OSHA Inspection: M - M MASONRY

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of M - M MASONRY in 235 N. 7TH STREET, MARIETTA, OH 45750 (NAICS 238140). OSHA activity number 331103150.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch M - M Masonry — free Get an email when a new federal OSHA severe-injury report for M - M Masonry is published. One employer, no account, unsubscribe in one click.
Establishment
M - M MASONRY
Site address
235 N. 7TH STREET
City
MARIETTA
State
OH
ZIP
45750
Mailing
2100 BUILDERS PLACE, COLUMBUS, OH 43204
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
25
Ownership type
A

4 citations on file for this inspection.

1926.51 F01

Serious Gravity 1 2 instances 6 exposed
Issued
Jan 5, 2012
Abate by
Jan 12, 2012
Penalty
Initial $1,785 · Current $1,071 Reduced
29 CFR 1926.51(f)(1):     The employer shall provide adequate washing facilities for employees engaged in the application ofpaints, coating, herbicides, or insecticides, or in other operations where contaminants may be harmful to the employees. Such facilities shall be innear proximity to the worksite and shall be so equipped as to enable employees to remove such substances.    a.   On the east side scaffold where mortar was used which contained Portland Cement, clean water, towels and non alkaline soap was not provided where employees were able to gain access to the material in case of an emergency thereby exposing employees to a contact hazard.    b.   On the West side of the building where mortar was used which contained Portland Cement, clean water, clean towels and non alkaline soap was not provided where employees could gain access to the material in case of an emergency thereby exposing employees to a contact hazard.
Recent events (2)
  • — I (S) $1071
  • — Z (S) $1785

1926.451 B01 I

Serious Gravity 5 1 instance 3 exposed
Issued
Jan 5, 2012
Penalty
Initial $2,380 · Current $1,428 Reduced
29 CFR 1926.451(b)(1)(i):     Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).    a.   On the 4th level of north side of the building where masonry work was performed, there was an opening in the walkway planking which measured 12 inches by 42 inches thereby exposing employees to a trip/fall hazard.
Recent events (2)
  • — I (S) $1428
  • — Z (S) $2380

1926.451 E04 XII

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 5, 2012
Penalty
Initial $2,975 · Current $1,785 Reduced
29 CFR 1926.451(e)(4)(xii):     Guardrails meeting the requirements of paragraph (g)(4) of this section shall be provided onthe open sides and ends of each landing.      a.   On the third level of the building where employees had to access a landing to gain access to the mobile scaffold, guardrails were not installed on all ends thereby exposing employees to a fall hazard.
Recent events (2)
  • — I (S) $1785
  • — Z (S) $2975

1926.451 G04 I

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 5, 2012
Abate by
Jan 12, 2012
Penalty
Initial $2,975 · Current $1,785 Reduced
29 CFR 1926.451(g)(4)(i):     Guardrail systems shall be installed along all open sides and ends of platforms. Guardrailsystems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.      a.   On the west side of the hydro mobile scaffold where employees were installing brick on the side of the building, there was a section of guardrail missing thereby exposing employees to a 20 foot fall fazard.
Recent events (2)
  • — I (S) $1785
  • — Z (S) $2975

View M - M Masonry's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331103150.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.