OSHA Inspection: CERTAINTEED CEILINGS

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of CERTAINTEED CEILINGS in 1415 PILGRIM ROAD, PLYMOUTH, WI 53073 (NAICS 327993). OSHA activity number 331065169.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Certainteed Ceilings — free Get an email when a new federal OSHA severe-injury report for Certainteed Ceilings is published. One employer, no account, unsubscribe in one click.
Site address
1415 PILGRIM ROAD
City
PLYMOUTH
State
WI
ZIP
53073
Mailing
1415 PILGRIM ROAD, PLYMOUTH, WI 53073
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
327993
Employees
53
Ownership type
A

4 citations on file for this inspection.

1910.219 C02 I

Serious Gravity 5 2 exposed
Issued
Jan 11, 2012
Abate by
Feb 10, 2012
Penalty
Initial $5,100 · Current $3,000 Reduced
29 CFR 1910.219(c)(2)(i):     All exposed part(s) of horizontal shafting seven (7) feet or less from floor or working platform were not protected by stationary casing(s) enclosing shafting completely or by trough(s) enclosing sides and top or sides and bottom of shafting:    a)    Unguarded rotating shaft for Automated Conveyor systems drive unit.    ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $3000
  • — Z (S) $5100

1910.147 C06 I C

Deleted Other-than-serious 1 exposed
Issued
Jan 11, 2012
Abate by
Feb 10, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(6)(i)(C):     Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected:    a)    Companies energy control program did not include a periodic inspection.    ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.219 D01

Other-than-serious 1 exposed
Issued
Jan 11, 2012
Abate by
Feb 10, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.219(d)(1):     Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o):    a)    Hold down belts did not have pulleys guarded where employee was cleaning a chain.    ABATEMENT CERTIFICATIONA AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1910.219 E03 I

Other-than-serious 1 exposed
Issued
Jan 11, 2012
Abate by
Feb 10, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.219(e)(3)(i):     Vertical or inclined belt(s) were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o):    a)    Hold down belts were not guarded where they met the pulleys creating an ingoing nip point.    ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

View Certainteed Ceilings's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331065169.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.