OSHA Inspection: AAROH CONSTRUCTION INC

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of AAROH CONSTRUCTION INC in 65 NORTH BROADWAY, DENVER, CO 80203 (NAICS 236220). OSHA activity number 330921982.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Aaroh Construction INC for free Get an email when a new federal OSHA severe-injury report for Aaroh Construction INC is published. One employer, no account, unsubscribe in one click.
Site address
65 NORTH BROADWAY
City
DENVER
State
CO
ZIP
80203
Mailing
13239 LOST LAKE WAY, BROOMFIELD, CO 80020
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
2
Ownership type
Private (A)

16 citations on file for this inspection.

1926.1101 E01

Serious Gravity 10 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $4,200 · Current $2,100 Reduced
29 CFR 1926.1101(e)(1):  All Class I, II, and III asbestos work was not conducted within regulated areas:\r\n(a)  Aaroh Construction Inc at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, employees performed demolition work of the interior structure of the facility.  Demolition activities included, but were not limited to, removal of thermal system insulation and textured surfacing material.  Employees used hammers, grinders, and prybars to perform demolition work.  These demolition activities are Class I and Class II work.  Bulk analysis determined that these materials contained up to 75% asbestos.  The employer did not ensure these activities were conducted within a regulated area.  This condition exposed employees to an asbestos hazard.\r\nAbatement Note:  Regulated areas shall comply with the requirements of paragraphs (2), (3), (4) and (5) of 29 CFR 1926.1101.\r\nAbatement Note:  Abatement certification and documentation are required for this item (see enclosed \u001CCertification of Corrective Action Worksheet\u001D).
Recent events (2)
  • · I (S) $2100
  • · Z (S) $4200

1926.1101 G01 I

Serious Gravity 10 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $0 · Current $0
29 CFR 1926.1101(g)(1)(i):  The employer did not use engineering controls and work practices in all operations covered by 29 CFR 1926.1101, regardless of the levels of exposure, in the form of vacuum cleaners equipped with high efficiency particulate air (HEPA) filters to collect all debris and dust containing asbestos containing material (ACM) and presumed asbestos containing material (PACM):\r\n(a)  Aaroh Construction Inc at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, the employer did not use a vacuum cleaner equipped with high efficiency particulate air (HEPA) filters to collect all debris and dust containing asbestos containing material and presumed asbestos containing material.  This condition exposed employees to an asbestos hazard.\r\nAbatement Note:  Abatement certification and documentation are required for this item (see enclosed \u001CCertification of Corrective Action Worksheet\u001D).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1101 G01 II

Serious Gravity 10 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $0 · Current $0
29 CFR 1926.1101(g)(1)(ii):  The employer did not use engineering controls and work practices in all operations covered by 29 CFR 1926.1101, regardless of the levels of exposure, in the form of wet methods or wetting agents to control employee exposures during asbestos handling, mixing, removal, cutting, application and cleanup:\r\n(a)  Aaroh Construction Inc at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, the employer did not use wet methods or wetting agents to control employee exposures during demolition and debris removal activities.  This condition exposed employees to an asbestos hazard.\r\nAbatement Note:  Abatement certification and documentation are required for this item (see enclosed \u001CCertification of Corrective Action Worksheet\u001D).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1101 G01 III

Serious Gravity 10 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $0 · Current $0
29 CFR 1926.1101(g)(1)(iii):  The employer did not use work practices in all operations covered by 29 CFR 1926.1101, regardless of the levels of exposure, in the form of prompt clean-up and disposal of wastes and debris contaminated with asbestos, in leak-tight containers:\r\n(a)  Aaroh Construction Inc at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, the employer did not use leak-tight containers for prompt clean-up and disposal of wastes and debris contaminated with asbestos.  Demolition debris was disposed of in dumpsters.  This condition exposed employees to an asbestos hazard.\r\nAbatement Note:  Abatement certification and documentation are required for this item (see enclosed \u001CCertification of Corrective Action Worksheet\u001D).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1101 G03 III

Serious Gravity 10 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $0 · Current $0
29 CFR 1926.1101(g)(3)(iii):  Dust and debris containing asbestos containing material (ACM) and presumed asbestos containing material (PACM) were dry swept, shoveled or removed by other dry clean-up methods which are prohibited work practices:\r\n(a)  Aaroh Construction Inc at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, the employer permitted ACM and PACM to be dry swept and shoveled into wheelbarrows for disposal.  This condition exposed employees to an asbestos hazard.\r\nAbatement Note:  Abatement certification and documentation are required for this item (see enclosed \u001CCertification of Corrective Action Worksheet\u001D).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1101 G04

