OSHA Inspection: CAROLINA PRECISION FIBERS, INC.

Accident-driven inspection · Health discipline

On , OSHA opened an accident-driven health inspection of CAROLINA PRECISION FIBERS, INC. in 145 FACTORY STREET, RONDA, NC 28670 (NAICS 322299). OSHA activity number 316472265.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Carolina Precision Fibers, INC. — free Get an email when a new federal OSHA severe-injury report for Carolina Precision Fibers, INC. is published. One employer, no account, unsubscribe in one click.
Site address
145 FACTORY STREET
City
RONDA
State
NC
ZIP
28670
Inspection type
Accident-driven (A)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
322299
SIC code (legacy)
2679
Employees
32
Ownership type
A
Industry flags
Manufacturing health.

19 citations on file for this inspection.

95012901

Serious 1 instance 32 exposed
Issued
Sep 17, 2012
Abate by
Sep 25, 2012
Penalty
Initial $2,800 · Current $2,800
North Carolina General Statute 95-129(1) of the Occupational Safety and
Health Act of North
Carolina:  The employer did not furnish employment and a place of
employment which were
free from recognized hazards that were causing or likely to cause death or
serious physical harm
to employees in that employees were exposed to fire from combustible dust
produced in the
mulch production process. The employer did not have sufficient equipment,
facilities and
procedures to prevent, suppress and prevent the spread of fires caused by
the combustion of
dust, including:
a)line #1 mulch production area - the mulch process equipment (material
handling,
dust collection system) did not contain explosion protection, such as but
not
limited to, deflagration venting, suppression systems, isolation devices,
and
pressure relief systems.
b)line #1 mulch production area - the mulch process area and building did
not
contain fire walls, fire partitions, and were not designed with
damage-limiting
construction including deflagration venting or explosion relief.
c)line #1 mulch production area - the employer did not develop an
inspection,
testing and maintenance program to control and minimize hazards associated
with
combustible dust , such as but not limited to: fire and explosion
protection and
prevention, material handling equipment, dust collection equipment,
housekeeping, potential ignition sources, electrical, process changes, and
lubrication of bearings.
NOTE: Among other methods, one feasible and acceptable method to abate
this hazard
is to comply with the National Fire Protection Agency (NFPA) 654,"Standard
for the
Prevention of Fire and Dust Explosions from the Manufacturing, Processing,
and
Handling of Combustible Particulate Solids, 2006 edition." including:
1.Install deflagration isolation system, pressure relief system, and/or
suppression
on the mulch production system (from the dust collector, piping, and
hopper).
2.Install pressure relief system so that deflagration venting is routed to
a safe
location.
3.Follow procedures in the Flamex Spark Detector System manual in regard to
inspection, testing, and maintenance of the spark detection suppression
system.
Recent events (2)
  • — F (S) $2800.00
  • — Z (S) $2800.00

1910.22 A01

Serious 1 instance 32 exposed
Issued
Sep 17, 2012
Abate by
Sep 25, 2012
Penalty
Initial $2,800 · Current $2,800
Recent events (2)
  • — F (S) $2800.00
  • — Z (S) $2800.00

1910.95 C01

Serious 2 instances 9 exposed
Issued
Sep 17, 2012
Abate by
Sep 25, 2012
Penalty
Initial $1,500 · Current $600 Reduced
Recent events (2)
  • — F (S) $600.00
  • — Z (S) $1500.00

1910.136 A

Serious 1 instance 6 exposed
Issued
Sep 17, 2012
Abate by
Sep 25, 2012
Penalty
Initial $1,500 · Current $1,000 Reduced
Recent events (2)
  • — F (S) $1000.00
  • — Z (S) $1500.00

1910.151 C

Serious 1 instance 4 exposed
Issued
Sep 17, 2012
Abate by
Sep 25, 2012
Penalty
Initial $900 · Current $500 Reduced
Recent events (2)
  • — F (S) $500.00
  • — Z (S) $900.00

1910.178 L06

Serious 1 instance 4 exposed
Issued
Sep 17, 2012
Abate by
Sep 20, 2012
Penalty
Initial $1,500 · Current $725 Reduced
Recent events (2)
  • — F (S) $725.00
  • — Z (S) $1500.00

1910.178 A06

Serious 2 instances 4 exposed
Issued
Sep 17, 2012
Abate by
Sep 20, 2012
Recent events (2)
  • — F (S)
  • — Z (S)

1910.30 A02

Serious 1 instance 4 exposed
Issued
Sep 17, 2012
Abate by
Sep 20, 2012
Recent events (2)
  • — F (S)
  • — Z (S)

1910.1200 H01

Serious 1 instance 26 exposed
Issued
Sep 17, 2012
Abate by
Sep 20, 2012
Penalty
Initial $1,500 · Current $1,500
Recent events (2)
  • — F (S) $1500.00
  • — Z (S) $1500.00

1910.1200 F05 I

Serious 1 instance 6 exposed
Issued
Sep 17, 2012
Abate by
Oct 11, 2012
Recent events (2)
  • — F (S)
  • — Z (S)

1910.23 C01

Other-than-serious 1 instance 4 exposed
Issued
Sep 17, 2012
Abate by
Sep 20, 2012
Recent events (2)
  • — F (O)
  • — Z (O)

1910.132 D02

Other-than-serious 1 instance 26 exposed
Issued
Sep 17, 2012
Abate by
Sep 25, 2012
Penalty
Initial $450 · Current $200 Reduced
Recent events (2)
  • — F (O) $200.00
  • — Z (O) $450.00

1910.134 C02 I

Other-than-serious 1 instance 6 exposed
Issued
Sep 17, 2012
Abate by
Sep 20, 2012
Penalty
Initial $450 · Current $200 Reduced
Recent events (2)
  • — F (O) $200.00
  • — Z (O) $450.00

1910.141 A03 I

Other-than-serious 1 instance 32 exposed
Issued
Sep 17, 2012
Abate by
Oct 11, 2012
Penalty
Initial $450 · Current $200 Reduced
Recent events (2)
  • — F (O) $200.00
  • — Z (O) $450.00

1910.141 D02 II

Other-than-serious 1 instance 32 exposed
Issued
Sep 17, 2012
Abate by
Oct 11, 2012
Recent events (2)
  • — F (O)
  • — Z (O)

1910.141 D02 III

Other-than-serious 1 instance 32 exposed
Issued
Sep 17, 2012
Abate by
Sep 20, 2012
Recent events (2)
  • — F (O)
  • — Z (O)

1910.141 D02 IV

Other-than-serious 1 instance 26 exposed
Issued
Sep 17, 2012
Abate by
Sep 20, 2012
Recent events (2)
  • — F (O)
  • — Z (O)

1910.157 E02

Other-than-serious 1 instance 32 exposed
Issued
Sep 17, 2012
Abate by
Sep 20, 2012
Penalty
Initial $450 · Current $200 Reduced
Recent events (2)
  • — F (O) $200.00
  • — Z (O) $450.00

1910.157 G01

Other-than-serious 1 instance 32 exposed
Issued
Sep 17, 2012
Abate by
Sep 20, 2012
Recent events (2)
  • — F (O)
  • — Z (O)

View Carolina Precision Fibers, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 316472265.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.