LOMBARD, IL ·
OSHA Inspection: TELLA TOOL & MANUFACTURING COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of TELLA TOOL & MANUFACTURING COMPANY in 1015 N. RIDGE AVENUE, LOMBARD, IL 60148 (NAICS 332116). OSHA activity number 331105353.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- TELLA TOOL & MANUFACTURING COMPANY
- Site address
- 1015 N. RIDGE AVENUE
- City
- LOMBARD
- State
- IL
- ZIP
- 60148
- Mailing
- 1015 N. RIDGE AVENUE, LOMBARD, IL 60148
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332116
- Employees
- 41
- Ownership type
- Private (A)
Citations
9 citations on file for this inspection.
1910.147 C04 I
- Issued
- Apr 25, 2012
- Abate by
- May 25, 2012
- Penalty
- Initial $3,500 · Current $2,450 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: Tella Tool & Mfg. Company did not develop machine specific lockout procedures. Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).
Recent events (2)
- · I (S) $2450
- · Z (S) $3500
1910.147 C06 I
- Issued
- Apr 25, 2012
- Abate by
- May 25, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: Tella Tool & Manufacturing Company did not conduct an annual inspection of their energy control/lockout procedure. Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.212 A03 II
- Issued
- Apr 25, 2012
- Abate by
- May 5, 2012
- Penalty
- Initial $3,500 · Current $2,450 Reduced
General-duty citation text
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): a. The point of operation on the Wyson 60 Ton Press Brake was not adequately guarded as there was a 1 1/4 inch opening between the dies. b. The point of operation on the Tarasconi Press brake was not adequately guarded as there was a 1/2 inch opening between the dies. Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).
Recent events (2)
- · I (S) $2450
- · Z (S) $3500
1910.212 A01
- Issued
- Apr 25, 2012
- Abate by
- May 25, 2012
- Penalty
- Initial $3,500 · Current $2,450 Reduced
General-duty citation text
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks. On the following part revolution clutch mechanical power presses, the sides of the presses were not guarded to prevent access to the dies: a. Press #22, Verson, 150 Ton mechanical power press b. Press #20, Cleveland, 150 Ton mechanical power press c. Bliss, 60 Ton mechanical power press d. Wasino 60 Ton mechanical power press Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).
Recent events (2)
- · I (S) $2450
- · Z (S) $3500
1910.217 B07 V A
- Issued
- Apr 25, 2012
- Abate by
- Jun 7, 2012
- Penalty
- Initial $3,500 · Current $2,450 Reduced
General-duty citation text
29 CFR 1910.217(b)(7)(v)(a): Each two-hand control for single stroke operations on mechanical power press(es) using part revolution clutches was not arranged by design, construction and/or separation so that the concurrent use of both hands was required: On Press #20, Cleveland, 150 Ton mechanical power press, the two hand controls were not equipped with ring guards and were spaced too close together. The controls could be pressed with the elbow and fingers of one hand. Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).
Recent events (2)
- · I (S) $2450
- · Z (S) $3500
1910.217 C01 I
- Issued
- Apr 25, 2012
- Abate by
- May 25, 2012
- Penalty
- Initial $3,500 · Current $2,450 Reduced
General-duty citation text
29 CFR 1910.217(c)(1)(i): The employer did not provide and ensure the usage of point of operation guards or properly applied point of operation devices on every operation performed on mechanical power press(es): On the #16 Stamtec 600 Ton mechanical power press, the light curtain was placed too far from the point of operation and the setup operator could stand between the bolster plate and the light curtain. The light curtain was placed 18 inches in front of the bolster plate. Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).
Recent events (2)
- · I (S) $2450
- · Z (S) $3500
1910.217 C02 I A
- Issued
- Apr 25, 2012
- Abate by
- May 25, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.217(c)(2)(i)(a): Point of operation guard(s) on mechanical power press(es) did not prevent entry of hands or fingers into the point of operation by reaching through, over, under or around the guard(s): On the Niagara 200 Ton mechanical power press, the light curtain was placed too high up and the operator could reach under the light curtain into the point of operation. Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.217 E01 I
- Issued
- Apr 25, 2012
- Abate by
- May 25, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.217(e)(1)(i): The employer did not maintain a certification record of inspections which includes the date of inspection, the signature of the person who performed the inspection and the serial number, or other identifier, of the power press that was inspected: Tella Tool & Manufacturing did not maintain certification recordes of mechanical power press inspections. Abatement documentation required for this item in accordance with 29 CFR 1903.19(d).
Recent events (2)
- · I (O) $0
- · Z (O) $0
1910.1200 E01
- Issued
- Apr 25, 2012
- Abate by
- May 25, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: Tella Tool & Manufacturing Company did not develop or implement a written hazard communication program. Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).
Recent events (2)
- · I (O) $0
- · Z (O) $0
More inspections in this industry (NAICS 332116)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 331105353.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.