ELKRIDGE, MD ·
OSHA Inspection: GARCIA TELLO CARPENTRY LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of GARCIA TELLO CARPENTRY LLC in 7144 SUSANS PASS, ELKRIDGE, MD 21075 (NAICS 238130). OSHA activity number 317031151.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- GARCIA TELLO CARPENTRY LLC
- Site address
- 7144 SUSANS PASS
- City
- ELKRIDGE
- State
- MD
- ZIP
- 21075
- Mailing
- 7315 OLIVER STREET, LANHAM, MD 20706
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (N)
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- SIC code (legacy)
- 1751
- Employees
- 4
- Ownership type
- Private (A)
- Industry flags
- Construction safety.
Citations
21 citations on file for this inspection.
1926.20 B02
- Issued
- Jun 27, 2013
- Abate by
- Jul 30, 2013
- Penalty
- Initial $1,000 · Current $1,000
1926.21 B02
- Issued
- Jun 27, 2013
- Abate by
- Jul 30, 2013
- Penalty
- Initial $1,000 · Current $1,000
1926.25 A
- Issued
- Jun 27, 2013
- Abate by
- Jul 5, 2013
- Penalty
- Initial $500 · Current $500
1926.501 B13
- Issued
- Jun 27, 2013
- Abate by
- Jul 5, 2013
- Penalty
- Initial $1,000 · Current $1,000
1926.502 D15
- Issued
- Jun 27, 2013
- Abate by
- Jul 5, 2013
- Penalty
- Initial $875 · Current $875
1926.502 D16 III
- Issued
- Jun 27, 2013
- Abate by
- Jul 5, 2013
1926.502 I03
- Issued
- Jun 27, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $437 · Current $437
1926.503 A02 VIII
- Issued
- Jun 27, 2013
- Abate by
- Jul 30, 2013
- Penalty
- Initial $1,000 · Current $1,000
1926.1051 A
- Issued
- Jun 27, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $187 · Current $187
1926.1053 B05 I
- Issued
- Jun 27, 2013
- Abate by
- Jul 2, 2013
50104 A
- Issued
- Jun 27, 2013
- Abate by
- Jul 5, 2013
- Penalty
- Initial $1,000 · Current $1,000
General-duty citation text
Labor and Employment Article, Section 5-104(a): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees: (a)Date of Violation:On or About 05/06/13 Location:Singers Way, Lot #123-A Condition:Metal plate connected wood trusses were not braced with adequate temporary bracing during installation to protect employees from being struck/crushed by collapsing roof trusses. Among other methods, one feasible and acceptable method to correct this hazard is to install temporary bracing on metal plate connected wood trusses in accordance with the manufacturer's recommendations, or Building Components Safety Information Bulletin BCSI 1-03 Guide To Good Practice for Handling, Installing, and Bracing of Metal Plate Connected Wood Trusses. (b)Date of Violation:On or About 05/06/13 Location:Singers Way, Lot #123-B Condition:Metal plate connected wood trusses were not braced with adequate temporary bracing during installation to protect employees from being struck/crushed by collapsing roof trusses. Among other methods, one feasible and acceptable method to correct this hazard is to install temporary bracing on metal plate connected wood trusses in accordance with the manufacturer's recommendations, or Building Components Safety Information Bulletin BCSI 1-03 Guide To Good Practice for Handling, Installing, and Bracing of Metal Plate Connected Wood Trusses. (c)Date of Violation:05/06/13 Location:Singers Way, Lot #123-C Condition:Metal plate connected wood trusses were not braced with adequate temporary bracing during installation to protect employees from being struck/crushed by collapsing roof trusses. Among other methods, one feasible and acceptable method to correct this hazard is to install temporary bracing on metal plate connected wood trusses in accordance with the manufacturer's recommendations, or Building Components Safety Information Bulletin BCSI 1-03 Guide To Good Practice for Handling, Installing, and Bracing of Metal Plate Connected Wood Trusses. (d)Date of Violation:05/06/13 Location:Singers Way, Lot #123-D Condition:Metal plate connected wood trusses were not braced with adequate temporary bracing during installation to protect employees from being struck/crushed by collapsing roof trusses. Among other methods, one feasible and acceptable method to correct this hazard is to install temporary bracing on metal plate connected wood trusses in accordance with the manufacturer's recommendations, or Building Components Safety Information Bulletin BCSI 1-03 Guide To Good Practice for Handling, Installing, and Bracing of Metal Plate Connected Wood Trusses. (e)Date of Violation:05/06/13 Location:Singers Way, Lot #123-E Condition:Metal plate connected wood trusses were not braced with adequate temporary bracing during installation to protect employees from being struck/crushed by collapsing roof trusses. Among other methods, one feasible and acceptable method to correct this hazard is to install temporary bracing on metal plate connected wood trusses in accordance with the manufacturer's recommendations, or Building Components Safety Information Bulletin BCSI 1-03 Guide To Good Practice for Handling, Installing, and Bracing of Metal Plate Connected Wood Trusses. (f)Date of Violation:On or About 05/06/13 Location:Singers Way, Lot #123-F Condition:Metal plate connected wood trusses were not braced with adequate temporary bracing during installation to protect employees from being struck/crushed by collapsing roof trusses. Among other methods, one feasible and acceptable method to correct this hazard is to install temporary bracing on metal plate connected wood trusses in accordance with the manufacturer's recommendations, or Building Components Safety Information Bulletin BCSI 1-03 Guide To Good Practice for Handling, Installing, and Bracing of Metal Plate Connected Wood Trusses. Abatement documentation (photographs, receipts, copies of programs, training certification, etc.) is required for this item.
1910.1200 E01
- Issued
- Jun 27, 2013
- Abate by
- Jul 30, 2013
- Penalty
- Initial $625 · Current $625
1910.1200 G01
- Issued
- Jun 27, 2013
- Abate by
- Jul 5, 2013
1910.1200 H01
- Issued
- Jun 27, 2013
- Abate by
- Jul 30, 2013
1926.152 A01
- Issued
- Jun 27, 2013
- Abate by
- Jul 5, 2013
- Penalty
- Initial $500 · Current $500
1926.502 I04
- Issued
- Jun 27, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $187 · Current $187
1926.503 B01
- Issued
- Jun 27, 2013
- Abate by
- Jul 30, 2013
- Penalty
- Initial $125 · Current $125
1926.1053 B01
- Issued
- Jun 27, 2013
- Abate by
- Jul 5, 2013
- Penalty
- Initial $375 · Current $375
1926.1053 B13
- Issued
- Jun 27, 2013
- Abate by
- Jul 5, 2013
1926.1060 A
- Issued
- Jun 27, 2013
- Abate by
- Jul 30, 2013
50406 A01
- Issued
- Jun 27, 2013
- Abate by
- Jul 16, 2013
- Penalty
- Initial $150 · Current $150
More inspections in this industry (NAICS 238130)
More inspections in MD
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 317031151.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.