Serious Gravity 10 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $0 · Current $0
29 CFR 1926.1101(g)(4):  Additional engineering controls and work practices and procedures were not used for Class I work as required by 29 CFR 1926.1101(g)(4)(i) through (g)(4)(vi):\r\n(a)  Aaroh Construction Inc at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, the employer did not follow the specific control methods required for Class I work which includes:\r\n(1)  Supervision by a competent person as defined in paragraph (b) of 29 CFR 1926.1101;\r\n(2)  Use of a barrier or isolation method to prevent migration of airborne asbestos from the regulated area;\r\n(3)  Isolation of the HVAC system within the regulated area;\r\n(4)  Placing impermeable dropcloths on surfaces beneath all removal activity;\r\n(5)  Covering all objects within the regulated area with an impermeable dropcloth or plastic sheeting; and,\r\n(6)  Ventilating the regulated area to move contaminated air away from the breathing zone of employees to a HEPA filtration or collection device.\r\nThis condition exposed employees to an asbestos hazard.\r\nAbatement Note:  Abatement certification and documentation are required for this item (see enclosed \u001CCertification of Corrective Action Worksheet\u001D).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1101 F01 I

Serious Gravity 10 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $4,200 · Current $2,100 Reduced
29 CFR 1926.1101(f)(1)(i):  Each employer who has a workplace or work operation where exposure monitoring is required under this section did not perform monitoring to determine accurately the airborne concentrations of asbestos to which employees may have been exposed:\r\n(a)  Aaroh Construction Inc at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, employees performed demolition work of the interior structure of the facility.  The employer did not perform exposure monitoring, which includes initial and periodic monitoring, to determine the concentration of airborne asbestos to which employees were exposed.  Bulk analysis determined that these materials contained up to 75% asbestos.  This condition exposed employees to an asbestos hazard.\r\nAbatement Note:  Abatement certification and documentation are required for this item (see enclosed \u001CCertification of Corrective Action Worksheet\u001D).
Recent events (2)
  • · I (S) $2100
  • · Z (S) $4200

1926.1101 H02 I

Serious Gravity 10 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $4,200 · Current $2,000 Reduced
29 CFR 1926.1101(h)(2)(i):  The employer did not implement a respiratory protection program in accordance with 29 CFR 1910.134(b) through (d) (except (d)(1)(iii)), and (f) through (m) which covers each employee required by 29 CFR 1926.1101 to use a respirator:\r\n(a)  Aaroh Construction Inc at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, the employer did not implement a written respiratory protection program for employees required to wear respirators while performing Class I and Class II asbestos work.  This condition exposed employees to respiratory hazards associated with asbestos.\r\nAbatement Note:  The written respiratory protection program must be in accordance with the General Industry standard for Respiratory Protection, 29 CFR 1910.134.  The following sections of the standard must be followed:\r\n(1)  Definitions;\r\n(2)  Written Respiratory Protection Program;\r\n(3)  Selection of Respirators;\r\n(4)  Fit Testing;\r\n(5)  Use of Respirators;\r\n(6)  Maintenance and Care of Respirators;\r\n(7)  Breathing Air Quality and Use;\r\n(8)  Identification of Filters, Cartridges, and Canisters;\r\n(9)  Training and Information;\r\n(10)  Program Evaluation; and,\r\n(11)  Recordkeeping.\r\nAbatement Note:  Abatement certification and documentation are required for this item (see enclosed \u001CCertification of Corrective Action Worksheet\u001D).
Recent events (2)
  • · I (S) $2000
  • · Z (S) $4200

1926.1101 H03 III A

Serious Gravity 10 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $0 · Current $0
29 CFR 1926.1101(h)(3)(iii)(A):  The employer did not provide a half-mask air-purifying respirator, other than a disposable respirator, equipped with high-efficiency filters, whenever the employee(s) performed Class II and III asbestos jobs where no negative exposure assessment was available:\r\n(a)  Aaroh Construction Inc at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, employees were given dust masks while performing Class II asbestos work.  The employer did not provide a half-mask air-purifying respirator equipped with a high-efficiency filter.  This condition exposed employees to respiratory hazards associated with asbestos.\r\nAbatement Note:  Abatement certification and documentation are required for this item (see enclosed \u001CCertification of Corrective Action Worksheet\u001D).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1101 H03 IV A

Serious Gravity 10 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $0 · Current $0
29 CFR 1926.1101(h)(3)(iv)(A):  The employer did not provide employees with a tight-fitting powered air-purifying respirator operated in the pressure-demand mode and equipped with either HEPA egress cartridges or an auxiliary positive-pressure self-contained breathing apparatus, whenever the employees were in regulated area performing Class I asbestos work for which a negative exposure assessment was not available:  (a)  Aaroh Construction Inc at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, the employer did not provide employees with a tight-fitting powered air-purifying respirator or self-contained breathing apparatus while performing Class I work.  This condition exposed employees to respiratory hazards associated with asbestos.  Abatement Note:  Abatement certification and documentation are required for this item (see enclosed Certification of Corrective Action Worksheet).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1101 I01

