Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MIKE CACHEY CONST. COMPANY INCORPORATED

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of MIKE CACHEY CONST. COMPANY INCORPORATED in 133 EAST BRUSH HILL, ELMHURST, IL 60126 (NAICS 238140). OSHA activity number 330974718.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Mike Cachey Const. Company Incorporated — free Get an email when a new federal OSHA severe-injury report for Mike Cachey Const. Company Incorporated is published. One employer, no account, unsubscribe in one click.
Site address
133 EAST BRUSH HILL
City
ELMHURST
State
IL
ZIP
60126
Mailing
11415 183RD PLACE # A, ORLAND PARK, IL 60467
Inspection type
Unprogrammed Related (G)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
15
Ownership type
A

1 citation on file for this inspection.

1926.452 C05 III

Serious Gravity 10 1 instance 1 exposed
Issued
Oct 27, 2011
Abate by
Nov 3, 2011
Penalty
Initial $4,620 · Current $3,234 Reduced
29 CFR 1926.452(c)(5)(iii):     Brackets used to support cantilevered were not used only to support personnel, and the scaffold was not designed for other loads by a qualified engineer and built to withstand the tipping forces caused by those other loads being placed on the bracket-supported section of the scaffold.    On August 12, 2011 at a worksite located at 133 Brush Hill Road, Elmhurst IL. The employer placed a mortar tub on the supported bracket section of the scaffold. The mortar tub was half on the bracket section and half on the center platform. The mortar tub was approximately half full of mortar.    Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
  • — I (S) $3234
  • — Z (S) $4620

View Mike Cachey Const. Company Incorporated's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 330974718.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.