MERIDEN, NH ·
OSHA Inspection: SUPERIOR FABRIC STRUCTURES
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of SUPERIOR FABRIC STRUCTURES in KIMBALL UNION ACADEMY 7 CAMPUS CENTER DR., MERIDEN, NH 03770 (NAICS 238120). OSHA activity number 331100958.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SUPERIOR FABRIC STRUCTURES
- Site address
- KIMBALL UNION ACADEMY 7 CAMPUS CENTER DR.
- City
- MERIDEN
- State
- NH
- ZIP
- 03770
- Mailing
- 36 KIMBERLY AVE, NEW PROVIDENCE, PA 17560
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238120
- Employees
- 320
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.602 D
- Issued
- Apr 27, 2012
- Abate by
- Apr 30, 2012
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1926.602(d): The employer did not certify that each operator had been trained and evaluated as required by paragraph 29 CFR 1910.178(l): (a) Kimball Union Academy Field House - The employer did not ensure the operator was trained in the Ingersoll-Rand All-Terrain Powered Industrial truck.
Recent events (1)
- · Z (S) $7000
1926.761 C02 I
- Issued
- Apr 27, 2012
- Abate by
- Apr 30, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.761(c)(2)(i): The employer did not ensure each connector had been provided proper training in the hazards associated with connecting. (a) Kimball Union Field House - Employees were not trained in connecting and the hazards of erecting structual steel.
Recent events (1)
- · Z (S) $0
1926.752 B
- Issued
- Apr 27, 2012
- Abate by
- Apr 30, 2012
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1926.752(b): A steel erection contractor erected steel without written notification that the concrete in the footings, piers and walls or the mortar in the masonry piers and walls has attained, on the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during steel erection. (a) Kimball Union Academy Field House The Structural Steel was erected without the written notification that the concrete piers on I line had sufficient strength to carry the intended load.
Recent events (1)
- · Z (S) $7000
1926.754 A
- Issued
- Apr 27, 2012
- Abate by
- Apr 30, 2012
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1926.754(a)(1): Structual stability was not maintained at all times during the erection process. KImball Union Academy Field House - The employer did not ensure that the following manufacturer instructions were followed: a. Bolts were installed in all holes of the connection and brought to a snug tight condition. On November 16, 2011, a rafter (truss) was missing several bolts, bolts were inserted no nuts attached and other bolts had loose nuts. b. Portions of the building were installed on uncured concrete. The employer damaged Pier 18 and continued construction of the building. c. The employer did not install a braced bay first in that the employer did not install temporary bracing, the end wall column was not installed, temporary bracing to the rafter beam (trusses) were not utilized, and purlins were not attached to each rafter beam. d. The employer did not install any brace flanges. e. The employer did not not install wind bracing in that was not installed appropriately in the 4 bays where it was required. It 3 of the 4 bays there was no wind bracing and the 4th bay had bracing which was loose and not effective. f. The employer erected all the columns along the East and West side of the building prior to installing either end wall column. g. The employer did not install purlins securing one truss to another in the manner recommended by the manufacturer.
Recent events (1)
- · Z (S) $7000
More inspections at Superior Fabric Structures
View Superior Fabric Structures's full OSHA safety record →
More inspections in this industry (NAICS 238120)
More inspections in NH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331100958.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.