SYRACUSE, NY ·
OSHA Inspection: 5ENERAL CHEMICAL LLC
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of 5ENERAL CHEMICAL LLC in 1421 WILLIS AVE, SYRACUSE, NY 13204 (NAICS 325188). OSHA activity number 315850149.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- 5ENERAL CHEMICAL LLC
- Site address
- 1421 WILLIS AVE
- City
- SYRACUSE
- State
- NY
- ZIP
- 13204
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325188
- SIC code (legacy)
- 2819
- Employees
- 29
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
8 citations on file for this inspection.
1910.23 C01
- Issued
- May 7, 2012
- Abate by
- May 20, 2012
- Penalty
- Initial $3,000 · Current $1,500 Reduced
General-duty citation text
29 CFR 1910.23(c)(1): Open sided floor(s) or platform(s) 4 feet or more above the adjacent floor or ground level were not guarded by standard railings (or the equivalent as specified in 29 CFR 1910.23(e)(3)(i) through (v)), on all open sides and ends: a)On or about 12/1/2011, Fluid Bed Dryer: A platform used to access the dryer was not provided with a completely decked platform or rail system, employees exposed to falls of six feet. Abatement certification must be submitted for this item.
Recent events (2)
- · I (S) $1500.00
- · Z (S) $3000.00
1910.119 D03 IB
- Issued
- May 7, 2012
- Abate by
- May 20, 2012
- Penalty
- Initial $5,000 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): Process safety information pertaining to the equipment in the process did not include accurate Piping and Instrument Diagrams (P&ID'S) and did not represent equipment that was existing and was part of the process: a)On or about 11/30/2011, Ammonia Unload Area: Valve A-V12WA noted on P&ID sheet 1 of 3 was not present on the system. b)On or about 11/30/11, Ammonia Unload Area: Valve A-V2 was chain locked open, which is not designated on to be chain locked on P&ID sheet 1 of 3. c)On or about 11/30/11, Ammonia Unload Area: A plugged 2 inch T located prior to the bulk storage tanks was removed, but was still present on P&ID sheet 1 of 3. Abatement certification must be submitted for this item.
Recent events (2)
- · I (S) $2500.00
- · Z (S) $5000.00
1910.119 D03 II
- Issued
- May 7, 2012
- Abate by
- May 20, 2012
General-duty citation text
29 CFR 1910.119(d)(3)(ii): The employer did not document that the equipment in the process complied with recognized and generally accepted good engineering practices: a)On or about 11/30/2011, Ammonia Unload Area: An Ammonia absorption water bucket was in use with a flexible discharge hose. The discharge hose was not weighted or secured near the bottom of the bucket to prevent displacement. There was no design specifications for the quantity of water needed to mitigate the potential hazard. Reference ANSI K61.1, Safety Requirements for the Storage and Handling of Anhydrous Ammonia, Section 4.4.1. b)On or about 11/30/11, North and South Trains: At the Vaporizers, Rupture Discs were in use in lieu of Pressure Relief Devices that would re seat themselves after opening. Reference ANSI K61.1, Safety Requirements for the Storage and Handling of Anhydrous Ammonia, Section 5.8.1. Abatement certification must be submitted for this item.
Recent events (2)
- · I (S)
- · Z (S)
1910.119 E03 I
- Issued
- May 7, 2012
- Abate by
- Nov 20, 2012
- Penalty
- Initial $5,000 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.119(e)(3)(i): The process hazard analysis did not address the hazards of the process: a)On or about 11/30/2011, Ammonia Unload Area: The Process Hazard Analysis did not address the failure of utilities such as the water supply to the fog nozzles protecting the Ammonia Bulk Storage Tanks. Abatement certification must be submitted for this item.
Recent events (2)
- · I (S) $2500.00
- · Z (S) $5000.00
1910.146 D03 VI
- Issued
- May 7, 2012
- Abate by
- May 20, 2012
- Penalty
- Initial $3,000 · Current $1,500 Reduced
General-duty citation text
29 CFR 1910.146(d)(3)(vi): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not develop and implement the means, procedures, and practices necessary for safe permit entry operations, including verifying that conditions in the permit space were acceptable for entry throughout the duration of an authorized entry: a)On or about 11/30/2011, Fluid Bed Dryer: During entry into the Fluid Bed Dryer, the employees did not lock out energy sources such as steam and compressed air. Abatement certification must be submitted for this item.
Recent events (2)
- · I (S) $1500.00
- · Z (S) $3000.00
1910.212 A01
- Issued
- May 7, 2012
- Abate by
- May 20, 2012
- Penalty
- Initial $3,000 · Current $1,500 Reduced
General-duty citation text
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by the point of operation, ingoing nip points, rotating parts, flying chips and sparks: a)On or about 12/1/2011, Warehouse: Employees were exposed to the unguarded bag clamp and pivoting bag holder on the bag filling machine. Abatement certification must be submitted for this item.
Recent events (2)
- · I (S) $1500.00
- · Z (S) $3000.00
1910.215 B09
- Issued
- May 7, 2012
- Abate by
- May 20, 2012
- Penalty
- Initial $4,000 · Current $2,000 Reduced
General-duty citation text
29 CFR 1910.215(b)(9): Guard for abrasive wheel machine where the operator stands in front of the machine was not constructed so that the peripheral protecting member could be adjusted to the constantly decreasing diameter of the wheel: a)On or about 12/1/2011, Maintenance Shop: A grinder was not provided with an adjustable tongue guard. Abatement certification must be submitted for this item.
Recent events (2)
- · I (S) $2000.00
- · Z (S) $4000.00
1910.303 G02 I
- Issued
- May 7, 2012
- Abate by
- May 20, 2012
- Penalty
- Initial $5,000 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.303(g)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by approved cabinets or other forms of approved enclosures, or other means listed under this provision: a)On or about 12/1/2011, Wet Side Control Room: A Relay had exposed energized parts and a two energized cable were exposed and energized. Abatement certification must be submitted for this item.
Recent events (2)
- · I (S) $2500.00
- · Z (S) $5000.00
More inspections at 5eneral Chemical LLC
View 5eneral Chemical LLC's full OSHA safety record →
More inspections in this industry (NAICS 325188)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 315850149.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.