OSHA Inspection: J & D FRAMING INC

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of J & D FRAMING INC in NORTHERN LAKES LANE, LOTS 34 THRU 40, LAUREL, MD 20723 (NAICS 238130). OSHA activity number 316650233.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch J & D Framing INC — free Get an email when a new federal OSHA severe-injury report for J & D Framing INC is published. One employer, no account, unsubscribe in one click.
Establishment
J & D FRAMING INC
Site address
NORTHERN LAKES LANE, LOTS 34 THRU 40
City
LAUREL
State
MD
ZIP
20723
Mailing
7003 ESSEX AVENUE, SPRINGFIELD, VA 22150
Inspection type
Unprogrammed Related (G)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
SIC code (legacy)
1751
Employees
9
Ownership type
A
Industry flags
Construction safety.

11 citations on file for this inspection.

1926.20 B02

Serious Gravity 08 1 instance 9 exposed
Issued
Nov 2, 2012
Abate by
Dec 19, 2012
Penalty
Initial $1,000 · Current $425 Reduced
Recent events (2)
  • — I (S) $425.00
  • — Z (S) $1000.00

1926.21 B02

Serious Gravity 08 1 instance 9 exposed
Issued
Nov 2, 2012
Abate by
Dec 19, 2012
Penalty
Initial $1,000 · Current $425 Reduced
Recent events (2)
  • — I (S) $425.00
  • — Z (S) $1000.00

1926.25 A

Other-than-serious Gravity 03 1 instance 2 exposed
Issued
Nov 2, 2012
Abate by
Nov 7, 2012
Penalty
Initial $187 · Current $75 Reduced
Recent events (2)
  • — I (O) $75.00
  • — Z (S) $187.00

1926.501 B13

Serious Gravity 08 7 instances 9 exposed
Issued
Nov 2, 2012
Abate by
Nov 13, 2012
Penalty
Initial $1,000 · Current $425 Reduced
Recent events (2)
  • — I (S) $425.00
  • — Z (S) $1000.00

1926.502 I03

Serious Gravity 08 7 instances 9 exposed
Issued
Nov 2, 2012
Abate by
Nov 13, 2012
Penalty
Initial $1,000 · Current $425 Reduced
Recent events (2)
  • — I (S) $425.00
  • — Z (S) $1000.00

1926.503 A01

Serious Gravity 08 1 instance 9 exposed
Issued
Nov 2, 2012
Abate by
Dec 19, 2012
Penalty
Initial $1,000 · Current $425 Reduced
Recent events (2)
  • — I (S) $425.00
  • — Z (S) $1000.00