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $3,000 · Current $1,500 Reduced
29 CFR 1926.1101(i)(1):  The employer did not provide and require the use of protective clothing, such as coveralls or similar whole-body clothing, head coverings, gloves, and foot coverings when a required negative exposure assessment was not produced:  (a)  Aaroh Construction Inc at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, the employer did not provide employees with protective work clothing while performing Class I asbestos work.  Employees removed greater than 25 linear or 10 square feet of TSI or surfacing ACM and PACM.  This condition exposed employees to an asbestos hazard.  Abatement Note:  Abatement certification is required for this item (see enclosed Certification of Corrective Action Worksheet).
Recent events (2)
  • · I (S) $1500
  • · Z (S) $3000

1926.1101 J01 I

Serious Gravity 5 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $0 · Current $0
29 CFR 1926.1101(j)(1)(i):  The employer did not establish a decontamination area, consisting of an equipment room, shower area, and clean room in series, adjacent and connected to the regulated area:  (a)  Aaroh Construction Inc at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, the employer did not establish a decontamination area for employees conducting Class I asbestos work.  Employees removed greater than 25 linear or 10 square feet of TSI or surfacing ACM and PACM.  This condition exposed employees to an asbestos hazard.  Abatement Note:  Abatement certification is required for this item (see enclosed Certification of Corrective Action Worksheet).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1101 K03 I

Serious Gravity 5 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $3,000 · Current $1,500 Reduced
29 CFR 1926.1101(k)(3)(i):  Before work in areas containing ACM and PACM was begun, the employer did not identify the presence, location, and quantity of ACM, and/or PACM therein pursuant to paragraph (k)(1) of 29 CFR 1926.1101:  (a)  Aaroh Construction at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, the employer did not determine the presence, location, and quantity of ACM and PACM building materials such as, but not limited to, insulation and surface texturing, prior to the start of work.  This condition exposed employees to an asbestos hazard.  Abatement Note:  Abatement certification is required for this item (see enclosed Certification of Corrective Action Worksheet).
Recent events (2)
  • · I (S) $1500
  • · Z (S) $3000

1926.1101 K03 II B

Serious Gravity 5 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $0 · Current $0
29 CFR 1926.1101(k)(3)(ii)(B):  Before work under this standard was performed, the employer of employees who will perform such work did not inform employees and did not inform employers of employees who worked and/or were working in adjacent areas of the location and quantity of asbestos containing material (ACM) and/or presumed asbestos containing material (PACM) present in the area and the precautions to be taken to insure that airborne asbestos is confined to the area:    (a)  Aaroh Construction Inc at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, before work under this standard was performed, the employer did not inform employees and employers of employees of the presence, location, and quantity of ACM and/or PACM in the facility.  This condition exposed employees to an asbestos hazard.  Abatement Note:  Abatement certification is required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1101 K09 I

Serious Gravity 5 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $0 · Current $0
29 CFR 1926.1101(k)(9)(i):  The employer did not institute, at no cost to employees, a training program for each employee who was likely to be exposed in excess of the permissible exposure limit (PEL) and for each employee who performed Class I through IV asbestos operations:  (a)  Aaroh Construction at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, the employer did not train employees performing Class I and Class II asbestos work in the hazards associated with asbestos.  This condition exposed employees to an asbestos hazard.  Abatement Note:  Abatement certification is required for this item (see enclosed Certification of Corrective Action Worksheet).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1101 O01

Serious Gravity 5 1 instance 10 exposed
Issued
Sep 14, 2011
Abate by
Sep 29, 2011
Penalty
Initial $3,000 · Current $800 Reduced
29 CFR 1926.1101(o)(1):  On all construction worksites covered by 29 CFR 1926.1101, the employer did not designate a competent person having the qualifications and authorities for ensuring worker safety and health:  (a)  Aaroh Construction at 65 North Broadway, Denver, CO 80203:  On and before May 13, 2011, the employer did not designate a competent person having the qualifications and authorities for ensuring worker safety and health.  Employees performed demolition work of the interior structure of the facility.  This work exposed employees to asbestos.  This condition exposed employees to an asbestos hazard.  Abatement Note:  A competent person is capable of identifying existing asbestos hazards in the workplace and capable of selecting the appropriate control strategy for asbestos exposure, and who has the authority to take prompt corrective measure to eliminate them.    Abatement Note:  Abatement certification is required for this item (see enclosed Certification of Corrective Action Worksheet).
Recent events (2)
  • · I (S) $800
  • · Z (S) $3000