (PSI) including the piping and instrument diagrams (P&ID'S) before conducting any process hazard analysis required by the standard: This violation was most recently observed in the Pandora Methanol (OCI North America) site, when the employer failed to document complete and accurate Process & Instrument Diagrams (P&ID) before conducting Ammonia process hazard analysis (PHA). The following are instances of changes to the ammonia process that are not reflected on the P&IDs used for the PHA: (a)04541-2-50-02J rev5 (used for PHA) -6" GH-021801-DA3A was blinded and abandoned in place -4" block valve on recycle Hydrogen is blinded -2" and 8" valves added to nitrogen pipeline
Recent events (2)
- — I (S) $3430.00
- — Z (S) $4900.00
1910.119 D03 IG
- Issued
- Abate by
General-duty citation text
29 CFR 1910.119(d)(3)(i)(G): The employer did not complete a compilation of written process safety information (PSI) including the material and energy balances before conducting any process hazard analysis required by the standard: This violation was most recently observed in the Pandora Methanol (OCI North America) site, when the employer failed to document complete and accurate material and energy balance before conducting Ammonia process hazard analysis (PHA). The material and energy balance used for the 2011 PHA was missing critical information and did not accurately reflect the process as it exist in the field. Information such as flow rates, temperatures and mixture compositions were either unknown, not made available or inaccurate. a)Node 1A mixture of Hydrogen, nitrogen and ammonia arrives at Valve XV-5599 at a rate of ? SCFH. Composition is ?% Ammonia, ?% Hydrogen and ?% Nitrogen Node 2A mixture of Nitrogen and Ammonia leaves valve XV-5599 at a rate of ? SCFH. Composition is ?% Ammonia, ?% Hydrogen and ?% Nitrogen Node 3Condensate from the steam superheater is returned from the steam drum, and superheated steam at a rate of 59,000 LB/HR, ?psig and ? deg Celsius is fed to the 550 psig superheated steam header Node 4The recycle steam from the Ammonia converter flows at a rate of ? SCFH, ? psig and ? deg Celsius into the steam superheater, where it is collected while generating ? lb/hr steam Liquid ammonia is removed from the bottom of the ammonia separator at a rate of ? lb/hr, and the recycle gas leaves the top of the ammonia separator at a rate of ? SCFH, ? psig and ? deg celsius and sent to the cold heat exchanger where it is heated to ? deg Celsius and sent to the Syn Gas Compressor 3rd stage suction Node 9Ammonia liquid is removed from the ammonia accumulator to the warm ammonia product heater and then let down to the first ammonia chiller and then the ammonia accumulator, where it is stored at a ate of 59,000 lb/hr, ? psig and ? deg Celsius Liquid ammonia at a rate of ? lb/hr, ? psig, deg celsius is also taken from the ammonia accumulator to the ammonia accumulator vent gas chiller Node 10Ammonia rundown product pumps, 215P-101-01/02, boost pressure to ? psig NoteThe current process receives Hydrogen from pipeline, however stream #6 (Pipeline Hydrogen) indicated no flow rate.
Recent events (2)
- — I (S)
- — Z (S)
1910.119 E01
- Issued
- Abate by
- Penalty
- Initial $4900.00 · Current $3430.00 Reduced
General-duty citation text
29 CFR 1910.119(e)(1): The process hazard analysis was not appropriate to the complexity of the process and did not identify, evaluate, and address the control of the hazards involved in the process. This violation was most recently observed at the Pandora Methanol (OCI North America) site, when the employer failed to ensure that the process hazard analysis was appropriate to the complexity of the process and did not posses all of the required process safety data to identify, evaluate and control the hazards involved in the process.
