CHESTER, MD —
OSHA Inspection: HAND MASTERS CONSTRUCTION INC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of HAND MASTERS CONSTRUCTION INC in LOT 123 GIBSON'S GRANT, CHESTER, MD 21619 (NAICS 238130). OSHA activity number 316416221.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HAND MASTERS CONSTRUCTION INC
- Site address
- LOT 123 GIBSON'S GRANT
- City
- CHESTER
- State
- MD
- ZIP
- 21619
- Mailing
- 3021 BLUFF POINT LANE, SILVER SPRING, MD 20906
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- SIC code (legacy)
- 1751
- Employees
- 6
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
9 citations on file for this inspection.
1926.502 B01
- Issued
- May 21, 2012
- Abate by
- May 29, 2012
- Penalty
- Initial $900 · Current $685 Reduced
Recent events (2)
- — I (S) $685.00
- — Z (S) $900.00
1926.502 D15
- Issued
- May 21, 2012
- Abate by
- May 29, 2012
- Penalty
- Initial $900 · Current $685 Reduced
Recent events (2)
- — I (S) $685.00
- — Z (S) $900.00
1926.1425 C03
- Issued
- May 21, 2012
- Abate by
- Jul 5, 2012
- Penalty
- Initial $900 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $900.00
1926.1428 A
- Issued
- May 21, 2012
- Abate by
- Jul 5, 2012
- Penalty
- Initial $900 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $900.00
50104 A
- Issued
- May 21, 2012
- Abate by
- May 29, 2012
- Penalty
- Initial $1,050 · Current $790 Reduced
General-duty citation text
Labor and Employment Article, Section 5-104(a): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees: (a)Date of Violation:03/27/12 Location:2nd Floor of House Condition:Employees were exposed to the hazard being crushed/struck by collapsing roof trusses due to inadequate bracing techniques. Among other methods, one feasible and acceptable method to correct this hazard is to install bracing in accordance with the Wood Truss Council of America recommendations per BCSI-B2. Abatement documentation (photographs, receipts, copies of programs, training certification, etc.) is required for this item.
Recent events (2)
- — I (S) $790.00
- — Z (S) $1050.00
09122605 A
- Issued
- May 21, 2012
- Abate by
- Jul 5, 2012
- Penalty
- Initial $900 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $900.00
09122608 B01
- Issued
- May 21, 2012
- Abate by
- Jul 5, 2012
- Penalty
- Initial $900 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $900.00
1926.503 B01
- Issued
- May 21, 2012
- Abate by
- May 29, 2012
Recent events (2)
- — I (O)
- — Z (O)
1926.1052 C01 I
- Issued
- May 21, 2012
- Abate by
- May 24, 2012
Recent events (2)
- — I (O)
- — Z (O)
More inspections at Hand Masters Construction INC
View Hand Masters Construction INC's full OSHA safety record →
More inspections in this industry (NAICS 238130)
More inspections in MD
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 316416221.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.