Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,194,531Inspections Most recent open 2026-08-11 Last loaded 2026-08-14

OSHA Inspection: CLEVELAND METAL EXCHANGE

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of CLEVELAND METAL EXCHANGE in 1900 CASE PARKWAY, TWINSBURG, OH 44087 (NAICS 423510). OSHA activity number 331092510.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Cleveland Metal Exchange for free Get an email when a new federal OSHA severe-injury report for Cleveland Metal Exchange is published. One employer, no account, unsubscribe in one click.
Site address
1900 CASE PARKWAY
City
TWINSBURG
State
OH
ZIP
44087
Mailing
1900 CASE PARKWAY, TWINSBURG, OH 44087
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
423510
Employees
30
Ownership type
A

7 citations on file for this inspection.

1910.147 C07 I A

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 13, 2012
Penalty
Initial $4,900 · Current $4,440 Reduced
29 CFR 1910.147(c)(7)(i)(A):     Authorized employee(s) did not receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation and control:    On or before 11/8/2011, employees who were trained as "affected" employees, had not received training as authorized employees when required to do servicing to the slitter.  Employees did not receive training in the recognition of hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation and control.
Recent events (2)
  • · I (S) $4440
  • · Z (S) $4900

1910.147 D04 I

Serious Gravity 10 1 instance 1 exposed
Issued
Mar 13, 2012
Abate by
Mar 20, 2012
Penalty
Initial $4,900 · Current $0 Reduced
29 CFR 1910.147(d)(4)(i):     Lockout or tagout devices were not affixed to each energy isolating device by authorized employees:    On or before 11/8/11, employees who are required to do servicing/maintenance on the slitter, did not lockout the machine prior to doing any servicing.
Recent events (2)
  • · I (S) $0
  • · Z (S) $4900

1910.179 J02

Serious Gravity 1 1 instance 2 exposed
Issued
Mar 13, 2012
Penalty
Initial $2,100 · Current $1,260 Reduced
29 CFR 1910.179(j)(2):     An inspection program for cranes in regular use, with an inspection frequency of daily to monthly intervals, was not established:    On or before 11/21/11, the employer did not have a daily to monthly inspection program in place for their 10 ton and 30 ton overhead gantry cranes at the facility.
Recent events (2)
  • · I (S) $1260
  • · Z (S) $2100

1910.212 A03 II

Serious Gravity 10 2 instances 2 exposed
Issued
Mar 13, 2012
Abate by
Apr 17, 2012
Penalty
Initial $4,900 · Current $2,940 Reduced
29 CFR 1910.212(a)(3)(ii):     Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s):    (a)  The Big shear, operated automatically, did not have any point of operation guarding;    (b)  The 60 inch slitter did not have point of operation guarding for the rollers.
Recent events (2)
  • · I (S) $2940
  • · Z (S) $4900

1910.219 F03

Serious Gravity 5 2 instances 2 exposed
Issued
Mar 13, 2012
Abate by
Mar 20, 2012
Penalty
Initial $3,500 · Current $2,100 Reduced
29 CFR 1910.219(f)(3):     Sprocket wheels and chains which were seven -7 feet or less above floors or platforms were not enclosed:    (a)  There were unguarded chains on the centering guide, approximately 2 feet from floor level;    (b)  There were unguarded chains on the uncoiler, approximately 5 feet from flloor level.
Recent events (2)
  • · I (S) $2100
  • · Z (S) $3500

1910.305 B02

Serious Gravity 1 1 instance 1 exposed
Issued
Mar 13, 2012
Abate by
Mar 16, 2012
Penalty
Initial $2,100 · Current $1,260 Reduced
29 CFR 1910.305(b)(2):     Each outlet box in completed installations did not have a cover, faceplate, or fixture canopy:    The electrical cover for the turnstile had the electrical cover have off, exposing live wires.
Recent events (2)
  • · I (S) $1260
  • · Z (S) $2100

1910.132 D01

Other-than-serious 1 instance 3 exposed
Issued
Mar 13, 2012
Abate by
Apr 12, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.132(d)(1):     The employer did not assess the workplace to determine if hazards were present, or were likely to be present, which necessitated the use of personal protective equipment:    On or before 11/21/11, no written hazard assessment had been conducted or certified by the employer.  The employees perform operations including, but not limited to, operating shears, slitters, cranes, etc.    NOTE:  The assessment shall be written, titled, dated and certified b y the signature.  The required documented training shall include the following:    1)  When PPE is necessary;    2)  What PPE is necessary;    3)  Limitations of the PPE;    4)  How to properly wear and use PPE; and    5)  Inspection and care of the PPE
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331092510.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.