OSHA Inspection: D&B CARPENTRY CONTRACTORS INC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of D&B CARPENTRY CONTRACTORS INC in SUSANS PASS & SINGER WAY, ELKRIDGE, MD 21075 (NAICS 238130). OSHA activity number 317031128.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch D&B Carpentry Contractors INC — free Get an email when a new federal OSHA severe-injury report for D&B Carpentry Contractors INC is published. One employer, no account, unsubscribe in one click.
Site address
SUSANS PASS & SINGER WAY
City
ELKRIDGE
State
MD
ZIP
21075
Mailing
4490 BAUGHMAN MILL ROAD, MANCHESTER, MD 21102
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
SIC code (legacy)
1751
Employees
1
Ownership type
A
Industry flags
Construction safety.

7 citations on file for this inspection.

1926.25 A

Serious Gravity 04 6 instances 1 exposed
Issued
Jun 26, 2013
Abate by
Jul 5, 2013
Penalty
Initial $700 · Current $420 Reduced
Recent events (2)
  • — I (S) $420.00
  • — Z (S) $700.00

1926.501 B13

Serious Gravity 07 6 instances 1 exposed
Issued
Jun 26, 2013
Abate by
Jul 1, 2013
Penalty
Initial $612 · Current $365 Reduced
Recent events (2)
  • — I (S) $365.00
  • — Z (S) $612.00

1926.502 I03

Serious Gravity 06 12 instances 1 exposed
Issued
Jun 26, 2013
Abate by
Jul 1, 2013
Penalty
Initial $525 · Current $315 Reduced
Recent events (2)
  • — I (S) $315.00
  • — Z (S) $525.00

1926.1051 A

Serious Gravity 07 2 instances 1 exposed
Issued
Jun 26, 2013
Abate by
Jul 1, 2013
Penalty
Initial $612 · Current $365 Reduced
Recent events (2)
  • — I (S) $365.00
  • — Z (S) $612.00

50104 A

Serious Gravity 07 6 instances 1 exposed
Issued
Jun 26, 2013
Abate by
Jul 5, 2013
Penalty
Initial $1,225 · Current $735 Reduced
Labor and Employment Article, Section 5-104(a): The employer did not
furnish
employment and a place of
employment which were free from recognized hazards that were causing or
likely to cause death or serious
physical harm to employees:
(a)Date of Violation:On or About 05/06/13
Location:Singers Way, Lot #123-A
Condition:Metal plate connected wood trusses were not braced with adequate
temporary bracing
during installation to protect employees from being struck/crushed by
collapsing roof
trusses.
Among other methods, one feasible and acceptable method to correct this
hazard is to install temporary
bracing on metal plate connected wood trusses in accordance with the
manufacturer's recommendations, or
Building Components Safety Information Bulletin BCSI 1-03 Guide To Good
Practice for Handling, Installing,
and Bracing of Metal Plate Connected Wood Trusses.
(b)Date of Violation:On or About 05/06/13
Location:Singers Way, Lot #123-B
Condition:Metal plate connected wood trusses were not braced with adequate
temporary bracing
during installation to protect employees from being struck/crushed by
collapsing roof
trusses.
Among other methods, one feasible and acceptable method to correct this
hazard is to install temporary
bracing on metal plate connected wood trusses in accordance with the
manufacturer's recommendations, or
Building Components Safety Information Bulletin BCSI 1-03 Guide To Good
Practice for Handling, Installing,
and Bracing of Metal Plate Connected Wood Trusses.
(c)Date of Violation:05/06/13
Location:Singers Way, Lot #123-C
Condition:Metal plate connected wood trusses were not braced with adequate
temporary bracing
during installation to protect employees from being struck/crushed by
collapsing roof
trusses.
Among other methods, one feasible and acceptable method to correct this
hazard is to install temporary
bracing on metal plate connected wood trusses in accordance with the
manufacturer's recommendations, or
Building Components Safety Information Bulletin BCSI 1-03 Guide To Good
Practice for Handling, Installing,
and Bracing of Metal Plate Connected Wood Trusses.
(d)Date of Violation:05/06/13
Location:Singers Way, Lot #123-D
Condition:Metal plate connected wood trusses were not braced with adequate
temporary bracing
during installation to protect employees from being struck/crushed by
collapsing roof
trusses.
Among other methods, one feasible and acceptable method to correct this
hazard
is to install temporary
bracing on metal plate connected wood trusses in accordance with the
manufacturer's recommendations, or
Building Components Safety Information Bulletin BCSI 1-03 Guide To Good
Practice for Handling, Installing,
and Bracing of Metal Plate Connected Wood Trusses.
(e)Date of Violation:05/06/13
Location:Singers Way, Lot #123-E
Condition:Metal plate connected wood trusses were not braced with adequate
temporary bracing
during installation to protect employees from being struck/crushed by
collapsing roof
trusses.
Among other methods, one feasible and acceptable method to correct this
hazard is to install temporary
bracing on metal plate connected wood trusses in accordance with the
manufacturer's recommendations, or
Building Components Safety Information Bulletin BCSI 1-03 Guide To Good
Practice
for Handling, Installing,
and Bracing of Metal Plate Connected Wood Trusses.
(f)Date of Violation:On or About 05/06/13
Location:Singers Way, Lot #123-F
Condition:Metal plate connected wood trusses were not braced with adequate
temporary bracing
during installation to protect employees from being struck/crushed by
collapsing roof
trusses.
Among other methods, one feasible and acceptable method to correct this
hazard is to install temporary
bracing on metal plate connected wood trusses in accordance with the
manufacturer's recommendations, or
Building Components Safety Information Bulletin BCSI 1-03 Guide To Good
Practice for Handling, Installing,
and Bracing of Metal Plate Connected Wood Trusses.
Abatement documentation (photographs, receipts, copies of programs,
training certification, etc.)
is required for this item.
Recent events (2)
  • — I (S) $735.00
  • — Z (S) $1225.00

1926.502 I04

Other-than-serious Gravity 02 12 instances 1 exposed
Issued
Jun 26, 2013
Abate by
Jul 1, 2013
Recent events (2)
  • — I (O)
  • — Z (O)

1926.503 B01

Other-than-serious Gravity 01 1 instance 1 exposed
Issued
Jun 26, 2013
Abate by
Jul 29, 2013
Recent events (2)
  • — I (O)
  • — Z (O)

View D&B Carpentry Contractors INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 317031128.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.