1926.602 C01 VI

Other-than-serious Gravity 07 1 instance 3 exposed
Issued
Nov 2, 2012
Abate by
Nov 13, 2012
Penalty
Initial $875 · Current $370 Reduced
Labor and Employment Article, Section 5-104(a): The employer did not
furnish employment and a place of
employment which were free from recognized hazards that were causing or
likely to cause death or serious
physical harm to employees:
(a)Date of Violation:08/24/12
Location:Northern Lakes Lane, Lot 34
Condition:Employees engaged in framing townhouses under construction were
not installing
temporary bracing on metal plate-connected wood trusses in accordance with
information contained in Building Component Safety Information BCSI 1-03,
Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety Information BCSI 1-03,
Wood Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
(b)Date of Violation:On or about 08/23/12
Location:Northern Lakes Lane, Lot 35
Condition:Employees engaged in framing townhouses under construction were
not installing
temporary bracing on metal plate-connected wood trusses in accordance with
information contained in Building Component Safety Information BCSI 1-03
Guide to
Good Practices for Handling, Installing & Bracing of Metal Plate Connected
Wood
Trusses, Wood Truss Council of America, the Truss Plate Institute, or the
truss
manufacturer.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety Information BCSI 1-03
Guide to Good Practices for Handling, Installing & Bracing of Metal Plate
Connected Wood Trusses, Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
(c)Date of Violation:08/24/12
Location:Northern Lakes Lane, Lot 36
Condition:Employees engaged in framing townhouses under construction were
not installing
temporary bracing on metal plate-connected wood trusses in accordance with
information contained in Building Component Safety Information BCSI 1-03
Guide to
Good Practices for Handling, Installing & Bracing of Metal Plate Connected
Wood
Trusses, Wood Truss Council of America, the Truss Plate Institute, or the
truss
manufacturer.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety Information BCSI 1-03,
Guide to Good Practices for Handling, Installing & Bracing of Metal Plate
Connected
Wood Trusses, Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
(d)Date of Violation:08/24/12
Location:Northern Lakes Lane, Lot 37
Condition:Employees engaged in framing townhouses under construction were
not installing
temporary bracing on metal plate-connected wood trusses in accordance with
information contained in Building Component Safety Information BCSI 1-03
Guide to
Good Practices for Handling, Installing & Bracing of Metal Plate Connected
Wood
Trusses, Wood Truss Council of America, the Truss Plate Institute, or the
truss
manufacturer.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety Information BCSI 1-03
Guide to Good Practices for Handling, Installing & Bracing of Metal Plate
Connected Wood Trusses, Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
(e)Date of Violation:On or About 08/23/12
Location:Northern Lakes Lane, Lot 38
Condition:Employees engaged in framing townhouses under construction were
not installing
temporary bracing on metal plate-connected wood trusses in accordance with
information contained in Building Component Safety Information BCSI 1-03
Guide to
Good Practices for Handling, Installing & Bracing of Metal Plate Connected
Wood
Trusses, Wood Truss Council of America, the Truss Plate Institute, or the
truss
manufacturer.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety Information BCSI 1-03
Guide to Good Practices for Handling, Installing & Bracing of Metal Plate
Connected Wood Trusses, Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
(f)Date of Violation:On or About 08/23/12
Location:Northern Lakes Lane, Lot 39
Condition:Employees engaged in framing townhouses under construction were
not installing
temporary bracing on metal plate-connected wood trusses in accordance with
information contained in Building Component Safety Information BCSI 1-03
Guide to
Good Practices for Handling, Installing & Bracing of Metal Plate Connected
Wood
Trusses, Wood Truss Council of America, the Truss Plate Institute, or the
truss
manufacturer.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety Information BCSI 1-03
Guide to Good Practices for Handling, Installing & Bracing of Metal Plate
Connected Wood Trusses, Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
(g)Date of Violation:On or About 08/23/12
Location:Northern Lakes Lane, Lot 39
Condition:Employees engaged in framing townhouses under construction were
not installing
temporary bracing on metal plate-connected wood trusses in accordance with
information contained in Building Component Safety Information BCSI 1-03
Guide to
Good Practices for Handling, Installing & Bracing of Metal Plate Connected
Wood
Trusses, Wood Truss Council of America, the Truss Plate Institute, or the
truss
manufacturer.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety Information BCSI 1-03
Guide to Good Practices for Handling, Installing & Bracing of Metal Plate
Connected Wood Trusses, Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
Abatement documentation (photographs, receipts, copies of programs,
training certification, etc.)
is required for this item.
Recent events (2)
  • — I (O) $370.00
  • — Z (S) $875.00