Recent events (2)
- — I (S) $3430.00
- — Z (S) $4900.00
1910.119 I01
- Issued
- Abate by
- Penalty
- Initial $4900.00 · Current $3430.00 Reduced
General-duty citation text
29 CFR 1910.119(i)(1): The employer did not perform a pre-startup safety review for modified facilities when the modification is significant enough to require a change in the process safety information. The employer did not perform a pre-startup safety review (PSSR) prior to the introduction of highly hazardous chemicals to a modified process. This violation was most recently observed in the Pandora Methanol (OCI North America) site, when the employer installed a bypass on the Steam Superheater E-101 due to tube leakage and put the equipment in service prior to performing a pre-startup safety review.
Recent events (2)
- — I (O) $3430.00
- — Z (S) $4900.00
1910.119 J05
- Issued
- Abate by
- Penalty
- Initial $4900.00 · Current $4900.00
General-duty citation text
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits [as defined by process information in 29 CFR 1910.119(d)] before further use or in a safe and timely manner: a) This condition was observed on or about June 13, 2012, in the production area where process piping was observed operating without a bull plug in place to complete the closed end of the piping. b) This condition was observed on or about June 13, 2012, in the Ammonia Process Area, where utility piping connected to the steam jacket of 216V-109 Ammonia Vent Drum was observed having a rupture in the line, expelling steam and condensate from one of the pipe unions.
Recent events (2)
- — I (O) $4900.00
- — Z (S) $4900.00
1910.119 L02 V
- Issued
- Abate by
- Penalty
- Initial $2100.00
General-duty citation text
29 CFR 1910.119(l)(2)(v): The employer did not implement written procedures to manage changes; did not assure that the authorization requirements for the proposed change were addressed prior to any change: The employer did not implement Management of Change procedure (PSM-01-0010) to manage changes in Ammonia process equipment and piping. This violation was most recently observed in the Pandora Methanol (OCI North America) site, when the employer did not ensure the required signatures for review and approve for equipment changes were obtained prior to installation of a bypass on E-101, due to tube leakage.
Recent events (2)
- — I (S)
- — Z (S) $2100.00
1910.119 L02 IV
- Issued
- Abate by
- Penalty
- Current $2100.00
General-duty citation text
29 CFR 1910.119(l)(2)(iv): The employer did not implement written procedures to manage changes to process chemicals, technology, equipments, and procedures; did not assure that the necessary time period for the change was addressed prior to any change: The employer did not implement Management of Change procedure (PSM-01-0010) to manage changes in Ammonia process equipment and piping. This violation was most recently observed in the Pandora Methanol (OCI North America) site, when the employer did not document the expiration date for a temporary MOC to install a bypass on E-101 due to tube leakage.
Recent events (2)
- — I (O) $2100.00
- — Z (S)
1910.219 C03
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $2800.00
General-duty citation text
29 CFR 1910.219(c)(3): Vertical or inclined shafting was not enclosed with stationary casing(s): a) This condition was observed on or about June 13, 2012, where the exposed rotating shaft on a pump was observed to be unguarded.
Recent events (2)
- — I (O) $2800.00
- — Z (S) $2800.00
More inspections in this industry (NAICS 325199)
HOPEWELL, VA—2026-06-17
ADVANSIX RESINS AND CHEMICALS LLC
GEORGETOWN, SC—2026-06-04
77516 - 3V SIGMA USA INC
CICERO, IL—2026-05-28
KOPPERS CARBON MATERIALS LLC
NARROWS, VA—2026-05-19
CELANESE ACETATE LLC
MARTINEZ, CA—2026-04-28
TESORO REFINING & MARKETING COMPANY LLC
More inspections in TX
WICHITA FALLS, TX—2026-07-16
UNITED RENTALS, INC.
SAN MARCOS, TX—2026-07-16
CASA MECHANICAL SERVICES, LTD.
CLARKSVILLE, TX—2026-07-15
SEQUOIAS TREE EXPERT LLC
EL PASO, TX—2026-07-15
SURE STEEL
CORPUS CHRISTI, TX—2026-07-15
NORTH STAR ENERGY SOLUTIONS LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 315723965.