OSHA Inspection: VALENTINE CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of VALENTINE CONSTRUCTION in 473 LEWISVILLE ROAD, WOODSFIELD, OH 43793 (NAICS 238140). OSHA activity number 331106138.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Valentine Construction — free Get an email when a new federal OSHA severe-injury report for Valentine Construction is published. One employer, no account, unsubscribe in one click.
Site address
473 LEWISVILLE ROAD
City
WOODSFIELD
State
OH
ZIP
43793
Mailing
7680 WHIPPLE AVE. NW, NORTH CANTON, OH 44720
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
28
Ownership type
A

4 citations on file for this inspection.

1926.51 F01

Serious Gravity 1 1 instance 17 exposed
Issued
Jan 19, 2012
Abate by
Jan 26, 2012
Penalty
Initial $1,785 · Current $1,190 Reduced
29 CFR 1926.51(f)(1):     The employer shall provide adequate washing facilities for employees engaged in the application ofpaints, coating, herbicides, or insecticides, or in other operations where contaminants may be harmful to the employees. Such facilities shall be innear proximity to the worksite and shall be so equipped as to enable employees to remove such substances.    a.    On the site where employees used mortar which contained chemicals such as Portland Cement, the employer did not provide clean water, clean towels and non alkaline soap thereby exposing employees to a contact hazard.
Recent events (2)
  • — I (S) $1190
  • — Z (S) $1785

1926.451 G04 I

Serious Gravity 5 1 instance 4 exposed
Issued
Jan 19, 2012
Penalty
Initial $2,975 · Current $1,785 Reduced
29 CFR 1926.451(g)(4)(i):     Guardrail systems shall be installed along all open sides and ends of platforms. Guardrailsystems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.      a.    On the southwest corner of the front scaffold, there was a 20 inch x 6 feet opening in the front of the scaffold thereby exposing employees to a fall hazard.
Recent events (2)
  • — I (S) $1785
  • — Z (S) $2975

1926.451 H01

Other-than-serious 1 instance 17 exposed
Issued
Jan 19, 2012
Abate by
Jan 26, 2012
Penalty
Initial $2,975 · Current $1,785 Reduced
29 CFR 1926.451(h)(1):     In addition to wearing hardhats each employee on a scaffold shall be provided with additionalprotection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, or guardrail systems, or throughthe erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects. When the falling objects are toolarge, heavy or massive to be contained or deflected by any of the above-listed measures, the employer shall place such potential falling objects awayfrom the edge of the surface from which they could fall and shall secure those materials as necessary to prevent their falling.      a.    On the tubular welded frame scaffold where employees were laying block, the employer did not use another meathod of over head protection to supply overhead protection for employees working below the scaffold thereby exposing employees to a struck-by hazard.
Recent events (2)
  • — I (O) $1785
  • — Z (S) $2975

1926.452 C05 III

Deleted Serious Gravity 1 1 instance 17 exposed
Issued
Jan 19, 2012
Penalty
Initial $1,785 · Current $0 Reduced
29 CFR 1926.452(c)(5)(iii):     Be used only to support personnel, unless the scaffold has been designed for other loads by aqualified engineer and built to withstand the tipping forces caused by those other loads being placed on the bracket-supported section of thescaffold.      a.    On the west side of the north classrooms, the employer piled bricks, block and tools on the outrigger away from the building which should have been used for personnel only thereby exposing employees to a struck-by hazard.
Recent events (2)
  • — I (S) $0
  • — Z (S) $1785

View Valentine Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331106138.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.