50104 A

Serious Gravity 08 5 instances 9 exposed
Issued
Nov 2, 2012
Abate by
Nov 13, 2012
Penalty
Initial $1,000 · Current $425 Reduced
Labor and Employment Article, Section 5-104(a): The employer did not
furnish employment and a place of
employment which were free from recognized hazards that were causing or
likely to cause death or serious
physical harm to employees:
(a)Date of Violation:08/24/12
Location:Northern Lakes Lane, Lot 34
Condition:Employees engaged in framing townhouses under construction were
not protected from
truss collapse by the installation of temporary bracing on metal
plate-connected wood
trusses.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety Information BCSI 1-03
Guide to Good Practices for Handling, Installing & Bracing of Metal Plate
Connected Wood Trusses, Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
(b)Date of Violation:On or About 08/23/12
Location:Northern Lakes Lane, Lot 35
Condition:Employees engaged in framing townhouses under construction were
not protected from
truss collapse by the installation of temporary bracing on metal
plate-connected wood
trusses.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety Information BCSI 1-03
Guide to Good Practices for Handling, Installing & Bracing of Metal Plate
Connected Wood Trusses, Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
(c)Date of Violation:08/24/12
Location:Northern Lakes Lane, Lot 36
Condition:Employees engaged in framing townhouses under construction were
not
protected from
truss collapse by the installation of temporary bracing on metal
plate-connected wood
trusses.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety Information BCSI 1-03,
Guide to Good Practices for Handling, Installing & Bracing of Metal Plate
Connected Wood Trusses, Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
(d)Date of Violation:08/24/12
Location:Northern Lakes Lane, Lot 37
Condition:Employees engaged in framing townhouses under construction were
not protected from
truss collapse by the installation of temporary bracing on metal
plate-connected wood
trusses.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety Information BCSI 1-03
Guide to Good Practices for Handling, Installing & Bracing of Metal Plate
Connected Wood Trusses, Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
(e)Date of Violation:On or About 08/23/12
Location:Northern Lakes Lane, Lot 38
Condition:Employees engaged in framing townhouses under construction were
not protected from
truss collapse by the installation of temporary bracing on metal
plate-connected wood
trusses.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety
Information BCSI 1-03
Guide to Good Practices for Handling, Installing & Bracing of Metal Plate
Connected Wood Trusses, Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
(f)Date of Violation:On or About 08/23/12
Location:Northern Lakes Lane, Lot 39
Condition:Employees engaged in framing townhouses under construction were
not protected from
truss collapse by the installation of temporary bracing on metal
plate-connected wood
trusses.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety Information BCSI 1-03
Guide to Good Practices for Handling, Installing & Bracing of Metal Plate
Connected Wood Trusses, Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
(g)Date of Violation:On or About 08/23/12
Location:Northern Lakes Lane, Lot 39
Condition:Employees engaged in framing townhouses under construction were
not protected from
truss collapse by the installation of temporary bracing on metal
plate-connected wood
trusses.
Among other methods, one feasible and acceptable means of abatement is to
install temporary bracing on all
metal plate-connected wood trusses in accordance with Building Component
Safety Information BCSI 1-03
Guide to Good Practices for Handling, Installing & Bracing of Metal Plate
Connected Wood Trusses, Wood
Truss Council of America, the Truss Plate Institute, or the truss
manufacturer.
Abatement documentation (photographs, receipts, copies of programs,
training certification, etc.)
is required for this item.
Recent events (2)
  • — I (S) $425.00
  • — Z (S) $1000.00

1926.502 I04

Other-than-serious Gravity 04 7 instances 9 exposed
Issued
Nov 2, 2012
Abate by
Nov 13, 2012
Penalty
Initial $500 · Current $210 Reduced
Recent events (2)
  • — I (O) $210.00
  • — Z (O) $500.00

1926.503 B01

Other-than-serious Gravity 02 1 instance 9 exposed
Issued
Nov 2, 2012
Abate by
Dec 19, 2012
Penalty
Initial $250 · Current $100 Reduced
Recent events (2)
  • — I (O) $100.00
  • — Z (O) $250.00

1926.1051 A

Other-than-serious Gravity 04 7 instances 9 exposed
Issued
Nov 2, 2012
Abate by
Nov 2, 2012
Penalty
Initial $500 · Current $210 Reduced
Recent events (2)
  • — I (O) $210.00
  • — Z (O) $500.00

View J & D Framing INC's full OSHA safety record →