OSHA Inspection: STIMSON LUMBER COMPANY

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of STIMSON LUMBER COMPANY in 1040 MILWAUKEE DRIVE, SAINT MARIES, ID 83861 (NAICS 321113). OSHA activity number 330017195.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Stimson Lumber Company — free Get an email when a new federal OSHA severe-injury report for Stimson Lumber Company is published. One employer, no account, unsubscribe in one click.
Site address
1040 MILWAUKEE DRIVE
City
SAINT MARIES
State
ID
ZIP
83861
Mailing
1040 MILWAUKEE DRIVE, SAINT MARIES, ID 83861
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
321113
Employees
63
Ownership type
A

8 citations on file for this inspection.

1910.22 A01

Serious Gravity 5 1 exposed
Issued
May 18, 2011
Abate by
Jun 8, 2011
Penalty
Initial $4,590 · Current $2,295 Reduced
29 CFR 1910.22(a)(1): All places of employment, passageways, storerooms or service rooms were not kept clean and orderly or in a sanitary condition:     a) Planer Area: On or about March 9, 2011 and times prior thereto the housekeeping schedule/program was not sufficient or implemented in a manner to prevent residual wood dust from accumulating on a Dayton oil fired heater (125,000 BTU) being used in this area.      b) Resaw Area: On or about March 9, 2011 and times prior thereto the housekeeping schedule/program was not sufficient or implemented in a manner to minimize or prevent residual Class II wood dust from accumulating in various locations and on various surfaces including but not limited to the resaw floor, walkway railings, stored cylinders, inside a flammable cabinet, and high ledges.      c) Electrical area outside of filing room: On or about March 9, 2011 and times prior thereto the housekeeping schedule/program was not sufficient or implemented in a manner to minimize or prevent wood dust build-up on ledges, and properly remove piles of wood dust from the floor.      d) Outside fuel storage area:  On or about March 9, 2011 and times prior thereto the housekeeping schedule/program was not sufficient or implemented in a manner to minimize wood dust and debris from building up on and around a serviceable 500 gallon gas dispensing tank.         Note) Abatement certification is required for this item.
Recent events (2)
  • — I (S) $2295
  • — Z (S) $4590

1910.253 B04 III

Serious Gravity 5 1 exposed
Issued
May 18, 2011
Penalty
Initial $0 · Current $0
29 CFR 1910.253(b)(4)(iii): Oxygen cylinders in storage were not separated from fuel-gas cylinders or combustible materials, by a minimum distance of 20 feet (6.1 m) or by a noncombustible barrier at least 5 feet (1.5 m) high having a fire-resistance rating of at least one-half hour:       a) Resaw Area: On or about March 9, 2011 and times prior thereto one oxygen cylinder was stored adjacent to two acetylene cylinders without noncombustible barriers in- between them.      Note) Abatement certification is not required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 A02 I

Other-than-serious 1 exposed
Issued
May 18, 2011
Penalty
Initial $2,295 · Current $1,148 Reduced
29 CFR 1910.305(a)(2)(i): The employer utilized temporary wiring for a permanent installation, and the equipment was not exempted equipment as specifically noted in 29 CFR 1910.305(a)(2)(i)(A), (B), or (C):     a) Drop sorter area: On or about March 9, 2011, and times prior thereto, the employer utilized a three prong extension cord in lieu of permanent wiring to provide power for a clamp light that was used as a heat lamp.         Note) Abatement certification is not required for this item.
Recent events (2)
  • — I (O) $1148
  • — Z (S) $2295

1910.305 A02 IX

Other-than-serious 1 exposed
Issued
May 18, 2011
Penalty
Initial $0 · Current $0
29 CFR 1910.305(a)(2)(ix): All lamps for general illumination were not protected from accidental contact or breakage by a suitable fixture or lamp holder with a guard. Brass shell, paper-lined sockets, or other metal-cased sockets were used with an ungrounded shell:       a) Drop sorter area: On or about March 9, 2011, and times prior thereto the employer used a clamp light with an ungrounded shell as a heat lamp.  The two pronged light plug was plugged into a three pronged extension cord.        Note) Abatement certification is not required for this item.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1904.33 A

Other-than-serious 1 exposed
Issued
May 18, 2011
Penalty
Initial $0 · Current $0
29 CFR 1904.33(a): The OSHA 300 Log, the OSHA 300A Summary, and/or the OSHA 301 Incident Reports were not retained in the establishment for 5 years following the end of the calendar year to which they relate:    a) Stimson Lumber Company had not maintained the certified OSHA 300A Annual Summary of Injuries and Illnesses for 2008.     b) Stimson Lumber Company had not maintained the certified OSHA 300A Annual Summary of Injuries and Illnesses for 2009.     Abatement certification is not required for this item.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.147 C06 I

Other-than-serious 1 exposed
Issued
May 18, 2011
Abate by
Jun 9, 2011
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed:    a) Facility: On or about March 9, 2011, the employer had not conducted a periodic inspection or audit of their energy control program since July 2009.    Note) Abatement certification is required for this item.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.178 L01 I

Other-than-serious 1 exposed
Issued
May 18, 2011
Abate by
Jun 9, 2011
Penalty
Initial $0 · Current $0
29 CFR 1910.178(l)(1)(i): The employer did not ensure that each powered industrial truck operator is competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l):    a) Facility: On or about March 9, 2011, and times prior to operators of Hyster and Gehl powered industrial trucks had not received written and practical training required by 29 CFR 1910.178.    Note) Abatement certification is required for this item.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.265 C06 I

Other-than-serious 1 exposed
Issued
May 18, 2011
Abate by
Jun 9, 2011
Penalty
Initial $0 · Current $0
29 CFR 1910.265(c)(6)(i): Emergency exit doors did not swing in the direction of exit travel:    a) Filing room: On or about March 9, and time prior thereto, employees worked in an area where an exit door opened into the room.        Note) Abatement certification is required for this item.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Stimson Lumber Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 330017195.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.