DENVER, CO —
OSHA Inspection: PERCOCO MARBLE & TILE COMPANY, INC.
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of PERCOCO MARBLE & TILE COMPANY, INC. in 1280 WEST BAYAUD AVENUE, DENVER, CO 80223 (NAICS 327991). OSHA activity number 331102848.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PERCOCO MARBLE & TILE COMPANY, INC.
- Site address
- 1280 WEST BAYAUD AVENUE
- City
- DENVER
- State
- CO
- ZIP
- 80223
- Mailing
- 1280 WEST BAYAUD AVENUE, DENVER, CO 80223
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 327991
- Employees
- 9
- Ownership type
- A
Citations
2 citations on file for this inspection.
1910.147 D04 I
- Issued
- Jan 20, 2012
- Abate by
- Feb 19, 2012
- Penalty
- Initial $1,377 · Current $0 Reduced
General-duty citation text
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: Percoco Marble & Tile Company Inc, at 1280 W Bayaud Avenue, Denver, CO: On or about 11/14/11, Percoco Marble & Tile Company Inc did not ensure that a lockout or tagout device was affixed to each energy isolating device by authorized employees. One employee replaced the motor pulley of the Filli Zambon Hydro AE bridge saw to enable cutting of glass rather than stone. The employee deenergized the bridge saw prior to work. The employer did not ensure that a lock was placed on the disconnecting means used to deenergize the bridge saw. This condition exposed the employee to an electrical hazard.
Recent events (2)
- — I (O) $0
- — Z (S) $1377
1910.147 C04 II B
- Issued
- Jan 20, 2012
- Abate by
- Feb 19, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: Percoco Marble & Tile Company Inc, at 1280 W Bayaud Avenue, Denver, CO: On and preceding 12/14/11, Percoco Marble & Tile Company Inc did not ensure that the energy control procedures clearly and specifically outlined the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. Employees and contractors perform service upon the Breton NC350 CNC machine, Park Industries ProEdge III, and Ordway bridge polisher. Each piece of equipment has multiple energy sources, electrical and pneumatic. The employer's energy control procedures for each piece of equipment did not specifically outline the steps for shutting down, isolating, and securing to control energy. This condition potentially exposed employees and contractors to hazardous energy sources.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Percoco Marble & Tile Company, INC.
View Percoco Marble & Tile Company, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 327991)
More inspections in CO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331102848.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.